Automated WIP schedule from Procore and accounting
A WIP schedule that builds itself from Procore and your accounting system every night, with month-end figures frozen as reported.
The problem
The WIP schedule is the report your bank, bonding agent and owners care most about, and it is usually rebuilt in Excel every month from exports. Percent complete, earned revenue and over/under billing get recalculated by hand, formulas drift, and nobody can trace a number back to the job that produced it.
What we build
We pull contracts, change orders, budgets, forecasts, cost to date and billings from Procore and your accounting system, apply standard cost-to-cost WIP math in one governed model, and publish a WIP page in Power BI. Each month-end is saved as a snapshot, so reported figures stay as reported while the live view keeps moving.
How it works
- 1
Agree the WIP definitions
We confirm revised contract, estimated cost at completion, percent complete, earned revenue and over/under billing against the WIP you already file, so the new one ties to it.
- 2
Connect the sources
Read-only API connections to Procore and your accounting system (QuickBooks Online or Sage, for example) land raw data in a Fabric lakehouse every night.
- 3
Link jobs across systems
A project crosswalk links each Procore project to its accounting job; anything unmatched stays in the totals, flagged on an exceptions page.
- 4
Gate, publish and snapshot
Data-quality checks run before refresh; a failed check keeps the last good numbers. The WIP table stores one snapshot per month.
- Procore
- QuickBooks Online
- Sage 100 Contractor
- Microsoft Fabric
- Power BI
The value it creates
Time saved
Month-end WIP is a review of numbers already computed rather than a rebuild; measure controller hours spent on WIP before and after.
Early warning
Fade/gain by month and a project risk label surface margin slippage before the quarter closes.
Better decisions
Over/under billing by project is current enough to act on in the next pay application.
Standardization
Every project uses the same WIP formulas, documented in the model instead of hidden in cell references.
Proof
Related use cases
- Built and shown
A construction data lakehouse in Microsoft Fabric
One governed home for construction data: raw sources landed, cleaned, mapped, checked, and published to Power BI and a SQL endpoint.
- Built and shown
Executive portfolio dashboard for contractors
A portfolio page and a one-page executive KPI view, with drill-through from any project to its detail.
- Built and shown
Job cost reconciliation between Procore and accounting
A nightly cross-check of Procore cost against accounting job cost, with every difference listed and traced to the system to fix.
- Built and shown
Monthly progress report automation for contractors
The monthly progress workbook rebuilt as a refreshing Power BI report, with every figure traced to a source system or a validated input.
- Built and shown
Structured manual inputs in SharePoint for data no system tracks
Wins, risks, safety, and QC registers move from loose spreadsheets into SharePoint lists with defined fields that flow through the same quality checks.
- Built and shown
Weighted project health scorecard for construction
A 0 to 1 project health index from weighted categories, with the arithmetic and data coverage shown so nobody has to take the score on faith.
Frequently asked questions
Which percent-complete method does the WIP use?
By default, cost-to-cost: cost to date divided by estimated cost at completion, capped at 100%. If your company uses a different method on some contracts, we agree that during discovery and document it in the model.
Will last month's WIP change when Procore data changes?
No. The model keeps one snapshot per month, so month-end figures stay as reported. The live view reflects current data, and the two can be compared side by side.
What if our Procore forecasts are not maintained?
A blank forecast shows as blank with a 'no forecast' label rather than zero, so the report tells you which jobs need a forecast update instead of quietly producing a wrong margin.
Can we start before connecting our accounting system?
Yes. Contract, cost and forecast figures can come from Procore alone, and accounting is added for billing, AR and the cost cross-check. The free WIP template is a useful way to agree columns first.