Key takeaways
- One sign-in app over QuickBooks Online, Procore, Ramp and Microsoft 365 gives each role its own slice: field users code card charges, PMs see their jobs, executives see the company.
- Role filtering happens on the server. A field user sees a project list with no contract, cost, margin or grade, and a URL edit returns an error, not hidden data.
- The approvals queue is the core: on sample data it starts at $14,346 not in Procore, and every approval moves that number on Home, Projects and the company dashboard.
- Each project page has six tabs (overview, grade, job cost, expenses, subs, files), and the overview leads with whether QuickBooks and Procore agree on job cost.
- A weighted grade ranks jobs, a month-end close locks a signed-off WIP schedule, and alerts link back to the evidence behind each number.
- Support uses a read-only view as that blocks QuickBooks writes, approvals and user changes, and logs both identities.
- An AI vendor connects through an iframe embed, scoped read-only API keys and an MCP server, with no write tools without written approval.
53 seconds · From a Build Flows walkthrough
Home: what needs your approval, and the numbers that matter
The home screen leads with what to approve, then cash, backlog, gross margin, underbilling, uncoded card spend, alerts, sign-offs, pipeline and system health.
Read the clip transcript
their approval system to go through and review all of those and assign them to the correct cost code but essentially when you get signed in here you'll see that we have a proper dashboard for the main thing of what needs to be approved and then we have an example dashboard for data here of how we're bringing in cash and the backlog gross margin underbilled and any uncoded cards that are unspent as well I think that needs to be brought into attention here any alerts or warnings and then any sign off that need to occur and what the pipeline is for projects that are currently in build we have system health these are connections right now we're just doing sample uh sample data from live endpoints so it's still the same data structure and endpoints but we're just giving sample data right now and then we'll be provisioning access to the connectors here and then these are the steps to get started and so what we'll do here is initially just go in to the review and
Captions adapted from the source video; proper names may reflect automatic transcription. Original segment: 13:16–14:09. Watch at the source.
84 seconds · From a Build Flows walkthrough
Create project, then Convert to won starts Procore
Creating a project builds the OneDrive folder. Converting it to won kicks off a workflow that creates the Procore project with your naming standard.
Read the clip transcript
it next what we're doing is then we've went through and done all the expenses and the approvals so now it's diving into the project section so the project section essentially is going through and as they're documenting and tracking projects that are progressing they're essentially wanting to manage these and so they'll come in here and create a new project which ultimately creates a new OneDrive folder and that OneDrive folder has a specific structure of their team needs but then they'll be able to come in here and track all of their specific projects and so if we go into a project here so this one is currently in pursuit we'll be able to then see here now that we have the overview and so there's no financials here because it's just in pursuit there's no grade because it's all still in pursuit no job costs or expenses but then essentially what we're going to be able to do is we're going to do is we convert this to won and we press approve and fantastic so once we converted it to won essentially what that does is that now kicks off a workflow to then generate and start a new project in Procore and so that new project in Procore is then created and then mapped to this specific standard structure for how we name everything and assign everything to it and essentially then from here we have that project now where we'd be pulling in all that data we'd be just kind of having it reverse and it be set up properly and assigned to everything that is necessary to it and all of the analytics and insights then are
Captions adapted from the source video; proper names may reflect automatic transcription. Original segment: 16:19–17:43. Watch at the source.
A project operating system is one sign-in app that sits on top of a contractor's accounting, project management and card systems and gives each person the slice they need: field users code their card charges, project managers see their jobs, executives see the company. This guide is a screen-by-screen tour of the one we built for Cattlemen Construction Services, a general contractor and design-build firm in Fort Worth, TX. It runs on sample data over QuickBooks Online, Procore, Ramp and Microsoft 365. For each screen we cover what it shows, who sees it and why it's built that way, with the real sample numbers, and we link to a deeper guide for each major area.
The whole app on one page
This is the third section of a three-part release. The first explains why Ramp bills show $0 in Procore and how we fix it. The second is the rollout roadmap from proof of concept to live. This one is the app itself. You can watch the walkthrough; the app tour starts at about 12:37 and runs to the end. Timestamps for each screen are below.
Why one app
Ryan Blankers, Cattlemen's co-founder, had three requirements that shaped everything here.
- "I want it to be one system if possible." Not a coding tool in one tab, a dashboard in another and a folder site in a third.
- "I don't want to create myself another job of having to go check somebody." Every screen has to make checking faster, not add a check.
