Grok and Grok Bot for Contractors: Setup Guide, 60 Prompts and AI Policy

Everything a small commercial general contractor needs to roll out xAI's Grok and Grok Bot: which plan to buy, setup steps for Microsoft 365, 60 copy-ready construction prompts, 12 Grok Bot routines, a company context template, an AI use policy you can adapt, a security checklist, a training plan and an ROI tracker.

We put this together while setting up Grok for a contractor client, then stripped out everything specific to them. Fill in the [bracketed] blanks with your own company, jobs and systems.

Checked November 24, 2026. Plans, prices and limits change often. Recheck the linked official pages before you buy. Practical guidance only, not legal or tax advice.

By Charley Forey, Build Flows · Published November 24, 2026

Start here: the 90-minute quick start

If you only do one thing today, do these steps in order. Each one links to the detail further down the page.

  1. Step 1Pick the plan

    Email xAI one question before you buy (see Plans and costs). Grok Business and the X Subscription team plan overlap, and the docs don't say which one gets the SharePoint connector.

  2. Step 2Buy seats and cap spend

    Buy seats on company email addresses only. Set a monthly additional-usage limit and leave Auto Top-up off on day one.

  3. Step 3Lock down sharing

    Set conversations to Team so nobody can make a public link.

  4. Step 4Get Microsoft 365 consent

    Your M365 admin grants consent once, using delegated (not application) permissions, and limits the app to pilot users.

  5. Step 5Paste your company context

    Fill in the About [Your Company] template and paste it into Grok's custom instructions or a Project.

  6. Step 6Try five prompts on real work

    Pick prompts for your role from the library. Use real, non-restricted work and check every number against the source.

  7. Step 7Install Grok Bot with guardrails

    Add Ask-first rules for sending, paying, deleting and changing systems. Save no cards in the Vault. Build one read-only routine.

  8. Step 8Sign the policy and set a baseline

    Adapt the AI use policy, have everyone sign it, and record before-and-after times for the ROI tracker.

Three consoles, two team products

In 2026 xAI sells Grok to teams two overlapping ways, and Grok Bot runs on Cursor's account system. You will touch up to four admin screens:

  • console.x.ai, Grok Business: licenses, invites, connectors (Outlook, Teams, OneDrive, SharePoint, custom MCP), sharing policy, API keys, billing.✓ source
  • grok.com/dashboard: X Subscription team plans (Premium, Super, Ultra seats), members, billing, usage pool and caps.✓ source
  • cursor.com/dashboard/bot: Grok Bot team admin, Microsoft Teams enablement, connector and MCP policy.✓ source
  • grok.com/connectors: where each user connects their own Outlook, Teams, OneDrive or SharePoint account.✓ source

How to read this page

Every product fact was checked on the official page on November 24, 2026. A green ✓ source tag links to that page. An amber ? unconfirmed tag means the claim was inferred, conflicting, or only seen in third-party pages. Confirm it before you rely on it.

xAI changes plans, names and limits often. Treat every price and limit here as true on November 24, 2026 and recheck the links before you buy. This is practical guidance, not legal or tax advice.

Which plan to buy, and what it costs

Seat prices are simple. The usage pool behind each seat is not published, so the real control is a spending cap.

Ask xAI this before you buy

“For a 5-person company on Microsoft 365 that wants SharePoint and OneDrive connectors in Grok chat and Grok Bot, should we buy Grok Business seats on console.x.ai or X Subscription Premium team seats on grok.com/dashboard?”

Why: console.x.ai sells Grok Business licenses (typed SuperGrok and SuperGrok Heavy).✓ source The X Subscription team-plans page says a team that paid for Grok Business has it cancelled when it switches to a team plan, so the team plan looks like the newer path, but xAI has not retired Grok Business in the docs.✓ source The docs mark the OneDrive and SharePoint connectors as Business and Enterprise only, and it is unclear whether a Premium team seat gets them.? unconfirmed

Subscription prices (USD, before sales tax)

PlanMonthlyAnnualUsageSource
Grok Business seat$30 per user$300/yr in a snippet ? unconfirmedn/a✓ xAI, Dec 2025
Grok EnterpriseContact salesn/an/a✓ source
X Subscription Plus$8$80Base. No Grok Bot, not for teams.✓ source
Premium (also per team seat)$30$300 ($25/mo)4x base✓ source
Super$100$1,000 ($84/mo)15x base (3.75x Premium)✓ source
Ultra$200$2,000 ($167/mo)50x base (12.5x Premium)✓ source

Multiplier conflict: x.ai/bot says Super is 3.5x and Ultra 12x Premium. The X Subscription pricing page and Cursor's team pricing page agree on 3.75x and 12.5x, so we use those.✓ Cursor

Pool sizes: xAI publishes no absolute weekly pool sizes. Press reports say pools were tightened in early November 2026.? press report

Overage: usage past the pool becomes “Additional Usage”, billed on token cost from the team's shared prepaid balance. No per-step rate is published for Grok Bot.? unconfirmed

xAI API prices (per 1M tokens, global endpoint, prompts under 200k)

ModelInputCachedOutput
grok-4.7 (flagship)$2.00$0.50$6.00
grok-4.6$2.00$0.50$6.00
grok-4.5$2.00$0.30$6.00
grok-4.3$1.25$0.20$2.50
grok-4.20-0309$1.25$0.20$2.50
Tool or storagePrice
Web search$5 / 1k calls
X search$5 / 1k posts; $10 / 1k profiles
Code execution$5 / 1k calls
Collections search$2.50 / 1k calls
Remote MCPNo call fee, tokens only
Collections storage$0.10 / GiB / day
File storage$0.025 / GiB / day
Voice (speech-to-speech)$0.08 / min

Prompts of 200k tokens or more are billed at 2x for the whole request. The Batch API is 20% off for text models. The US regional endpoint adds 10% and only serves grok-4.7 and grok-4.6.✓ source

Worked example: a 5-person office team, per month

Assumptions: 3 Grok Business seats (owners and an office or PM seat), 1 Grok Bot Premium seat for the person who owns the operations Bot. A fifth person (a field super) uses free Grok or shares a Team Bot through Teams. Team Bot usage is charged to the person the Bot is answering, so heavy users need their own seat.✓ source Light API use for a custom daily digest or document Q&A agent: 2,100 requests (100 per workday), about 8k input tokens (half cached) and 1k output tokens each, 300 web searches, 1,000 collection searches and 1 GiB of stored documents.

