Backlog and burn forecast for construction

Backlog value and backlog months by project and month, with weighted pipeline shown beside it but never counted as backlog.

The problem

Owners ask how much work is in hand and how long it will last, and the answer usually comes from a spreadsheet that mixes signed contracts with deals still in sales. Without a consistent burn rate, nobody can say when the team will run out of work or when to push for new wins.

What we build

We compute backlog from signed work in Procore (revised contract minus earned revenue), derive a burn rate from recent earned revenue, and express backlog in months. If your CRM is connected, weighted pipeline sits beside backlog by month, labeled as pipeline and never added to it.

How it works

Backlog and burn forecast as two equations and a separate pipeline lane. From signed work in Procore: revised contract minus earned revenue equals backlog per project, using the same earned revenue as the WIP schedule so the two tie. Backlog divided by the burn rate, the average earned revenue over the last three months (a documented setting), equals backlog in months. Separately, HubSpot deals feed weighted pipeline, amount times probability, which is shown beside backlog by month as total forward work but never added to backlog. Power BI shows backlog by month and by project so you can see whether new wins are replacing the work being burned.
Backlog comes only from signed work and is expressed in months; pipeline sits beside it, never inside it.
  1. 1

    Define backlog

    Backlog is revised contract minus earned revenue, per project, using the same earned revenue as the WIP schedule so the two always tie.

  2. 2

    Set the burn rate

    Backlog months equals backlog divided by average earned revenue over the last three months; the window is a documented setting.

  3. 3

    Add pipeline separately

    HubSpot deals feed pipeline and weighted pipeline (amount times probability), shown next to backlog as total forward work.

  4. 4

    Watch it by month

    Backlog by month and by project shows whether new wins are replacing the work being burned.

  • Procore
  • HubSpot
  • QuickBooks Online
  • Microsoft Fabric
  • Power BI

The value it creates

  • Forecasting

    Backlog months gives a stated, repeatable view of how long current work lasts at the recent pace.

  • Early warning

    A falling backlog-months line flags a coming gap while there is still time to win work.

  • One shared view

    Sales, operations and finance read one forward-work view instead of separate pipeline and job lists.

Proof

Frequently asked questions

Why not include likely wins in backlog?

Backlog should be signed work. Adding deals inflates it with work that may never arrive, so we show weighted pipeline beside backlog as 'total forward work' and keep the two figures distinct.

How is the burn rate calculated?

In the built version, average earned revenue over the last three months. A longer window smooths seasonal swings; we agree the window with you and document it.

Do we need HubSpot for this?

No. Backlog and burn come from Procore alone. The pipeline layer switches on when a CRM is connected, and other CRMs can follow the same pattern.

Next step

What would you like to build?

An app, an integration, an automation, a dashboard or an AI agent. Tell us what your team does today and what you want to change. You get a straight answer on fit, then a written scope and price before any work starts.

Prefer email? charley@buildflows.ai