- "Hire performers rather than administrators." If a screen makes someone re-key data, it fails.
And one constraint from me: the analysis is only as good as the inputs. So the app does two jobs at once. It shows the numbers, and it pushes people to put good data into Procore and QuickBooks in the first place.
Who sees what
Before the screens, the roles. Every screen below is filtered by them, and the filtering happens on the server: a field user who types a project URL gets an error, not a hidden page.
Five rings, each including the one inside
| Role | Sees | Can't see | Why |
|---|---|---|---|
| Field | Own card charges; a project list with number, name, client and status | Contract, cost, margin, billing, EAC, grade | They need to code a charge to the right job. They don't need the job's margin to do it |
| Project manager | Own and team charges; assigned jobs with financials; reports for those jobs; month-end forecasts | Other PMs' jobs, company totals | Accountable for their jobs, not the company's |
| Executive | Everything financial, every job and charge, the audit log | Users, connections, API keys | Runs the company, doesn't administer the software |
| Admin | All of the above plus users, connections, settings, QuickBooks write mode, API keys | The platform console | Runs the software for the company |
| Super admin | Platform console, sessions, read-only "view as" | Nothing, but every action is logged with both identities | That's us, for support. Not a Cattlemen account |
The full design, including "view as" rules and what's blocked during it, is in roles and view-as access control.
Where the numbers come from
How fresh each number is
| Source | Brings | How often |
|---|---|---|
| QuickBooks Online | Job cost, bills, card expenses, invoices, AR, cash | Nightly, plus every 15 minutes and webhooks for new charges |
| Procore | Projects, budgets, commitments, change orders, direct costs, schedule, inspections, RFIs, submittals, daily logs | Nightly, plus Sync now |
| Ramp | Cardholders, card charges, receipts | Every 15 minutes, plus webhooks |
| Microsoft 365 | Project folders in SharePoint and OneDrive | When a project is created or opened |
| The app itself | Coding, approvals, forecasts, grade weights, alerts handled | Instantly |
In the proof of concept, every one of these is sample data with the same structure as the live feeds. As I put it on the recording, "it's still the same data structure and endpoints but we're just giving sample data right now." A Sample data badge sits on every screen until an admin switches the data mode to live.
1. Sign-in and Home (12:40 to 14:05)
Everyone signs in with their own email and password; there are no shared logins. Admins are asked to turn on two-step sign-in (a banner gives the deadline). Sessions last 12 hours.
Home for an executive (sample data)
Home answers one question: what should I do now? For an executive on the sample data:
- Do this now: 5 charges waiting for your approval, with Review and approve.
- 2 forecasts waiting for your review (month-end) and 4 critical alerts.
- Tiles: Cash $2.71M ($1.15M owed to us, $290K over 60 days), Backlog $5.88M (5 active jobs), Gross margin YTD 15.3% on $21.5M revenue, Underbilled $210K, Uncoded $14K (25 charges not in Procore).
- Needs attention, the November close progress, and the Pipeline (weighted value of pursuits).
- System health: go-live setup steps, the status of each connection, sync errors in the last 7 days.
A field user's Home is different on purpose: a big number of card charges to code, the next one up with its suggested cost code and an Approve button, and nothing about company money. Why: the field user's only job in this app is coding their card, so Home is that job.
2. My expenses and Approvals (14:05 to 16:20)
These two screens are the reason the app exists. Card charges sync from Ramp to QuickBooks as Category details lines, and Procore's QuickBooks Online connector only reads lines coded to the Procore-created service item for a job and cost code. So card spend shows up in QuickBooks and not in Procore.
My expenses is where each cardholder codes their own charges. Suggested codes are pre-filled, Approve has a 10-second undo, and Approve all suggested clears a batch after one preview.
Approvals is where PMs and executives check and approve. On the sample data: Not in Procore yet $14,346, To code 18 (5 ready to approve), Oldest open 16 days (3 over 14 days), Synced this week 0. Filters default to Needs action, oldest first; Select 5 ready to approve and Group by person make it a two-minute job.
Click a charge and the expense page shows What happens in QuickBooks: the Category details line before, the Item details line after approve (25-014-01-100.E, project 25-014, cost code 01-100, cost type E), "Total unchanged $455.00", and the Procore direct cost going from $0.00 to $455.00. After one approval in the walkthrough, Not in Procore dropped to $13,891 and Synced this week read $455.
Who sees it: field users see My expenses only. PMs see Approvals for their jobs, executives for everyone. Why: one person controls where costs go, and cardholders do most of the coding.