LineCalculationMonthly
Grok Business seats3 × $30$90.00
Grok Bot Premium1 × $30$30.00
API input, uncached (grok-4.7)8.4M × $2.00$16.80
API input, cached8.4M × $0.50$4.20
API output2.1M × $6.00$12.60
Web search300 × $5/1k$1.50
Collections search1,000 × $2.50/1k$2.50
Collections storage1 GiB × $0.10 × 30$3.00
API subtotal$40.60
Totalabout $160.60 (about $1,927 a year)

Variations

  • grok-4.3 instead of 4.7: API subtotal about $24.43, total about $144 a month.
  • US endpoint on grok-4.7: API subtotal about $43.96, total about $164 a month.
  • Annual Premium for the Bot seat: $25 a month instead of $30.
  • Grok Business seats can sign in to Grok Bot ("Sign in with Grok"), so the separate Premium Bot seat may not be needed. Test it first; the pool per Business seat is unpublished.

Keep the bill from running away

  1. Set the cap on day one: grok.com/dashboard, Additional usage credits. Keep Auto Top-up off, set a team monthly limit (e.g., $50) and a per-member default (e.g., $15).
  2. API: prepay a fixed amount and leave the Invoiced Spending Limit at $0, so requests stop when credits run out.
  3. A task already running can overshoot a cap a little, and there is no separate Grok Bot cap on Teams plans.
  4. Routines are the biggest hidden cost. Every run uses usage, and so does every Test. Use weekday schedules, not "every 5 minutes".
  5. Recheck the Usage view weekly during the first month. Limits change and the docs publish no numbers.

Sources: ✓ spending caps ✓ Grok Bot FAQ

Setup guides, click by click

Four parts: Grok Business for the office, Grok Bot for scheduled and agent work, the xAI API if you build your own automations, and the Microsoft 365 approvals that unblock all of it.

1. Grok Business (chat for the office)

A. Create the team and billing

  1. Create a team at console.x.ai/create-team.✓ source
  2. Set up billing first under Billing Settings (console.x.ai/team/default/billing).✓ source
  3. Billing Read-Write is needed to buy or cancel licenses. Team Read-Write is needed to invite users and assign licenses. Give both to an owner, not to everyone.

B. Buy seats and invite users

  1. On the Grok Business overview page, pick a license type (SuperGrok or SuperGrok Heavy) and a quantity, then confirm. Licenses go into your pool.
  2. Click "Invite users to Grok Business", enter emails, and pick the license to assign when each person accepts.
  3. To revoke, click "..." next to the user and choose "Unassign License". Cancelling licenses "may take a few days".
  4. Users switch between personal and team workspaces with the selector at the bottom left of grok.com.✓ source

Team plan path instead: grok.com/dashboard, Members, Invite. Pick a Role (Member or Admin) and a Seat. The Seat menu defaults to your own tier, so pick lower tiers on purpose. Removing a member does not remove the seat: reduce seats under Billing and invoices.✓ source

C. Data, privacy and sharing

  • Sharing: console.x.ai, your team, Sharing & Retention, Product Sharing. Set a policy per type: Private, Team, Organization or Public (Public is conversations only).
  • Defaults are conversations and projects = Organization, skills = Private. Set conversations to Team so no public links can be made.
  • Training: xAI says business data is not used for training, “ever”.✓ source
  • Custom retention policies, SSO, SCIM, advanced audit and customer-managed keys are Enterprise features.✓ source

D. Turn on connectors (admin first, then each user)

  1. console.x.ai, your team, Grok Business, Connectors. Click “+ Add Connector” and pick the service.✓ source
  2. Microsoft services may need admin consent (see Microsoft 365 below). Configure sets access controls and allowed sites. Remove may delete indexed data.
  3. Each user goes to grok.com/connectors, clicks “New Connector” or “Connect”, signs in with their work account and accepts.✓ source
ConnectorAdmin stepsPermissionsWhat it can do
Outlook Mail and Outlook CalendarUsually none. If users see "need admin approval", grant consent in Entra.Mail.ReadWrite, Mail.Send, User.Read, offline_access; Calendars.ReadWriteSearch and read mail and attachments, draft, send, reply-all, forward; create and answer events.✓ source
Microsoft TeamsSame as Outlook.Team, channel and chat read; ChannelMessage.Send, ChatMessage.Send, Chat.CreateRead the user's channels and chats; post messages and replies.✓ source
OneDrive (Business and Enterprise)Admin adds it and enters the tenant ID; one-time M365 admin consent.Files.ReadWrite, User.Read, offline_accessBrowse the user's own OneDrive; save Grok files there.✓ source
SharePoint (Business and Enterprise)Choose Delegated permissions (recommended) or Application-level. Enter tenant ID. Approve as admin or copy the link for IT. Write access is a separate consent.Read: Sites.Read.All, Files.Read.All, User.Read, offline_accessSearch and index sites. Writes only if the admin enables it and the user opts in.✓ source

All four are delegated, so each person sees only what they can already see. Start SharePoint in delegated, read-only mode and leave Enable Write Access off for the pilot. If consent is skipped, nobody on the team can authenticate.

E. Custom MCP connector (a bridge to QuickBooks, Procore, Ramp or your own system)

  • Admin: Grok Business, Connectors, “+ Add Connector”, select “Other” and enter the MCP server URL, then authenticate.✓ source
  • User: grok.com/connectors, New Connector, Custom. Enter the URL and authenticate. Grok discovers the server's tools.
  • The server must be on the public internet (Grok rejects localhost and private IP ranges), using SSE or Streamable HTTP, with OAuth or API-key auth completed in Grok.✓ source
  • The docs don't describe custom auth-header fields for the chat connector.? unconfirmed If your server needs a static header, use Grok Bot (it has an HTTP headers field) or the API.
  • For testing, ngrok or a Cloudflare quick tunnel can expose a local server. Free tunnel URLs change on restart. For production, host the server properly over HTTPS.

2. Grok Bot (the agent teammate)

A. Eligibility and sign-up

  • Included with X Subscription Premium, Super and Ultra (individual or team seat), not Plus or Free; legacy Cursor plans; linked SuperGrok or X Premium+ subscriptions; and seats on a self-serve Grok Business plan via “Sign in with Grok”. Enterprise goes through the Cursor account team.✓ source
  • Download from x.ai/bot (macOS, Windows, Linux). Sign in and finish in the browser.
  • If asked, switch from Privacy Mode (Legacy) to Privacy Mode. Grok Bot needs cloud storage.
  • Phone: install Grok Bot from the App Store or Google Play (iOS 18+, Android 9+).✓ source

B. Create a Bot and connect apps

  1. Click New Bot (+) or press Cmd/Ctrl+N. Name it and click Create.✓ source
  2. In the first message, give it the job, the sources and the approval boundaries, and ask it to remember them. Then give it one real task with a clear finish line.
  3. Open Connect apps, add the app, and finish authorizing in the browser within about 10 minutes. “Added” means installed, not signed in.✓ source
  4. Microsoft 365 apps may show an "Approval link for your IT admin". Send it to your Global Admin, then connect again.
  5. SharePoint on a team: use Delegated permissions. Application-level mode fails with AADSTS50011.
  6. The Bot can get its own email address. You get one, and it cannot be renamed or deleted, so choose carefully.

