Schedule, equipment and cost data for heavy civil contractors

Heavy civil jobs run for years, carry detailed CPM schedules and burn cost through crews and equipment more than through subcontracts. We connect Primavera P6, HCSS, accounting and project management into one model so schedule status, quantities, equipment and cost come from the same refresh. Then we automate the recurring updates public owners require.

The challenges we hear

  • Schedule updates live in P6, cost lives everywhere else

    Monthly CPM updates, float and critical path sit in Primavera P6 while cost, quantities and billing sit in the estimating, field and accounting systems. Executives get schedule and cost as two separate stories about the same job.

  • Unit-price progress is reconciled by hand

    Bid items, installed quantities and pay estimates are tracked against the owner's schedule of values in spreadsheets. Matching field quantities to bid items and to cost codes each month is slow and easy to get wrong.

  • Equipment cost and utilization are hard to see by job

    Equipment hours, rates and location come from HCSS or telematics, while the cost lands in accounting. Without a link between them it is hard to tell which jobs are carrying idle iron or under-recovering equipment cost.

  • Public owners want recurring reports in their format

    DOTs, agencies and program managers ask for schedule narratives, progress updates and pay estimate backup on a fixed cadence. Those packages are assembled by project controls staff from several systems every period.

  • Long jobs make forecasts drift

    On a multi-year job, cost-to-complete, margin fade and cash position change slowly and then all at once. When forecasts are kept in per-job workbooks, the drift shows up at a quarterly review instead of when it starts.

  • Daily field data stops at the field system

    Crew hours, production and daily logs captured in HCSS or a field app rarely reach the same report as the schedule and job cost. Production rates against the estimate are calculated late, if at all.

What we build for you

Reporting and analytics
  • Schedule and cost reporting on Fabric and Power BI

    A lakehouse that lands schedule, quantity, equipment and cost data on a schedule, with Power BI pages from portfolio down to activity and cost code, and a data-quality gate before anything is published.

Workflow automation
  • Owner reporting and field reminders

    Recurring owner update packages, daily log reminders and RFI and submittal aging alerts built in Power Automate, n8n or Zapier, alongside the custom HCSS node we are building out for n8n.

Integrations
  • P6, HCSS, ERP and project management connected

    Integrations that pull P6 schedules (live or from XER files), HCSS field and equipment data, and accounting cost, linked through a crosswalk of jobs, bid items and cost codes. Unmatched records are flagged, not dropped.

AI agents and MCP tools
  • Governed AI over CPM schedules

    Agents and MCP tools that can read a P6 schedule or an offline XER file and answer questions about float, logic and the critical path, read-only by default with every tool call logged.

Forecasting and insights
  • WIP, cash and backlog forecasts for long jobs

    WIP schedules, cost-to-complete, backlog burn and cash projections calculated the same way on every job, with the assumptions stated next to each forecast so drift is visible period to period.

Use cases

Systems we connect

  • Primavera P6
  • XER files
  • HCSS HeavyJob
  • HCSS HeavyBid
  • HCSS Telematics
  • Procore
  • Viewpoint Vista
  • Sage 300 CRE
  • Microsoft Fabric
  • Power BI
  • SharePoint

Proof

Frequently asked questions

Can you get data out of Primavera P6 without giving you live database access?

Yes. XER exports can be parsed offline for read-only schedule analysis and reporting, which is often the safer place to start. Where a live connection makes sense, we scope it with your IT team and keep access read-only unless a write is explicitly agreed.

Do you work with HCSS HeavyJob and HeavyBid?

Our custom n8n nodes include an HCSS node, still being built out, shown in our n8n walkthrough alongside Procore, Autodesk and Power BI. For a client build we confirm which HCSS products and API access you have during discovery, then map jobs, cost codes and bid items to your accounting and schedule data.

How do you tie schedule progress to cost on a unit-price job?

We build a crosswalk between P6 activities, bid items and cost codes as maintained master data. Quantities, cost and schedule status then roll up through the same keys, and anything that does not map is listed for review instead of being reported as zero.

Can you produce the reports our public owners require?

We can automate the data behind recurring owner packages, such as progress, schedule status and pay estimate backup, and generate them in the layout you submit today. Narrative and sign-off stay with your project controls team.

How long does a project take and what does it cost?

It depends on the number of sources and reports. We run a short discovery first, then work to a fixed scope and price, agreed after discovery.