Deeper guide: the bill and card coding approvals queue.
3. Projects (16:20 to 18:50)
Every job, numbered YY-NNN (sample data)
The Projects list shows every job, numbered YY-NNN by client. Sample tiles: 8 open projects (2 in pursuit, 5 active), $13.8M open contract, 5 clients, $14K uncoded card spend. Columns: client, status, PM, grade, contract, % complete, margin, uncoded. Switch between List and By client.
New project takes a name, number and client and creates the standard folder set in SharePoint from a template. Pursuits live here before they're won, so lost bids never clutter Procore.
Convert to won turns a pursuit into a job. In the walkthrough we converted 26-008 Clearfork Medical Imaging Suite. Confirming kicks off creating the Procore project with the same name and number. In the proof of concept that step runs in dry run, and the app says so: the Procore project is created once the connections are switched on. Then the button changes to Start construction.
Each project page has six tabs:
| Tab | What it shows | Source |
|---|---|---|
| Overview | Revised contract, cost to date, EAC, projected margin, % complete, earned, over/under billing, AR open; a contract-to-margin chart and billing position; a check that QuickBooks and Procore agree on job cost; alerts for the job | Procore, QuickBooks |
| Grade | 0-100 grade, rank, coverage, weakest pillar, points by pillar, every measure | Procore, QuickBooks, the app |
| Job cost | By cost code: budget, committed, actual in QuickBooks, actual visible in Procore, variance, % used | Procore, QuickBooks |
| Expenses | The job's card charges and their coding status | Ramp, the app |
| Subs | Subcontractors on the job, COIs expiring, lien waivers missing | Procore, the app |
| Files | The job's SharePoint folder | Microsoft 365 |
The Overview's top line is the one Ryan cares about. On the top-ranked sample job it reads "Cost in QuickBooks not yet visible in Procore $3,964" with a Code those expenses button, above revised contract $1.91M, cost to date $812K, EAC $1.62M, projected margin 15.5% and 50% complete. On a job where everything is coded it reads "QuickBooks and Procore agree. Every dollar of job cost in QuickBooks is visible in Procore."
The Job cost tab shows the gap line by line. "Actual in QuickBooks" minus "actual visible in Procore" is spend Procore can't see yet, and the nightly reconciliation tracks it per job until it's $0.
The Subs tab is covered in subcontractor compliance tracking: COIs and lien waivers.
The Files tab shows the project folder: 01 Preconstruction (bid documents, estimate, proposal, site visit photos), 02 Contract (owner contract, insurance and bonds, change orders), 03 Drawings & Specs, 04 Permits, 05 Subcontracts & POs (including lien waivers), 06 Submittals & RFIs, 07 Schedule and so on. As I said in the walkthrough, "if you're interacting with a file here in the operating system, it's the same as interacting with the file as you are in OneDrive." The folder design is in SharePoint and OneDrive project folder structure.
Who sees it: PMs see their assigned jobs with financials. Executives and admins see all jobs and can create and convert projects. Field users get the list without money, for coding. Why: a PM is judged on their jobs; the partners on all of them.
4. Grade (19:55 to 20:55)
Every active and won job gets a 0-100 grade from five pillars, each 20% by default: Schedule, Financials, Safety, Quality and Project Controls. Risk (subcontractor insurance) shows at 0% until an executive turns it on. Each pillar is the average of measures scored against bands: look-ahead updated in the last 7 days, cash collected vs paid out, card spend coded within 7 days, open RFIs past due, and so on.
On the sample data the portfolio averages 83 across 6 graded jobs: 2 on track (90+), 3 monitor (75-89), 1 needs attention (under 75). 26-004 Clearfork Medical Office TI grades 79.5, Monitor, with Financials its weakest pillar.
Executives change the weights, measures and bands on Grade & weights, with a live what-if that shows which jobs would change rank or band before anything is saved. PMs see their own jobs' grades but can't change the method.
Deeper guide: the weighted project grade scorecard, with a full worked example and a CSV template.
5. Month-end (18:51 to 19:15)
Each month an executive opens the close. Each PM forecasts cost to complete by cost code for their jobs, which sets the EAC, and submits. The executive reviews every job, approves or sends it back with a comment, and locks the month, which freezes the WIP schedule. Only an admin can unlock, with a written reason.
On the sample November close: one job approved, two awaiting review, one sent back, one in draft, one not started. 26-004 Clearfork Medical Office TI shows a forecast EAC of $1,100,075 on a $1,278,000 contract, a projected margin of 13.9% (up 6.8 points from last month), 55.5% complete and $70K under billed. A big jump like that is the reviewer's cue to ask for backup.