C. Custom MCP server by URL

  1. Connect apps, “Add a custom connector”. Enter a Name, Type: Remote HTTPS, and the Server URL.✓ source
  2. Optionally add HTTP headers and an OAuth Client ID. Click Add plugin.
  3. Type: Command runs a local MCP server on the Bot's cloud computer (for example Intuit's QuickBooks server). It is then available to all your Bots.
  4. A team admin's MCP policy can block servers. Blocked apps show "Disabled by team admin".

D. Scheduled routines

  1. Get the job working in chat first, then ask the Bot to save it as a skill.✓ source
  2. Ask the Bot to create a routine in plain English ("every weekday at 7:00 AM"). Confirm the schedule, time zone, inputs, output, approval boundary, and what to do if a source is missing.
  3. Set the time zone under Settings, Bot, Timezone. Use Test to run it now (it uses usage).
  4. Limits: runs at least 5 minutes apart, up to 50 routines per Bot.
  5. Manage routines from the Bot's Details tab: pause, resume, test, edit, delete.
  6. Email-triggered routines can filter by sender or domain, not by subject.

E. Approval rules: Allow automatically or Ask first

  • Auto Review is on by default. Add rules under “When Grok Bot wants to:” and choose “Allow automatically” or “Ask first”.✓ source
  • Up to 20 of each kind, 1,000 characters each. Ask first wins when both match.
  • Approval cards: Allow once, Always allow (saves a rule), or Deny. Cards from routines expire after 30 minutes.

Starter Ask-first rules (our suggestion): send any email or Teams message outside your domain; create, edit or delete anything in QuickBooks, Ramp or Procore; make any purchase or payment; delete or overwrite any file in SharePoint or OneDrive.

F. Vault, team Bots and stopping a task

  • A card saved in the Vault fills in at checkout without asking each time. Don't save cards; leave “Securely save to Bot's vault” unchecked so the Bot asks you to approve each total.✓ source
  • All of one person's Bots share one cloud computer. xAI: “Do not use separate Bots as a security boundary.”✓ source
  • A Team Bot shares one set of apps, secrets, skills and files with everyone who can use it. With Allow Shared Logins, anyone talking to it can act as that account.
  • There is no documented Stop button. Message the Bot “Stop now” and deny open approval cards. Closing the app does not stop background work. Pausing a routine stops future runs.✓ source

3. xAI API (only if you build your own agent or automation)

Key, spend limit and retention

  • Sign up at console.x.ai, load credits, create an API key and store it in a secrets manager, never in a script.✓ source
  • Base URL https://api.x.ai/v1 (OpenAI SDK compatible). Model example: grok-4.7.
  • Prepaid credits are used first and requests are rejected when they run out. Invoiced billing is off by default; keep the Invoiced Spending Limit at $0 for a pilot.? from official snippet
  • No training on API data without permission. Requests are kept 30 days. Zero Data Retention exists, but xAI does not recommend it for most customers because it turns off Files and Collections.✓ source
  • US regional endpoint: https://us.api.x.ai/v1, grok-4.7 and 4.6 only, +10% on tokens, “not a comprehensive data-residency guarantee”.✓ source

Remote MCP and tools

"tools": [{
  "type": "mcp",
  "server_url": "https://mcp.example.com/mcp",
  "server_label": "procore_ro",
  "server_description": "Read-only RFIs and submittals",
  "authorization": "<token>",
  "allowed_tools": ["list_rfis", "get_submittal"]
}]
  • Required: server_url and server_label. Transport: Streamable HTTP or SSE. No per-call fee, tokens only.✓ source
  • require_approval is not supported, so any approval gate has to live in your own code.
  • Always set allowed_tools. Leaving it out loads every tool, which costs tokens and widens what the model can do.
  • Collections give the model a searchable document library (specs, contracts, SOPs), up to 100 MB per file.✓ source

4. Microsoft 365: who has to click what

Entra admin consent

  • Needed when users see "need admin approval" or "Your organization's Microsoft 365 admin needs to approve this app".
  • Who can grant it: Cloud Application Administrator, Application Administrator, AI Administrator, Privileged Role Administrator, or Global Admin.✓ Microsoft
  • Easiest: open the approval link Grok shows while signed in as the admin. Or: Entra admin center, Enterprise apps, find the app, Security, Permissions, Grant admin consent (the app appears after one user tries to sign in).
  • Review the scopes first: Outlook includes Mail.Send, Teams includes ChannelMessage.Send, OneDrive includes Files.ReadWrite.
  • Tenant-wide consent lets all users use the app. Turn on “assignment required” and assign only pilot users.? our recommendation

Grok Bot inside Microsoft Teams

  1. Cursor team admin: cursor.com/dashboard/bot, Shared Bots, Enable Microsoft Teams. Sign in as a Teams Administrator or Global Administrator.✓ source
  2. Publish the Bot as a Team Bot, then use "Bring to your team's Microsoft Teams" and "Connect Microsoft Teams".
  3. Microsoft does not notify the admin. Send them the link. They approve it in Teams admin center, Teams apps, Manage apps, Pending approval, Publish.✓ Microsoft
  4. "Microsoft Teams didn't accept the app" means custom apps are blocked. Fix it in org-wide app settings or upload the app package.
  5. Setup can take up to an hour. Each user then links their account once.

Who should hold what: an owner keeps Global Admin and uses it only for consent and approval clicks. Your IT or integration partner gets Grok and Cursor team admin, and Application Administrator in Entra if you agree.

  • Seats bought on company emails only, with multi-factor sign-in on.
  • Spending cap set and Auto Top-up off.
  • Conversations set to Team sharing.
  • M365 consent granted with delegated permissions, limited to pilot users.
  • Grok Bot on Privacy Mode, Ask-first rules added, no cards in the Vault.

Connecting QuickBooks, Ramp and Procore

This is where most contractors get stuck. Grok has native connectors for Microsoft 365, but none for the systems that hold your job cost data.

QuickBooks Online

No built-in connector in Grok or Grok Bot. Intuit publishes an official QuickBooks Online MCP server, but it is local-only (stdio). It can run on Grok Bot's computer as a “Command” server, not in Grok chat. Write tools can be turned off with environment variables.✓ GitHub

Ramp

No built-in connector. Ramp's open-source MCP server (read-only scopes) was archived on July 17, 2026.✓ GitHub A hosted Ramp MCP endpoint shows up only in third-party directories.? unconfirmed

Procore

No built-in connector and no official Procore MCP server as of November 2026. Options are a hosted third-party MCP (such as Zapier's) or a custom read-only bridge on Procore's REST API.✓ Procore

Our take

Grok's answers are only as good as the numbers it can read. Ten of the prompts and most of the routines on this page assume read-only connectors to accounting, card spend and project management. Without them, people paste spreadsheets into chat, which is slower and riskier.

