Build Flows

Monthly report replacement

Replace the report your team rebuilds every month.

We turn a recurring construction reporting process into connected Power BI pages, supported by agreed calculations, source mappings, and a visible exceptions process.

From a production reporting implementation. Client details redacted.

Start with the report people already rely on.

We review what each page is used for, which inputs come from a system, which require a person, and which calculations need clarification. That review becomes the scope for the build.

What the implementation covers

  • A map of the agreed report fields, measures, and data sources.
  • Connections to the systems included in the proposal.
  • Project, job, and cost code mappings with an exceptions worklist.
  • A reporting model and the agreed Power BI pages.
  • Checks and reconciliation against the reference records your team approves.
  • A structured process for inputs that still require human judgment.
  • Documentation, training, and an operating handover.

What we need from your team

A recent report, a named business owner, approved access to the agreed sources, and time to resolve definitions and review results. Access and source data gaps can affect the schedule.

How we agree the price

The price follows the scope. We define the sources, report pages, measures, history, refresh needs, and acceptance criteria before implementation. Software licenses, hosting, historical repair, and ongoing support are listed separately where applicable.

How we put it into use

We compare the new report with a known reporting period, explain differences, and agree when it is ready for your team to rely on. If a parallel reporting cycle is needed, it is included in the delivery plan.

How the information reaches the report

Source to report: data from Procore, accounting, scheduling and SharePoint lists is landed raw, cleaned and validated, modeled, checked by a data-quality gate and snapshotted, then published as Power BI reports with refresh status plus an exceptions worklist to fix in the source system.

Sources

  • Procore

    Projects, budgets, pay apps, quality

  • Accounting (Sage / QuickBooks)

    AR, AP, job cost

  • Scheduling (Outbuild / P6)

    Milestones

  • SharePoint lists

    Team inputs

Pipeline

  1. 1.Land raw (bronze)

    Copy source data as it arrives

  2. 2.Clean & validate (silver)

    Standardize IDs, types and dates

  3. 3.Model (gold)

    Defined measures, one version of each number

  4. 4.Data-quality gate

    Checks run before anything publishes

  5. 5.Snapshot

    Keep month-end figures as they were reported

Outputs

  • Power BI reports

    With refresh status shown on every page

  • Exceptions worklist

    Fix it in the source system

Frequently asked questions

Will this eliminate all manual input?

Some information is a judgment or observation that no source system contains. We make that input structured and visible instead of assuming it can be automated.

Can you reproduce our existing layout?

We use it as the starting point, then agree any changes that would improve how people read and use the report.

What happens when a refresh fails?

The implementation includes an agreed failure and notification process. If the last validated version stays available, its age and failed refresh state must remain visible.

Next step

Talk through monthly report replacement for your team

Tell us the process, the systems involved and what you want to change. You get a straight answer on fit, then a written scope and price before any work starts.

Prefer email? charley@buildflows.ai

Other ways to start