Who sees it: PMs forecast their own jobs. Executives and admins open, review and lock. Field users don't see it. Why: the PM knows what's left to spend; an executive should question it before it becomes revenue.
Deeper guide: the month-end cost-to-complete and EAC review, with formulas and a worksheet.
6. Company (19:16 to 19:55)
The executive's company view (sample data)
The Company dashboard is the partners' one-page view. Toggle MTD, QTD, YTD or trailing 12 months, and filter by client.
| Tile | Sample value | Formula | Source |
|---|---|---|---|
| Cash balance | $2.71M (+$295K this week) | Bank balances | QuickBooks |
| Owed to us | $1.15M, $290K over 60 days | Open invoice balances | QuickBooks |
| Billing position | $210K underbilled | Sum of billed minus earned | QuickBooks, Procore |
| Not in Procore yet | $14K, 24 charges | Card spend not yet on a Procore cost code | Ramp, the app |
| Backlog | $5.88M | Revised contract minus earned revenue, active jobs | Procore, QuickBooks |
| Revenue YTD | $21.5M | Earned revenue this year | QuickBooks |
| Gross margin YTD | 15.3% (target 15%+) | (Revenue − job cost) ÷ revenue | QuickBooks |
| Change orders pending | $154K | Waiting on the owner to sign | Procore |
Below the tiles: "Are we making money each month?" (revenue vs job cost and overhead, with cash as a line), alerts, revenue by client, and Project ranking & grades.
Each tile carries a green, amber or red tolerance set by executives. Ryan asked for exactly that: tolerances he can change as he learns what his numbers should be. How we pick starting tolerances is in the construction KPI scorecard starter set.
Who sees it: executives and admins only. Why: company cash and margin by client isn't for every PM.
7. Alerts (21:15 to 21:50)
Alerts turns the numbers into a to-do list. On the sample data: 4 critical, 19 warning. Two of the critical ones:
- "25-021 is underbilled $428K (10.2% of contract). Work in place is ahead of what has been billed." The suggested next step is to bill it on the next pay app or check whether the estimate at completion is too low.
- A client with $170K more than 90 days past due.
Each alert has Acknowledge, Snooze 7d, Assign, Note and Open, and a "Details & evidence" panel showing where the number came from. Filter by type: margin, billing, cash, cost, coding, grade, data quality. The point I made on the recording: people "can open it and then see where this information is coming from and how it got there." An alert you can't trace is an alert people stop reading. More on alert design in construction alerts and notifications and early warning indicators.
Who sees it: PMs see alerts for their jobs; executives see all.
8. Reports (21:54 to 24:42)
Reports is the drill-down behind every tile. Each report exports to CSV, prints and can be emailed on a schedule.
| Report | Answers | Sample headline |
|---|---|---|
| WIP schedule | Are we billed ahead of or behind the work on each job? | $210K under billed; $7.90M earned to date; $13.8M revised contract; $5.88M backlog |
| Cash position & 13-week forecast | Will cash hold up for 13 weeks? How late are clients paying? | Starts at $2.71M; open AR $1.15M |
| Job cost | Budget vs committed vs actual by cost code; cost to complete; portfolio margin trend | |
| Profitability & portfolio | Which jobs, clients and PMs make money? | 13.2% projected margin; 3.6 months of backlog |
| Contracts, commitments & buyout | Is every budget line bought out? Anything over-committed? | |
| Vendor spend | Who we pay, how much, uncoded spend aging (the "liability hole") | $14K uncoded card spend |
| Card spend coding | Who still has charges to code, and how fast do they reach Procore? | |
| Exceptions | Data that needs a person: uncoded spend, sync errors, losses, overbilling |
Each report is covered in construction owner reports: WIP, cash, profitability and buyout.
Who sees it: PMs see reports for their assigned jobs; executives and admins see all.
9. Platform console and "view as" (24:43 to 26:46)
The platform console is for us, the BuildFlows operator, and not part of Cattlemen's day-to-day. Its tabs:
- System health: version, uptime, database, errors, integrations and configuration.
- Users & view as: everyone with access, their role, and a View as button.
- Sessions: active sessions, with revoke.
- Flags & security: feature flags rolling out new capabilities, session timeout, two-step requirements.