Build Flows has built MCP connectors for QuickBooks, Ramp and Procore, and builds custom tools for contractors: read-only by default, one key per connection, an allow-list of tools, and an approval queue for any write. They work with Grok and with any other AI tool that supports MCP.

60 construction prompts for Grok

Grouped by role. Each one says when to use it, what to attach, and what a person must check before the output is used. The ten marked “needs connectors” assume read-only access to accounting, card and project data.

Showing 60 of 60 prompts

  1. 1. Owners

    Owner contract review checklist (AIA A101/A102/A201 or owner form)

    When: Before signing any prime contract, CM/owner's rep agreement or design-build agreement.

    Show the prompt
    You are reviewing a prime contract for [Company] (general contractor, [City, State]). Contract type: [AIA A101 stipulated sum / A102 cost-plus GMP / A141 design-build / owner's own form]. Project: [job number and name]. Owner: [owner entity].
    
    Read the attached contract and general conditions and produce a review table with these columns: Item | What the contract says (quote it) | Section/page | Risk to us (Low/Med/High) | Suggested redline or question.
    
    Cover at least:
    1. Contract sum / GMP, contingency and who controls it, allowances, shared savings split.
    2. Payment terms: pay app due date, owner review period, payment due date, whether it matches our state's prompt payment law (e.g., in Texas, Tex. Prop. Code ch. 28) or tries to waive it.
    3. Retainage: percentage, reduction at 50%, release trigger, and whether retainage on stored materials applies.
    4. Notice deadlines: claims, changes, concealed conditions, delays, defects. List every "within X days" requirement in a separate calendar table with the triggering event.
    5. Change order process: who can authorize, markup allowed on self-performed and sub work (OH&P %), time-and-material rates, pricing deadline.
    6. Schedule: substantial completion date, liquidated damages amount per day, any cap, no-damage-for-delay clause, weather days.
    7. Indemnity: broad form vs. comparative fault (note any state limits on broad-form indemnity, e.g., Texas Ins. Code ch. 151), defense obligations, additional insured requirements.
    8. Insurance and bonds: limits, waiver of subrogation, primary/non-contributory, builder's risk responsibility, P&P bond requirement.
    9. Warranty: length, start date, and any extended or special warranties.
    10. Termination for convenience (what we get paid), suspension, dispute resolution (mediation/arbitration, venue), consequential damages waiver (is it mutual?).
    11. Pay-when-paid / pay-if-paid language we would need to flow down to subs.
    12. Anything that differs from the standard AIA form or is unusual.
    
    End with: top 5 redlines in priority order, and a list of questions to ask the owner. If something is not addressed in the document, write "Not found" rather than assuming.

    Attach: The full contract PDF, general/supplementary conditions, exhibits (insurance, schedule of values, drawings list).

    Check before use: This is a reading aid, not legal advice: open each cited section and confirm the quote, and send the top redlines to counsel before signing.

  2. 2. Owners

    Subcontract and flow-down gap check

    When: When issuing a subcontract on a job where the prime contract has unusual terms.

    Show the prompt
    Compare the attached prime contract for [job number] with our standard subcontract template. Identify every obligation in the prime contract that must flow down to subcontractors but is missing or weaker in the subcontract.
    
    Output a table: Prime contract requirement | Prime section | Subcontract section (or "missing") | Gap | Suggested subcontract language.
    
    Focus on: notice periods (our sub notice periods must be shorter than the owner's, suggest a buffer of [3-5] days), liquidated damages pass-through, insurance limits and endorsements, warranty duration and start date, retainage terms, pay-when-paid wording, indemnity, safety requirements, closeout documents and record drawings, and any owner-specific requirements (badging, background checks, working hours).

    Attach: Prime contract PDF and our subcontract template (Word or PDF).

    Check before use: Confirm each suggested clause against the actual subcontract template before sending, and have counsel approve any new indemnity or pay-if-paid language.

  3. 3. Owners

    Notice and claims deadline calendar

    When: Right after contract execution, so every PM knows the clock on notices.

    Show the prompt
    From the attached contract documents for [job number / project name], extract every notice requirement and deadline.
    
    Return a table sorted by how fast the clock runs: Event that triggers the notice | Deadline (days, calendar or working) | Who must receive it and how (certified mail, email, Procore) | Required content | Contract section | Consequence of missing it (waiver, LDs, etc.).
    
    Then write a one-paragraph plain-English summary I can paste into the project's Teams channel for the PM and superintendent. Note any deadline shorter than 7 days in bold. If the contract says "promptly" or "reasonable" without a number, flag it and suggest we treat it as [7] days internally.

    Attach: Executed contract, general conditions, supplementary conditions.

    Check before use: Check each deadline against the contract page and note whether days are calendar or business days; that difference is where claims are lost.

  4. 4. Owners

    WIP review questions for the PM meeting

    When: Monthly before the WIP meeting with each PM.

    Show the prompt
    Here is our WIP schedule for [month/year] (attached). For each job, compute nothing new; use only the numbers in the file. For each job, generate the 3-5 sharpest questions an owner of a commercial GC should ask the PM in the WIP review.
    
    Look for: over/under billings over [$X or X% of contract], percent complete by cost vs. percent complete the PM claims in the field, estimated cost at completion that hasn't moved in 60+ days while cost to date rose, fade or gain in projected margin vs. bid margin, pending change orders included in revenue without owner approval, contingency burn, retainage receivable aging, and jobs near completion with large cost-to-complete.
    
    Format: Job number | Job name | Flag(s) found (quote the numbers from the file) | Questions for the PM. End with a list of the 3 jobs that need the most attention and why.

    Attach: WIP schedule export (Excel/CSV) with contract value, approved COs, cost to date, estimated cost to complete, billed to date.

    Check before use: Every number Grok quotes must match the source file; if it computed a figure, recompute it in Excel before discussing it with the PM.

  5. 5. Owners

    Cash flow narrative for the owners or the bank

    When: Monthly, or when the line of credit lender asks for a cash update.

    Show the prompt
    Write a cash flow narrative for [Company] covering the next [13] weeks, using only the attached cash forecast and AR aging.
    
    Structure:
    1. Opening cash position as of [date] and projected low point (week and amount from the forecast).
    2. Major inflows: pay apps expected by job and week, retainage releases.
    3. Major outflows: sub payments tied to those pay apps, payroll, card spend, G&A, debt service.
    4. Risks: slow-paying owners (name the job number and days outstanding), pay apps at risk of rejection, large unapproved change orders.
    5. Actions we are taking (I will fill in: [actions]).
    
