Integration guide
Ramp and Procore integration
Neither Ramp nor Procore documents a direct integration that puts Ramp spend into Procore job cost. The working route goes through QuickBooks Online: Ramp syncs to QuickBooks, and Procore's QuickBooks Online connector imports only lines coded to its project service items. So the job is making Ramp spend arrive, or end up, as item lines on those service items.
System facts last verified October 2026 against the vendors' documentation (sources below). Confirm details with Ramp and Procore Technologies before you build.
Ramp and Procore side by side
- API style
- RampREST/JSON (Developer API v1) with an OpenAPI specification: api.ramp.com for production and demo-api.ramp.com for the sandbox.
- ProcoreREST/JSON. Procore states that direct database access and RDBMS, XML or SOAP integrations aren't supported.
- Authentication
- RampOAuth 2.0 apps created in the Ramp Developer Console: client credentials for internal server-to-server integrations (access tokens last 10 days), or authorization code with refresh tokens for third-party apps (access tokens last an hour by default). Scopes follow resource:permission, such as transactions:read.
- ProcoreOAuth 2.0, registered as an app in the Procore Developer Portal: authorization code (acts as a specific user) or client credentials through a Developer Managed Service Account (DMSA) with company and project permissions. Traditional service accounts were sunset on March 18, 2025.
- Webhooks / events
- RampYes. Subscriptions created through the API for events such as transactions.cleared, bills.paid and reimbursements.ready_to_sync, activated by a challenge handshake and signed with an HMAC-SHA256 X-Ramp-Signature header. 429s, 5xx errors and timeouts are retried up to 10 attempts in total, and requests time out after 10 seconds.
- ProcoreYes. Company- or project-level create, update and delete triggers; Procore recommends payload v4.0 for new integrations. Delivery is best-effort with retries, and events are discarded after 12 hours of continuous failure, so pair webhooks with a periodic reconciliation sync.
- Rate limits
- Ramp200 requests per 10 seconds per source IP address, shared by integrations behind the same outbound IP, plus 100 token requests per 10 seconds. Exceeding it returns 429 and can block requests for 60 seconds; honor Retry-After when present. Increases are requested through support.
- ProcoreAn hourly (60-minute) limit and a 10-second spike limit, reported in X-Rate-Limit-Limit, -Remaining and -Reset headers; exceeding either returns 429, and 503 with Retry-After signals platform load. Procore publishes no fixed default: its rate-limiting page uses sample headers (600 per hour, 25 per spike window), warns not to assume a fixed window such as 3,600/hour, says values can change, and lets apps request an increase. Every request counts, including failed ones.
- Sandbox
- RampYes. A separate sandbox (demo) environment with its own apps; tokens only work in the environment that issued them. Access is requested through Ramp's developer docs, and eligibility isn't published.
- ProcoreYes. A developer sandbox with seed data is created when you register an app (you can have many). Customers can also enable on-demand and monthly sandboxes; the monthly one is refreshed from production each month. Not available to Federal Zone customers.
- Exports and files
- RampNo bulk export API confirmed; page through list endpoints. Ramp's native accounting integrations, including QuickBooks Online, push coded spend to the ledger.
- ProcoreNo bulk export API confirmed; reporting integrations page through list endpoints. Procore Analytics is a separate product.
- Marketplace / partners
- RampRamp technology partner program: approved integrations are listed on Ramp's Integrations page, and partner apps need approval before production access.
- ProcoreProcore App Marketplace and the Procore Technology Partner Program (application, technical review, certification, agreement, listing).
Who owns what
- Rarely connected directly: spend usually reaches project management through accounting, so the job and cost code coding has to survive that hop.
- Project and cost code lists flow from project management or accounting into the spend platform's coding fields.
What syncs between Ramp and Procore
The typical shape for this pair. Every row is typical: confirm it against your configuration in discovery.