- Data tools: Export everything (a full copy of the client's data), reset sample data, and the Set data mode to live checklist (QuickBooks connected, Procore connected, Ramp connected, chart of accounts imported, cost codes imported, category-to-cost-code mappings set, users invited, and more). On the sample data, the connections are red and the imports are green: 11 GL accounts, 154 cost codes, 11 mappings.
"View as" lets support see exactly what a user sees. In the walkthrough we viewed as a field user: Home showed 8 card charges to code and a suggested code for the next one, and the navigation shrank to Home, My expenses and Help. It's read-only for anything that matters: QuickBooks writes, approvals, password and user changes are all blocked, it needs a reason, and it ends on its own (30 minutes by default). Every request during it is logged with both identities. Or as I said while viewing as the field user, "I can't approve since I'm viewing as him."
Deeper guide: roles and view-as access control.
10. Help center (26:47 to 27:50)
Every screen has a Help button. The help center holds walkthroughs (animated, step by step), 25 workflow guides by role (code and approve a card charge, split coding, send back, the PM approvals queue, month-end close, grade weights, subcontractor compliance, the AI assistant and MCP, and more), a glossary, FAQs and troubleshooting, a data sources page that lists every measure's source, and the access and governance rings: field → PM → executive → admin → super admin.
Why it's in the app and not a PDF: the people who need help are on a phone on a jobsite, and the answer has to be one tap from the screen they're stuck on. We keep it current with each release; the help guides are tied to the same step names as the app's walkthroughs. More on that approach in product help docs as an agent knowledge base.
11. AI brain & API (27:50 to 29:20)
Cattlemen is building an AI "brain" with a separate vendor. Ryan wants one system, so the OS connects to it three ways:
- Embed the OS in their platform with an iframe, from allow-listed origins, and users still sign in.
- A read-only agent API. Bearer keys, one per consumer, scoped (projects, financials, reports), stored hashed, revocable, every call logged.
- An MCP server over streamable HTTP, with a client config snippet, so any MCP-capable agent can ask "what's billed to date on 25-021?" and get the same number the dashboard shows.
No agent gets write tools (QuickBooks, Procore, Microsoft 365) without Ryan's written approval per tool. Any future write goes through the same approval queue as people: the agent proposes, a person approves.
Deeper guide: giving an AI vendor read-only API and MCP access to construction data. Background on the patterns: embed a construction dashboard in an AI assistant and the AI agent write governance ladder.
How the screens connect
The screens aren't separate tools. One card charge touches most of them:
- Ramp syncs a $455 light tower rental to QuickBooks. It shows on My expenses for the cardholder and adds $455 to Not in Procore yet on Approvals, Home, Projects and Company.
- The cardholder codes it; a PM approves it on Approvals. QuickBooks gets an Item details line; Procore's connector imports it as a direct cost.
- The job's Job cost tab shows the QuickBooks/Procore gap closing. The nightly reconciliation agrees.
- The share of card spend coded within 7 days feeds the Cost Coding measure in the job's Grade.
- The cost is in cost to date when the PM forecasts at Month-end, so the EAC and margin are right.
- Reports and Alerts stop flagging stale coding on that job.
- An agent asking the API about the job's cost gets the same answer.
That's the case for one app. Each step uses the output of the one before, and nobody re-keys anything.
What it takes to go live
The proof of concept runs on sample data with every QuickBooks write in dry run. Going live is a sequence with a gate at each step: access and secure setup, a preview only, a shadow week, a sandbox test, then live with written sign-off. That plan, and what Cattlemen provides at each step, is in the rollout roadmap. The QuickBooks side has its own guardrails: safe QuickBooks write automation and the three-bill test we run before any automation.
The Section 3 guides
| Guide | Covers |
|---|---|
| Bill and card coding approvals queue | Filters, bulk approve, group by person, the QuickBooks before/after panel, reassign, aging |
| Weighted project grade scorecard | Pillars, measures, bands, tolerances, adjustable weights, worked example |
| Month-end cost-to-complete and EAC review | PM forecast, executive review, lock; EAC, margin and over/under formulas |
| Owner reports: WIP, cash, profitability, buyout | Every report, what it answers and where the data comes from |
| Subcontractor compliance: COIs and lien waivers | Tracking expiring insurance and missing waivers, and the Risk pillar |
| Roles and view-as access control | The five rings, server-side filtering, safe impersonation |
| AI vendor read-only API and MCP access | Iframe embed, scoped keys, the MCP server, write gates |
Want an operating system like this?
