Build Flows
Production implementationReporting · Version of October 2026

Bringing construction reporting into one connected view

A reporting build connecting project records, accounting information, schedule milestones, and structured team inputs in Power BI.

  • Procore
  • Sage 100 Contractor
  • Outbuild
  • SharePoint
  • Microsoft Fabric
  • Power BI

By the numbers

source systems feeding one nightly pipeline
4
report pages across 2 Power BI reports
22
measures in the semantic models
~180
data-quality rules run nightly before publishing
~200
Screenshots are from the live reports with client names, amounts, and record details blurred.
Architecture of the construction reporting build. Procore project records, Sage 100 Contractor accounting, Outbuild schedule milestones and SharePoint structured team inputs feed a nightly Microsoft Fabric pipeline organized around agreed report definitions. A data-quality gate checks the data before publication, and refresh status and data gaps stay visible. Power BI publishes two reports: a monthly progress report and a project quality plan. Below, two Power Automate job setup flows, deployed but not yet switched on, run from a SharePoint job register: adding a row issues the next sequential job number and creates the estimating folder from a template, and setting the job to bidding converts it into a project folder named by job number. Runs are serialized so numbers cannot collide, names and path lengths are checked before anything is created, and retries never duplicate folders. Every run writes its result back to the register, which also feeds the job list in reporting.
Four sources pass a nightly pipeline and data-quality gate into two Power BI reports, alongside two job setup flows.

The process we set out to improve

The recurring report required information from several systems and inputs supplied by the team. The build organized those sources around agreed report definitions and a repeatable refresh process.

What the walkthrough shows

The reporting pages, how source information reaches them, and how refresh status and data gaps are made visible. The technical breakdown explains the model and checks in more detail.

Job setup flows

Alongside the reporting, we built two Power Automate flows for job setup. Adding a row to a SharePoint job register issues the next sequential job number and creates the estimating folder from a template; setting the job to bidding converts it into a project folder by job number. Runs are serialized so numbers cannot collide, names and path lengths are checked before anything is created, retries do not duplicate folders, and every run writes its result back to the register, which also feeds the job list in reporting. Both flows are deployed but not yet switched on: they are waiting for the contents of the folder templates and a service account to own the SharePoint connection.

Scope

Two Power BI reports (a monthly progress report and a project quality plan), with a nightly pipeline and a data-quality gate before publication.

Watch the walkthrough

Video unavailable? Watch on YouTube or read the written breakdown.

Chapters and transcript

How the information reaches the report

The general architecture behind our reporting builds. Each implementation uses the sources and checks agreed in its scope.

Source to report: data from Procore, accounting, scheduling and SharePoint lists is landed raw, cleaned and validated, modeled, checked by a data-quality gate and snapshotted, then published as Power BI reports with refresh status plus an exceptions worklist to fix in the source system.

Sources

  • Procore

    Projects, budgets, pay apps, quality

  • Accounting (Sage / QuickBooks)

    AR, AP, job cost

  • Scheduling (Outbuild / P6)

    Milestones

  • SharePoint lists

    Team inputs

Pipeline

  1. 1.Land raw (bronze)

    Copy source data as it arrives

  2. 2.Clean & validate (silver)

    Standardize IDs, types and dates

  3. 3.Model (gold)

    Defined measures, one version of each number

  4. 4.Data-quality gate

    Checks run before anything publishes

  5. 5.Snapshot

    Keep month-end figures as they were reported

Outputs

  • Power BI reports

    With refresh status shown on every page

  • Exceptions worklist

    Fix it in the source system

Select any page to view it full size. Screenshots are from the live reports with client names, amounts, and record details blurred.

Monthly Progress Report (13 pages)

Project Quality Plan (9 pages)

Next step

What would you like to build?

An app, an integration, an automation, a dashboard or an AI agent. Tell us what your team does today and what you want to change. You get a straight answer on fit, then a written scope and price before any work starts.

Prefer email? charley@buildflows.ai