Build Flows

Free tool · Finance

Procore job cost leak check

Why does my spend show $0 in Procore? For contractors running Ramp (or another card or bill pay tool) into QuickBooks Online and Procore: answer eight questions about one transaction to see where the dollar stops, build the exact service item name, and estimate how much spend Procore can't see each month.

No sign-up. Nothing connects to your systems.

1. Find where the dollar stops

Open one transaction that shows $0 in Procore and answer from what you see in QuickBooks Online and the Procore budget. Leave anything you can't check as Not sure.

What kind of transaction is the missing cost?

Open it in QuickBooks Online. The header of the form says Bill, Expense or Check.

Which section holds the line with the amount?

QuickBooks shows two tables on the form: Category details (a GL account) and Item details (a product or service).

Is the item a Procore service item named like 2401-03-300.M?

Project number, a dash, the cost code, a dot, the cost type. A generic item like "Materials" doesn't count.

Is Customer/Project set to the job on that line?

The QuickBooks customer or project that is linked to the Procore project.

Does the Procore budget have that cost code with that cost type?

In the project's Budget tool, look for the budget code, e.g. 03-300.M. Same code, different cost type is a different budget code.

Do your cost codes have two or more tiers?

Like 03-300 (division, then code). A single flat tier like 03300 won't map cleanly.

Is the transaction dated in a closed QuickBooks period?

Check the closing date under Account and settings > Advanced > Accounting.

Has Procore pulled job costs from QuickBooks since the line was right?

Changes in QuickBooks only show in Procore after the next job cost import.

Keep checking

No confirmed leak yet. Start with the line type.

8 answers are still Not sure.

  1. Check

    Start with the line type

    Most $0 costs we see from Ramp are Category details lines. That one answer usually explains it.

    Fix: Open the transaction in QuickBooks Online and see whether the amount sits under Category details or Item details.

2. Build the service item name

Procore creates one QuickBooks service item per synced budget code, named [project number]-[cost code].[cost type]. Put in your numbers to get the name to look for in QuickBooks Products and Services.

Cost type letters shown are a typical format. Confirm the codes and the item format in your Procore ERP integration settings and cost type list.

Service item name

2401-03-300.M

Project 2401 · cost code 03-300 · cost type M (Materials). On the Procore budget this is budget code 03-300.M.

$
BeforeCategory details
Category
5010 Job Materials
Description
Sample Supply Co. · rebar and ties
Amount
$1,284
Customer/Project
2401 Sample Medical Office TI
In Procore
$0 (no cost code on the line)
AfterItem details
Product/Service
2401-03-300.M
Description
Sample Supply Co. · rebar and ties
Amount
$1,284
Customer/Project
2401 Sample Medical Office TI
In Procore
Full amount on 03-300.M

Sample data. Only the line moves. Vendor, date, bill number, AP account and total stay the same, so the bill payment stays linked.

3. Estimate how much Procore can't see

Put in your monthly job spend through bill pay and cards, and roughly what share lands in QuickBooks on Category details lines. Prefilled numbers are examples.

$
%
$
%

Invisible per month

$94,500

Invisible per year

$1,134,000

Share of this spend

65%

Bills: $72,000 a month. Cards: $22,500 a month. These dollars are in QuickBooks, but Procore's job cost and budget views show them as $0, so cost-to-complete and margin look better than they are until someone re-codes them.

Next step

Re-code three bills by hand, then decide

Move three Category lines to the right service item, let Procore import, and check the budget. If the dollars land, the fix is proven and the rest is volume. We build the automation that reads Ramp's coding, finds the service item, re-codes high-confidence lines and queues the rest for review.

Invisible per month = bill spend × share on Category lines + card spend × share on Category lines. Per year = monthly × 12. A planning estimate from your inputs, calculated in your browser. Nothing is sent anywhere.

How the dollar flows

  • The cost isn't missing

    It's in QuickBooks, coded to the right job. It's in the wrong pipe: a Category details line, which Procore doesn't read as job cost.

  • Procore reads items

    Procore builds job cost from Item details lines that use the service item it created for each budget code, like 2401-03-300.M.

  • Only the line moves

    The fix changes the line type and item. Amount, vendor, date, bill number and AP account stay the same, so payments stay linked.

  • Prove it on three bills

    Re-code three lines by hand, let Procore import, and check the budget before anyone automates anything.

Related guides

References

Frequently asked questions

Why does a cost show in QuickBooks but $0 in Procore?

Usually because the amount sits on a Category details line. That line has a GL account and a customer or project, but no cost code. Procore's QuickBooks Online integration builds job cost from Item details lines that use the project-specific service item Procore created for the budget code, so a Category line doesn't land on the budget.

What does a Procore service item name look like in QuickBooks?

The format is project number, a dash, the cost code, a dot, then the cost type, for example 2401-03-300.M for project 2401, cost code 03-300, Materials. Procore creates one for each budget code it syncs. Cost type letters vary by company, so confirm yours in Procore's cost type list and ERP integration settings.

Does Ramp sync bills to QuickBooks with Category or Item lines?

In the Ramp, QuickBooks Online and Procore setups we've worked on, Ramp bills and card expenses landed as Category details lines. Ramp updates its integration, so check your Bill Pay accounting settings for whether lines can sync to Products and Services instead.

Can I fix bills in a closed QuickBooks period?

Not without your accountant. Editing a closed period changes reports you've already issued. Ask whether to edit the bill or post a correction in the open period. A safe automation sends closed-period bills to a review queue and never writes them.

Why do my cost codes need two tiers?

Procore's QuickBooks Online integration expects cost codes with at least two tiers, like 03-300. A flat single-tier list doesn't map to service items cleanly, so it's worth fixing before re-coding any bills.

Is my data sent anywhere?

No. Everything runs in your browser. Nothing connects to Ramp, QuickBooks or Procore.

Next step

Want the $0 lines fixed for good?

Send the verdict and your monthly numbers. We'll look at how Ramp, QuickBooks and Procore are set up and tell you whether a re-coding automation is worth building.

Prefer email? charley@buildflows.ai