    Tone: factual, no spin, short paragraphs, suitable for a lender. Do not invent any amount. If something I'd expect (e.g., retainage schedule) isn't in the files, list it under "Not in the data."

    Attach: 13-week cash forecast export and AR aging report.

    Check before use: Tie every dollar figure back to the forecast and have an owner approve before it goes to any lender.

  6. 6. Owners

    Owner monthly update letter

    When: Monthly project update to the owner or developer on a GC or owner's-rep job.

    Show the prompt
    Draft a monthly project update letter from [Company] to [owner contact name, title, company] for [job number, project name], period ending [date].
    
    Use these facts only: [paste PM notes: % complete, work completed this month, upcoming 30-day work, schedule status vs. baseline, change orders approved/pending with amounts, RFIs and submittals outstanding, safety stats, photos available, decisions needed from owner with dates].
    
    Sections: Summary (3 sentences), Progress this period, Look-ahead (next 30 days), Schedule (on track / X days behind and why), Budget and change orders (table), Decisions needed from the owner (with the date we need each one and the impact if late), Safety.
    
    Tone: confident, direct, no fluff; use "we." Do not promise any date or cost not in my notes. Keep it under 1 page plus the CO table.

    Attach: PM notes, CO log, schedule update, selected photos.

    Check before use: Confirm every date and dollar amount against Procore and the schedule before it goes out; owner letters become evidence.

  7. 7. Owners

    Owner's rep: design-team deliverable review

    When: On owner's rep / CM engagements when the architect issues a progress set or the GC submits a GMP.

    Show the prompt
    We are acting as owner's representative on [project]. Review the attached [GMP proposal / 50% CD set narrative / pay app] from [GC or designer] on the owner's behalf.
    
    Produce: (1) a list of assumptions, exclusions and allowances that shift risk to the owner, with the page reference; (2) items where the scope seems incomplete against the drawings list or program I provide; (3) general conditions and fee items to question (compare to [X]% fee and [X]% GCs we expected); (4) 10 questions to send the GC/designer, ordered by dollar exposure.
    
    Do not estimate quantities or costs yourself; only point out where numbers need support.

    Attach: GMP or proposal PDF, drawings list, owner's program or budget.

    Check before use: Verify each quoted exclusion on its page and keep the question list factual, since it may be forwarded to the GC.

  8. 8. Estimating

    Go / no-go bid checklist

    When: Within 24 hours of receiving an RFP or invitation to bid.

    Show the prompt
    Evaluate this opportunity for [Company] ([City, State] commercial GC; typical sweet spot: [project types and size range, e.g., $1M-$15M retail, office, industrial, hospitality in your market]).
    
    Opportunity: [project name, owner, location, delivery method, estimated value, bid date, bonding required, schedule].
    
    Score each criterion 1-5 with a one-line reason, then give a weighted total and a Go / No-go / Go with conditions recommendation:
    1. Fit with our project types and size
    2. Relationship with the owner/architect (I'll tell you: [relationship])
    3. Number of bidders and selection basis (low bid vs. best value)
    4. Contract terms risk (LDs, pay terms, retainage, indemnity)
    5. Schedule realism and our current backlog/staffing ([current PM/super availability])
    6. Location and logistics (distance from our office, labor availability)
    7. Margin potential
    8. Bonding and insurance requirements vs. our capacity
    9. Design completeness of the documents
    10. Cost to pursue (estimating hours, design-build design fees)
    
    List the 5 questions we must answer before committing estimating time, and the date by which we need the answer.

    Attach: RFP / invitation to bid, bid form, any contract form provided.

    Check before use: The scores are a discussion tool; an owner makes the call and checks the bid date and bond requirements on the actual RFP.

  9. 9. Estimating

    Bid document summary and pre-bid RFI list

    When: First read of a new bid set.

    Show the prompt
    Summarize the attached bid documents for [project]. Give me:
    1. Key dates: pre-bid meeting, site walk, RFI deadline, bid due date/time and delivery method, anticipated award, NTP, substantial completion.
    2. Bid form requirements: alternates, unit prices, allowances, bid bond, required forms, MWBE/HUB goals.
    3. Scope overview by CSI division (one line each) and which divisions look under-documented.
    4. Conflicts or missing information between drawings and specs (cite sheet and spec section).
    5. A list of pre-bid RFIs, each written as a clear question with sheet/spec references, ready to submit.
    
    If a date or requirement isn't in the documents, say "Not stated."

    Attach: Bid manual/project manual, drawing set (or sheet index), addenda.

    Check before use: Confirm the bid due date, time and delivery method on the bid form itself and log addenda by number before relying on the summary.

  10. 10. Estimating

    Trade scope sheet

    When: Before sending a bid package to subs, one per trade.

    Show the prompt
    Write a scope sheet for the [trade, e.g., Division 09 drywall, framing and acoustical ceilings] bid package on [job number, project name].
    
    Use the attached spec sections [list sections] and drawing sheets [list]. Format:
    - Project info and bid due date: [date]
    - Included scope: numbered list, specific (materials, systems, spec sections, sheets), including the things subs commonly leave out for this trade (e.g., for drywall: shaft wall, deflection track, fire caulking at head of wall, backing/blocking, patching after other trades, final clean of their work, hoisting).
    - Excluded scope (by others): numbered list.
    - Coordination items with other trades.
    - General requirements: insurance per our subcontract, safety, daily cleanup, Procore use for submittals/RFIs, bilingual foreman expectations, working hours.
    - Bid form: lump sum, required unit prices [list], alternates [list], and a line for "exclusions/qualifications" so we can level.
    
    Flag anything in the specs that is ambiguous about which trade carries it.

    Attach: Relevant spec sections, drawing sheet list, our standard scope sheet template.

    Check before use: Walk the scope sheet against the drawings for gaps between trades (backing, firestopping, demo, patching) before it goes out.

  11. 11. Estimating

    Bid leveling table

    When: When 2+ sub bids for the same trade are in.

    Show the prompt
    Level these [number] bids for [trade] on [job number]. Our scope sheet is attached.
    
    Build a table with one row per scope item from our scope sheet and one column per bidder showing: Included / Excluded / Not mentioned / Qualified (quote the qualification). Below it, show each bidder's base bid, alternates and unit prices exactly as written on their bid, and a "plug" column where I can enter values for excluded items (leave blank, do not estimate).
    
    Then list: scope gaps common to all bidders, items where one bidder is far off the others (possible bust), and questions to ask each bidder before award.
    
    Do not add up or adjust totals; copy amounts exactly as written and mark any you could not read clearly.

    Attach: Each sub bid (PDF or email), our scope sheet.

