Build Flows

Monthly progress report automation for contractors

The monthly progress workbook rebuilt as a refreshing Power BI report, with every figure traced to a source system or a validated input.

The problem

Each month someone exports from Procore, accounting and the schedule, pastes into a multi-tab workbook, and types in the rest. The report is late, its logic lives in formulas nobody tests, and errors can offset each other so the total looks right while the detail is wrong.

What we build

We rebuild the report as a pipeline: source data lands nightly in a Microsoft Fabric lakehouse, is validated and modeled once, and feeds Power BI pages for portfolio, financials, schedule, safety, quality, billing and vendors. Inputs no system holds are captured through validated SharePoint lists instead of free-typed cells.

How it works

  1. 1

    Read the existing report

    We trace every tab and formula in the current workbook, list which figures come from which system, and flag logic errors before rebuilding anything.

  2. 2

    Extract and land

    Notebooks pull Procore, accounting and scheduling data into bronze as received, so a logic fix is a re-run, not a re-extract.

  3. 3

    Validate and model

    Silver cleans and checks the data and flags bad rows with a reason; gold applies the project crosswalk and cost-code mapping once for every page.

  4. 4

    Gate and publish

    Automated quality rules run before the semantic model refreshes; if a run fails, the report keeps the last good numbers and says so.

  5. 5

    Show coverage

    Source coverage and an unresolved-records worklist show what is missing and which system to fix it in.

  • Procore
  • Sage 100 Contractor
  • Outbuild
  • SharePoint
  • Microsoft Fabric
  • Power BI

The value it creates

  • Time saved

    The report refreshes itself, so month-end effort moves from assembling to reviewing; capture hours per report before and after.

  • Cost saved

    Fewer manual inputs means fewer errors to find and rework; use the cost calculator to put your own numbers on today's process.

  • Visibility

    Drill from portfolio to project to cost code on any page instead of reading a static tab.

  • Collective intelligence

    Finance, operations and the field read the same figures from one model rather than separate spreadsheets.

Proof

Frequently asked questions

Do we lose the inputs our project managers type in today?

No. Inputs that no system holds, such as update notes, wins and risks, move into SharePoint lists with validation and are tied to a project and reporting period, so they flow through the same pipeline as system data.

What happens if a source system is down on refresh night?

The quality gate fails, the semantic model does not refresh, and the report keeps showing the last version that passed with a notice that the latest run failed. A stale answer beats a wrong one.

Can we keep the layout our owners are used to?

Usually, yes. We start from the existing report's structure and agree any changes, then add drill-through and coverage pages that a static workbook cannot offer.

We don't use Sage or Outbuild. Does this still apply?

Yes. The pattern is the same for other accounting and scheduling systems; the connectors change. The Procore, QuickBooks and HubSpot build is an example of the same approach on a different stack.

Next step

Which report or workflow would you like to improve?

Tell us what your team does today, which systems are involved, and what you want to change. We'll discuss whether there is a practical fit.

Prefer email? charley@buildflows.ai