If your team works in Procore and QuickBooks and you want one place where each person sees their slice, with the numbers tied back to the source, we build these. Email charley@buildflows.ai or tell us what you're running today.
Frequently asked questions
What is a construction operating system?
It is one sign-in web app that sits on top of a contractor's accounting, project management and card systems, such as QuickBooks Online, Procore and Ramp. It shows each person the screens and numbers their role needs, handles work that falls between the systems, like coding card spend to Procore cost codes, and keeps an audit log of every change.
What does a field user see compared with an executive?
A field user sees their own card charges to code and approve, plus a project list with only number, name, client and status. They don't see contract values, cost, margin, billing, EAC or grades. An executive sees every job and charge, the company dashboard, month-end review and lock, grade weights and the audit log.
Where do the dashboard numbers come from?
QuickBooks Online and Procore refresh nightly with a Sync now button. QuickBooks and Ramp card charges refresh every 15 minutes and on webhooks. Anything people do in the app, such as approvals, forecasts and grade weight changes, shows immediately. Each tile and report lists its formula and source.
Does the app replace Procore or QuickBooks?
No. QuickBooks stays the system of record for cost and Procore stays the project management system. The app reads from both, writes only narrow, guarded changes to QuickBooks (such as rewriting a card expense line onto a Procore cost code item), and shows where the two disagree.
Can support staff see what a user sees without logging in as them?
Yes, through a read-only view as. Only the BuildFlows super admin can start it, with a reason and a time limit. During it, QuickBooks writes, approvals, password, user and connection changes are blocked, and every request is logged with both identities.
How does an AI assistant connect to the operating system?
Three ways: embed the app in the AI platform through an iframe from allow-listed origins, call a read-only agent API with scoped bearer keys, or use an MCP server over streamable HTTP. Agents get no write tools without the owner's written approval per tool.
Is the walkthrough on real company data?
No. The proof of concept runs on sample data with the same structure as the live feeds, and every QuickBooks write runs in dry run. Switching to live data is a gated step in the rollout plan.
Next step
Need something built around how your team works?
Describe the users, the workflow, and the systems it touches. We'll tell you whether a custom application makes sense and how we'd build it.
Prefer email? charley@buildflows.ai
Keep learning
Workflow automation · November 19, 2026
The Bill and Card Coding Approvals Queue: How One Person Controls Where Job Costs Go
A screen-by-screen guide to the approvals queue in the Cattlemen OS proof of concept for Cattlemen Construction Services, on sample data. Covers who sees the queue by role, the four tiles (not in Procore yet, to code, oldest open, synced this week), the Needs action filter and Awaiting me switch, select ready to approve and bulk actions that run charge by charge, group by person, one-tap approve and where the 10-second undo lives, the What happens in QuickBooks panel showing the Category details line before and the Procore service item line after with total unchanged, self-approve rules, send back, reassign and not job cost, sync errors and retry, aging bands tied to the grade's cost coding measure, email and Teams approvals, and where Ramp for Construction fits.
Reporting & analytics · November 19, 2026
A Weighted Project Grade for Contractors: Pillars, Measures, Tolerances and a Worked Example
The project grade built into the Cattlemen OS proof of concept for Cattlemen Construction Services: five weighted pillars (schedule, financials, safety, quality, project controls) plus a risk pillar that starts off, 16 measures read from Procore, QuickBooks and the app's coding log, scoring bands with deliberate cliffs, grade tolerances (90 on track, 75 monitor, 50% minimum coverage), the four-step math, a full worked example on sample job 26-004 that grades 79.5, how missing data and project stage are handled, executive-adjustable weights with a live what-if (Financials at 40% drops 26-004 to 74.98, Needs attention), tuning advice, where the grade appears, and a CSV scorecard template.
Reporting & analytics · November 19, 2026
Month-End Cost-to-Complete Review: PM Forecast, Executive Sign-Off and a Locked WIP
The month-end close in the Cattlemen OS proof of concept for Cattlemen Construction Services, on sample data. Defines cost to date, cost to complete, estimate at completion, cost-to-cost percent complete, earned revenue, over and under billing, projected margin and margin fade, and works every formula on sample job 26-004 (EAC $1,100,075 on a $1,278,000 contract, 13.9% margin, $69,823 under billed). Walks through opening the month, the PM's cost-code forecast with prefill rules, submit, executive review with fade flags (margin down more than 1 point or EAC up more than 2%) and questions to ask, approve or send back, lock and sign off, the close pack, and admin unlock with a reason. Includes a six-job portfolio table and a CSV review worksheet.