    Check before use: Re-check every amount against the bid PDFs (OCR misreads are common) and have the estimator price the plugs; the award decision stays with a person.

  12. 12. Estimating

    Value engineering options

    When: When the estimate is over the owner's budget or the owner asks for savings.

    Show the prompt
    Our estimate for [project, type, size SF] is [$X] against an owner budget of [$Y]. Here is the cost summary by division: [paste or attach].
    
    Propose 10-15 value engineering options a commercial GC in [your state] would realistically put in front of an owner. For each: Description | Division | Affects (cost / schedule / quality / maintenance / design) | What would need to change in the drawings or specs | Risk or downside the owner must accept | Who has to approve (architect, engineer, owner, AHJ).
    
    Do not put dollar savings on them; leave a "Savings (estimator to price)" column blank. Rank by likely impact using the division costs I gave you. Exclude anything that affects code compliance, life safety or structural integrity unless the engineer of record redesigns it.

    Attach: Estimate summary by division, drawings narrative or outline specs.

    Check before use: The estimator prices each option and the design team confirms feasibility before anything goes to the owner.

  13. 13. Estimating

    Qualifications, clarifications and exclusions

    When: Final step before submitting a GC bid or GMP proposal.

    Show the prompt
    Draft the Qualifications, Clarifications and Exclusions section for [Company]'s proposal on [project], bid on documents dated [date] including addenda [numbers].
    
    Inputs: our estimate assumptions [paste], sub exclusions we did not carry [paste], allowances [list with amounts], and alternates [list].
    
    Write numbered, specific items in these groups: Basis of proposal (documents, addenda), Allowances, Alternates, Clarifications, Exclusions (e.g., permits and impact fees, utility company charges, testing and inspections by owner, builder's risk, hazardous materials, rock excavation, unsuitable soils, FF&E, low voltage, after-hours work, bonds unless noted), Schedule assumptions, and Pricing validity ([30] days, material escalation clause).
    
    Keep each item one or two sentences. Do not exclude anything that the bid form requires us to include; list any conflicts you see.

    Attach: Estimate assumptions, sub bid exclusions, bid form, addenda list.

    Check before use: Compare against the bid form requirements so an exclusion doesn't make the bid non-responsive.

  14. 14. Estimating

    Estimate sanity check

    When: Before an estimate leaves the building.

    Show the prompt
    Review this estimate summary for [project type, SF, location, delivery method]. Do not re-price anything. Look for:
    - Divisions that are missing or zero that a project like this normally has (e.g., Div 01 general requirements, Div 31 earthwork, temporary utilities, dumpsters, final clean, punch, insurance, permits).
    - General conditions duration vs. the schedule duration [X months].
    - Contingency, fee, insurance and bond lines and whether they're applied to the right base.
    - Cost per SF by division that looks out of line for this building type (ask me rather than asserting a benchmark you're unsure of).
    - Allowances that need to be listed in the proposal.
    
    Return a checklist with Pass / Question / Missing for each, and the specific question to ask the estimator.

    Attach: Estimate summary by division and general conditions breakdown.

    Check before use: Any benchmark Grok cites is not verified data; rely on our own historical costs for comparisons.

  15. 15. PMs

    RFI draft

    When: Any time a field or design question needs a formal answer.

    Show the prompt
    Draft an RFI for [job number, project name] to [architect/engineer firm, contact].
    
    Issue: [describe the condition, e.g., ceiling grid on A-301 conflicts with duct run on M-201 at grid C/4].
    References: [sheets, details, spec sections].
    Our suggested solution (optional): [describe].
    Answer needed by: [date] because [activity] starts [date].
    
    Write it in Procore RFI style: Subject (under 10 words), Question (state the conflict factually with references, then ask one specific question), Suggested resolution, Impact (state "potential cost and/or schedule impact; [Company] reserves the right to request an adjustment" if applicable, without naming an amount).
    
    Keep it neutral; don't assign blame to the designer.

    Attach: Marked-up drawing snips or photos of the condition.

    Check before use: Confirm the sheet/detail numbers and the needed-by date, and that it doesn't commit us to cost or time.

  16. 16. PMs

    Change order request with pricing narrative

    When: When submitting a change order request (COR/PCO) to the owner.

    Show the prompt
    Write the narrative for a change order request on [job number] to [owner].
    
    Cause: [owner directive / RFI #__ response / concealed condition / design error / code official requirement], dated [date].
    Scope of change: [describe].
    Pricing (from our estimate, do not change): [paste breakdown: labor, material, equipment, subcontract quotes, markup % per contract, bond/insurance %].
    Schedule impact: [X calendar days / none / TBD with reason].
    
    Structure: Description of change; Contract basis (cite the contract section allowing the change and our markup per [section]); Reason it is outside the original scope (cite drawing/spec/RFI); Pricing summary table (copy my numbers exactly, then check that the arithmetic adds up and tell me if it doesn't); Schedule impact; Requested action and response date; Reservation of rights paragraph for impacts not yet known.
    
    Professional, specific, no adjectives like "significant." Under 1 page plus the table.

    Attach: Sub quotes, our estimate backup, RFI response or owner directive, relevant contract sections.

    Check before use: The pricing must come from the estimate and sub quotes, not Grok; confirm markup percentages match the contract.

  17. 17. PMs

    Delay notice letter

    When: As soon as an event may delay the work, within the contract notice window.

    Show the prompt
    Draft a written notice of delay from [Company] to [owner and architect contacts] on [job number] under [contract section that requires notice].
    
    Event: [describe, e.g., late RFI response #__, owner-supplied equipment late, unforeseen condition, abnormal weather beyond the baseline].
    Date the event started: [date]. Date we became aware: [date].
    Activities affected: [list with schedule activity IDs if known].
    Current estimated impact: [X days / to be determined].
    
    Letter must: reference the contract notice clause and state we are giving timely notice; describe the facts with dates; state the activities affected; say we will provide a time impact analysis within [X] days or per the contract; reserve rights to time and cost; request any owner decision needed with a date. Neutral and factual.

    Attach: Contract notice clause, schedule, correspondence about the event.

    Check before use: Check the contract's notice deadline and required delivery method (certified mail, specific addresses) before sending; send on time even if the impact is still TBD.

  18. 18. PMs

    Schedule delay narrative / TIA summary

    When: Supporting a time extension request.

    Show the prompt
    Write a time impact analysis narrative for [job number] supporting a request for [X] calendar days.
    
    Inputs: baseline/last accepted schedule data date [date] and substantial completion [date]; the fragnet I inserted [describe activities, durations, logic ties]; the updated forecast completion [date]; the delay event facts and dates [paste]; concurrent delays we are aware of [list or none]; weather days used vs. allowed [numbers].
    