| Object | Direction | System of record | |
|---|---|---|---|
| Projects / jobs | Procore to Ramp | QuickBooks Online Projects (via QuickBooks) | On sync |
| Typical frequency: On sync. Notes: Procore imports QuickBooks Projects and Ramp syncs them into its Customer/Job field, so both systems share the job list through QuickBooks rather than directly.(Typical: confirm against your configuration.) | |||
| Cost codes and cost types | Procore to Ramp | Procore (budgeted WBS codes) | On change |
| Typical frequency: On change. Notes: No documented direct feed into Ramp. Procore pushes budgeted codes to QuickBooks as service items; any coding list in Ramp has to match those items exactly, or a translation table has to map them.(Typical: confirm against your configuration.) | |||
| Card spend → direct costs | Ramp to Procore | Ramp until synced; QuickBooks after | Daily (Procore's import) |
| Typical frequency: Daily (Procore's import). Notes: Ramp syncs card spend to QuickBooks as category lines, which Procore ignores. The fix is rewriting each line in place to the project's service item before Procore's daily import. Update, never delete and recreate, because Procore can't see deletions.(Typical: confirm against your configuration.) | |||
| Bills → direct costs | Ramp to Procore | Ramp Bill Pay until synced; QuickBooks after | Daily (Procore's import) |
| Typical frequency: Daily (Procore's import). Notes: Bill Pay can carry item lines when items sync to Ramp. Whether Procore's service items are selectable there isn't documented, so test it; otherwise rewrite the lines in QuickBooks like card spend.(Typical: confirm against your configuration.) | |||
| Reimbursements → direct costs | Ramp to Procore | Ramp until synced; QuickBooks after | Daily (Procore's import) |
| Typical frequency: Daily (Procore's import). Notes: Reimbursements reach QuickBooks as bills and follow the same rule: only service-item lines reach Procore.(Typical: confirm against your configuration.) | |||
| Coding review | not synced | Project manager, then accounting | As spend is approved |
| Typical frequency: As spend is approved. Notes: Who confirms the job and cost code is a process question, not a sync. A small coding app can route each charge to the project's PM, then write the approved coding to QuickBooks.(Typical: confirm against your configuration.) | |||
| Subcontractor invoices | not synced | Procore | Not through Ramp |
| Typical frequency: Not through Ramp. Notes: Subcontractor invoices go Procore → QuickBooks through Procore's connector. Entering the same invoice in Ramp Bill Pay as well risks counting it twice in Procore.(Typical: confirm against your configuration.) | |||
Directions, owners and frequencies are the typical pattern from our integration guides and mapping workbook. Confirm each one against your configuration in discovery.
Is a native connector enough?
We haven't confirmed a native Ramp–Procore integration. The routes we see: code bills as item lines on Procore's service items in Ramp where your setup allows it; translate Ramp's category lines into item lines in QuickBooks before Procore's daily import; or add a coding app that gets the PM's approval and writes the coding. Some card programs and third-party Procore–QuickBooks connectors handle this differently, so compare them before building.
Compare native connectors with a custom buildCommon gotchas
- Ramp lists QuickBooks Online among its accounting integrations, and Procore lists QuickBooks Online among its ERP integrations, but neither documents a Ramp–Procore job-cost path. Plan on QuickBooks in the middle.
- Rewriting a QuickBooks bill or expense needs its current SyncToken and fails on stale data, and writes dated in a closed period are rejected. Read, then write immediately, and never change amounts, only line detail.
- Procore imports job costs once a day and doesn't detect deleted transactions. Recode before the import, and void rather than delete anything already synced.
- Card transaction fields lock in Ramp after sync, and Ramp edits re-sync bills. Decide which system holds the final coding so a later Ramp edit doesn't undo a QuickBooks rewrite.
- Ramp for Construction codes job and cost code at the card, but how that lands in QuickBooks isn't documented. Check the line shape before assuming the gap is closed.
Sources
- Ramp Developer API: getting started
- Ramp Developer API: authorization
- Ramp Developer API: rate limiting
- Ramp Developer API: webhooks
- Ramp: partner integrations
- Ramp support: QuickBooks Online overview
- Ramp support: QuickBooks Online custom fields
- Ramp support: invoice line items, expense vs item
- Procore developer documentation
- Procore: choosing an OAuth grant type
- Procore: rate limiting
- Procore: webhooks
- Procore: development environments
- Procore: financial tools tutorial
- Procore: partner program overview
Frequently asked questions
Does Ramp integrate with Procore?
Not directly, as far as either vendor documents. Ramp syncs to QuickBooks Online, and Procore's QuickBooks Online connector imports job costs from it, but only from lines coded to Procore's project service items.
How do I get Ramp card spend into Procore job costs?
Make each line land on the project's Procore-created service item in QuickBooks before Procore's daily import: by coding item lines in Ramp where that works, or by rewriting category lines to item lines in QuickBooks, ideally after a PM approves the coding.
Does Ramp for Construction fix the Procore gap?
It adds job, cost code and cost type coding at the card, but Ramp doesn't document how those values reach QuickBooks or mention Procore. Test whether the lines arrive as service-item lines before relying on it.
Next step
Connecting Ramp and Procore?
Bring one real job and the records you want to move. We'll walk through what syncs, who owns each record, and what to check first.