Heavy civil on P6 and HCSS

P6, HCSS and job cost in one monthly picture

Schedule status from P6, crew hours and quantities from HCSS, and cost from Vista or CMiC in one model, so the monthly review tells one story about each job.

30 minutes with Charley Forey, the founder. No preparation or credentials needed.

  • Primavera P6
  • HCSS HeavyJob
  • HCSS HeavyBid
  • Viewpoint Vista
  • CMiC
  • Power BI

Sound familiar?

  • Monthly CPM updates sit in P6 while cost, quantities and billing sit in the field and accounting systems.
  • Installed quantities are matched to bid items and cost codes in spreadsheets every pay period.
  • Equipment hours come from HCSS and the cost lands in accounting, so idle iron is hard to see by job.

What we'd build first

  1. 1

    P6 schedule data next to cost

    Milestones and activities from P6, live or from XER files, land in the same model as job cost and project records, mapped to the right job.

    Schedule data in reporting
  2. 2

    HCSS to the ERP, on the same keys

    Jobs and cost codes from Vista to HeavyJob, approved time cards and quantities back to job cost, and HeavyBid estimates seeding the original budget at award.

    HCSS and Vista: what syncs
  3. 3

    One crosswalk of activities, bid items and cost codes

    Maintained master data so quantities, cost and schedule status roll up through the same keys, and anything that does not map is listed for review instead of reported as zero.

    Cost-code crosswalk
Charley Forey

Who you'd work with

At Viewpoint, Nearmap, and Trimble, Charley connected ERPs (Viewpoint Vista and Spectrum most of all), schedules, cost systems, and field tools for contractors and owners across the country. As an Integrations Engineer on Trimble App Xchange, he built connectors and MCP servers for Vista, ProjectSight, Accubid, PowerFab, and Trimble Connect, then joined Trimble's Agentic Platform Solutions team as an AI Engineer. The information was almost always there. What teams lacked was a reliable path from that data to a report or action they could trust.

Free tools to try first

Want the long version? Heavy civil and infrastructure overview

Next step

What happens on the call

Thirty minutes, no preparation required. We cover the report or re-keying that hurts most and which systems hold the data. You leave with a plain recommendation: an assessment, a bounded build, a referral, or no engagement. Any build starts with a written fixed scope and price, agreed before work begins.