    Structure: Executive summary; Delay event description and timeline (table of dates); Methodology (time impact analysis using the contemporaneous schedule update, fragnet inserted at the data date); Impact on the critical path (which path changed, from what to what); Concurrency and mitigation efforts; Requested extension and any related general conditions cost (amount from me only: [$]); Attachments list.
    
    Use only my dates and durations. If my numbers don't add up (e.g., the forecast date shift doesn't equal the requested days), tell me.

    Attach: Schedule updates (PDF or XER/MPP reports), fragnet description, daily reports for the period, correspondence.

    Check before use: A scheduler or PM must confirm the critical path in the actual schedule software; Grok cannot run the CPM calculation.

  19. 19. PMs

    OAC meeting minutes

    When: Right after the owner-architect-contractor meeting.

    Show the prompt
    Turn these notes/transcript from the OAC meeting on [date] for [job number, project] into formal meeting minutes.
    
    Format:
    - Header: project, meeting number [#], date, location/Teams, attendees by company (from: [list]).
    - Old business: carry forward items from last minutes [paste open items] with updated status.
    - New business by topic: Schedule, Safety, RFIs, Submittals, Change orders, Owner items, Design items, Site/logistics.
    - Each item numbered [meeting#.item#], with Discussion (2 sentences max), Action, Responsible party (company + person), Due date.
    - Decisions made: separate list.
    - Next meeting date.
    - Standard closing line: "These minutes are considered accurate unless written corrections are received within [5] business days."
    
    Do not record anything as a decision unless the notes clearly show it was agreed.

    Attach: Meeting transcript (Teams) or notes, last meeting's open items list.

    Check before use: Check that every decision and owner commitment is really what was said; send for corrections within the window.

  20. 20. PMs

    Submittal log from spec sections

    When: At project start, to build the Procore submittal register.

    Show the prompt
    Read the attached specification sections and build a submittal register for [job number].
    
    For each spec section, list every submittal required under "Submittals" (Part 1) and anything required in closeout (warranties, O&M, attic stock, record drawings, certifications).
    
    Columns: Spec section | Section title | Submittal type (product data, shop drawings, samples, mock-up, test reports, certificates, LEED/sustainability, warranty, O&M, attic stock) | Description | Responsible sub/trade [suggest] | Required for approval vs. information only | Lead time concern (Y if typically long-lead, e.g., switchgear, RTUs, storefront, elevators, doors/hardware) | Notes.
    
    Output as a table I can paste into Excel for import to Procore. Do not invent submittals that the spec doesn't require; mark items you're inferring with "(inferred)".

    Attach: Project manual / spec sections (PDF).

    Check before use: Spot-check 3-4 sections against the spec text, and confirm long-lead items with suppliers, not Grok.

  21. 21. PMs

    Subcontractor pay app review vs. schedule of values

    When: Monthly when sub pay apps come in, before approving in Procore.

    Show the prompt
    Review this subcontractor pay application for [sub name, trade] on [job number], period ending [date].
    
    Compare against: the subcontract SOV and amount [attached/paste], approved sub change orders [list], last month's approved pay app [attached], and the super's estimate of percent complete by line [paste].
    
    Check and report: line items billed ahead of the super's percent complete; stored materials billed without backup (invoice, bill of lading, insurance, photos); math errors (line totals, retainage at [X]%, previous applications, current due); change orders billed that are not approved; retainage calculated correctly; required attachments (conditional lien waiver for this payment, unconditional for the prior payment, certified payroll if required).
    
    Output: a line-by-line table with Billed % | Super's % | Variance | Action, then a recommended approved amount, the reason for each reduction, and a short note to send the sub explaining adjustments.

    Attach: Sub pay app (G702/G703 or their form), subcontract SOV, prior pay app, super's % complete, lien waivers.

    Check before use: Recalculate the approved amount in Excel or Procore; the recommended number is a starting point, and the PM approves.

  22. 22. PMs

    Owner pay app pre-check

    When: Before submitting our pay app (G702/G703) to the owner.

    Show the prompt
    Check our draft pay application to [owner] for [job number], period [date], before submission.
    
    Verify: the SOV matches the contract SOV and approved change orders; percent complete by line is consistent with the schedule update [attach] and the sub pay apps we approved this month [summary]; retainage at [X]% (and any reduction per contract section [__]); stored materials have backup; G702 math (original sum, net change by CO, contract sum to date, total completed and stored, retainage, less previous certificates, current payment due); required attachments per contract (lien waivers from us and subs, updated schedule, certified payroll, insurance).
    
    Return: a list of errors, a list of risks the architect may reject, and the attachments still missing.

    Attach: Draft G702/G703, contract SOV, CO log, sub pay apps summary, schedule update.

    Check before use: Have accounting tie the G702 totals to QuickBooks billing before the PM signs and notarizes.

  23. 23. PMs

    Lien waiver and retainage tracker

    When: Monthly with pay apps, and at closeout.

    Show the prompt
    Build a lien waiver and retainage tracker for [job number] from the attached list of sub and supplier payments.
    
    Columns: Sub/supplier | Pay app # / period | Amount paid | Date paid | Conditional waiver received (Y/N, date) | Unconditional waiver received for prior payment (Y/N, date) | Retainage held to date | Retainage released | Notes.
    
    State note: some states require statutory waiver forms (e.g., in Texas, private-project waivers must use the forms in Tex. Prop. Code §53.284: conditional/unconditional, progress/final). Our state: [state]. Flag any waiver that is not on the required form, any amount or through-date that doesn't match the payment, and any sub that has sent a lien notice letter.
    
    End with: a list of missing waivers by sub, and the email text to request them.

    Attach: Payment register from QuickBooks or Procore, received lien waivers, any notice letters received.

    Check before use: Verify statutory form use and amounts on the actual waivers; confirm your state's current lien law requirements with counsel for disputed items.

  24. 24. PMs

    Punch list organizer

    When: After a punch walk with the owner or architect.

    Show the prompt
    Turn these punch walk notes and photo captions for [job number] into a punch list.
    
    Notes: [paste, may be mixed English/Spanish].
    
    Output a table: Item # | Location (building/floor/room/grid) | Description (clear, specific) | Responsible trade/sub | Priority (life safety / occupancy / cosmetic) | Due date [default: date + 10 working days] | Status: Open.
    
    Group by responsible sub, and give me a short message per sub (in English and Spanish) listing their items and the due date. Flag any items where the responsible trade isn't clear.

    Attach: Walk notes, photos with captions, room/area list.

    Check before use: The PM confirms the responsible sub for each item before sending; enter the final list in Procore Punch.

  25. 25. PMs

    Closeout checklist

    When: 60 days before substantial completion.

