For Finance leaders
Spend less time reconciling the report behind the decision.
Your WIP schedule, cash forecast, backlog and AR, refreshed from Procore and your accounting system instead of rebuilt from exports. Calculated the way your finance team defines it, and every total traces back to the invoices and cost records behind it.
Questions we can help structure
- What is billed and collected?
- Which projects need forecast review?
- Where do accounting and project records differ?
- Which inputs are missing from WIP?
- What assumptions drive the cash scenario?
Start here
- Sample month-end report Click any total and trace it to the records behind it.
- WIP calculator Earned revenue and over/under billing from a few job numbers.
- WIP template (Excel) A free cost-to-cost WIP workbook: earned revenue, over/under billing, GP %.
- Data quality checker Test an export against the rules we gate reports with.
Sound familiar?
- Closing the month means exporting from Procore and accounting, pasting into Excel and recalculating by hand.
- There is no shared key between a Procore project, an accounting job and a CRM deal, so every reconciliation is manual.
- WIP, over/under billing and retainage live in workbook formulas nobody can test or audit.
- Spreadsheets accept wrong inputs without complaint, and errors can offset each other so the total still looks right.
- When a number is questioned, nobody can quickly show which source records produced it.
- Cash forecasting and backlog reporting are rebuilt from scratch every month instead of refreshing on their own.
What changes
- Your WIP schedule, cash forecast, backlog and AR refresh from your systems on a schedule, not from someone's exports.
- Earned revenue, over/under billing, retainage and margin are calculated one agreed way, on every job and every page.
- Click any total and see the invoices, billings and cost records behind it.
- Bad data is held back before it reaches the report. If a refresh fails, you keep the last good numbers and a clear note saying so.
- An exceptions list names each unmatched project or job and the system to fix it in, instead of quietly leaving it out.
- Each month-end WIP is saved as reported, so March still says what March said after forecasts change.
What happens to the numbers before you see them
1
Copy
A fresh copy of Procore, accounting and CRM data on a schedule, usually nightly. Nothing in those systems is changed.
2
Clean & match
Projects, jobs and cost codes lined up using a mapping your team controls. Anything unmatched goes on the exceptions list.
3
Calculate
Percent complete, earned revenue, over/under billing, retainage and margin, using the method your finance team approves.
4
Check
The checks your team does by eye today run automatically. A failed check stops the refresh and says why.
5
Freeze month-end
Each month-end is saved as reported, so past months stay put and fade and gain can be measured.
What we build for you
WIP and job cost reporting
We bring Procore and your Sage or QuickBooks data together and calculate WIP, over/under billing, retainage and margin the way your finance team defines them. The report refreshes with the data instead of with someone's evening.
Project and job matching that refuses to guess
We link projects, jobs and deals using a mapping your controller maintains first, then exact project numbers, then a name match only when it is unambiguous. Anything that does not match lands on an exceptions list for your team to resolve at the source.
Replacing the monthly Excel report
We read every formula in your existing workbook, write down what it really calculates, and rebuild it so it refreshes on its own with checks built in. In one rebuild, that review exposed two scorecard errors that happened to cancel each other out on the sample project.
Data quality rules and validation gates
We write automated expectations for the checks your team does by eye today: missing cost codes, invoices without a job, billings that do not tie. Failed checks stop publishing and show up as a worklist rather than a surprise in the board deck.
See the proof
Frequently asked questions
Do you need write access to our accounting system?
No. Our reporting builds only read from your systems, using credentials limited to read access, and the reports change nothing in your books. Your IT team gets the technical detail in the section above.
What happens when the source data is wrong?
Automated quality rules run before anything publishes. Rows that fail are flagged with a reason and routed to an exceptions or unresolved-records list, and if a run fails the reports keep showing the last version that passed.
Will the new report match our existing WIP numbers?
We start by reading your current workbook and documenting its logic, then reconcile the new measures against it. Where the two disagree, we show you why, because sometimes the spreadsheet was the one that was wrong.
We use QuickBooks, not Sage. Does this still apply?
Yes. We have built the same approach on Procore with Sage and on Procore with QuickBooks Online and HubSpot. The calculations and checks stay the same; the connections and project matching change to fit your systems.
Do we need Microsoft Fabric already?
No. We can help you stand up a Fabric workspace sized to your reporting needs, or work within an existing Azure and Power BI footprint if that fits better.
Next step
What would you like to build?
An app, an integration, an automation, a dashboard or an AI agent. Tell us what your team does today and what you want to change. You get a straight answer on fit, then a written scope and price before any work starts.
Prefer email? charley@buildflows.ai
Also for: Operations leaders · Scheduling teams · IT and data teams