    Show the prompt
    Create a closeout checklist for [job number, project type] using the attached contract closeout requirements and spec Division 01 sections ([01 77 00 Closeout Procedures], [01 78 00 Closeout Submittals]).
    
    Group by: Substantial completion (punch, certificate of occupancy, AHJ inspections, fire marshal, utility releases); Documents (as-builts/record drawings, O&M manuals by spec section, warranties by spec section with start dates, attic stock with transmittals, training sessions with sign-in sheets, test and balance report, commissioning); Financial (final lien waivers from all subs and suppliers on statutory forms, consent of surety if bonded, final pay app, retainage release request, closing out commitments in Procore, final job cost review in QuickBooks); Owner turnover (keys, access cards, warranty contact list, final cleaning).
    
    Columns: Item | Spec/contract reference | Responsible | Due | Status. Note which items hold up retainage release.

    Attach: Contract closeout section, Division 01 specs, submittal register.

    Check before use: Compare against the actual contract: owners often add requirements (e.g., digital O&M formats) that a generic list misses.

  26. 26. PMs

    Warranty letter and warranty log

    When: At substantial completion when issuing the GC warranty to the owner.

    Show the prompt
    Draft [Company]'s one-year (or [X]-year per contract section [__]) general contractor warranty letter to [owner] for [job number, project], with warranty start date [substantial completion date].
    
    Then build a warranty log from the attached sub/manufacturer warranties: System | Spec section | Sub | Manufacturer | Warranty length | Start date | End date | Contact for warranty calls | Document received (Y/N).
    
    Also draft a short "How to request warranty service" page for the owner's facility team: who to call, what info to include (location, photo, description), our response time commitment [X business days].

    Attach: Contract warranty section, collected warranties.

    Check before use: Confirm the warranty term and start date against the contract; do not promise response times we haven't agreed internally.

  27. 27. PMs

    Email thread triage and reply

    When: When a long owner, architect or sub thread needs an answer.

    Show the prompt
    Here is an email thread about [job number]. Summarize: what's being asked, by whom, by when, and any commitments anyone made (with dates). Then draft a reply from me ([name, title]) that [goal: confirms schedule / requests the revised COI / pushes back on the back-charge / requests a decision by date].
    
    Keep it under 150 words, direct and polite. Don't agree to any cost, schedule change or responsibility that isn't in my instructions.

    Attach: The pasted thread (remove bank/payment details).

    Check before use: If the thread involves a change to payment or bank instructions, stop and verify by phone; never handle that through a draft.

  28. 28. Field

    Daily report from voice notes

    When: End of every workday.

    Show the prompt
    Turn my notes into a daily report for [job number], date [date]. Notes may be in English, Spanish, or both: [paste or dictate].
    
    Sections: Weather (AM/PM conditions, temperature, any work stopped); Manpower by company and trade (headcount and hours); Work completed by area; Deliveries (what, supplier, received complete/damaged); Equipment on site; Inspections (type, inspector, pass/fail); Visitors; Delays or issues (what, cause, who is affected, time lost); Safety observations and any incidents; Tomorrow's plan.
    
    Write in clear English, factual, past tense. If a section has nothing in my notes, write "None reported," don't make anything up. List any headcounts or quantities you weren't sure about at the end as "Confirm:".

    Attach: Voice notes or texts, site photos.

    Check before use: Check headcounts, inspection results and delay causes; daily reports are evidence in delay claims. File the final in Procore.

  29. 29. Field

    3-week lookahead from notes

    When: Weekly, before the sub coordination meeting.

    Show the prompt
    Build a 3-week lookahead for [job number] starting [Monday date] from my notes and the master schedule excerpt.
    
    Notes: [paste: what each trade is doing, constraints, inspections, deliveries].
    
    Output a table by week and day: Activity | Area | Trade/sub | Start | Finish | Constraints (submittal approval, material delivery, inspection, RFI answer, predecessor work, weather) | Constraint cleared (Y/N) | Responsible.
    
    Then list: constraints not yet cleared that could stop work in the next 2 weeks, inspections to call in and when, and deliveries to confirm. Flag any activity that is behind the master schedule dates I gave you.

    Attach: Master schedule excerpt, last week's lookahead, notes.

    Check before use: Confirm sub manpower commitments in the coordination meeting; the lookahead is a plan, not a commitment from subs.

  30. 30. Field

    Bilingual crew message / sub coordination notice

    When: Sending instructions to crews or foremen who prefer Spanish.

    Show the prompt
    Write a short message to the [trade] foreman and crew on [job number], in English and Spanish (plain construction Spanish the way your crews speak it, not formal Castilian).
    
    Message: [what you need to say, e.g., concrete pour moved to Thursday 6 AM; pump arrives 5:30; no one on deck after 3 PM Wednesday; bring extra vibrator].
    
    Keep each version under 80 words, bullet points, with the date and time in both. Put English first, then Spanish.

    Attach: None.

    Check before use: Have a bilingual foreman or super read the Spanish once for any safety-critical message.

  31. 31. Field

    Inspection readiness checklist

    When: The day before calling a city inspection.

    Show the prompt
    I'm calling a [inspection type, e.g., above-ceiling / framing / MEP rough-in / slab pre-pour / fire sprinkler hydro / final building] inspection with [city or other AHJ] on [job number] for [area].
    
    Give me a walk checklist of the items inspectors commonly write up for this inspection on a commercial project, in the order I'd walk them, with a checkbox column and a "who fixes it" column. Include the paperwork the inspector may want on site (approved plans, permit card, engineer letters, test reports).
    
    Keep it practical, one line per item. Note that local amendments vary and list anything I should confirm with the AHJ.

    Attach: Approved permit drawings for the area (optional).

    Check before use: This is a memory jogger, not the code; follow the approved plans and the AHJ's checklist where one exists.

  32. 32. Field

    Receipt photo: what and which cost code

    When: When a card purchase is made, until it's coded in Ramp.

    Show the prompt
    Here is a photo of a receipt from a purchase for [job number]. Tell me: vendor, date, items bought, subtotal, tax, total. Then suggest the most likely cost code from this list: [paste the job's Procore cost code list], with a one-line reason. If it could fit two codes, give both and say what would decide it.

    Attach: Receipt photo, the job's cost code list.

    Check before use: This is only a suggestion; the cost code is chosen in Ramp (or by accounting), and nothing goes into QuickBooks from a chat.

  33. 33. Accounting

    Collections email sequence

    When: When an owner invoice or pay app is past due.

    Show the prompt
    Draft three collection emails from [Company] to [owner contact] for [job number], pay app #[__], amount [$], submitted [date], due [date] per the contract.
    
    Email 1 (at [5] days past due): friendly check-in, confirm they received the pay app and ask for the expected payment date.
    Email 2 (at [15] days): firmer, reference the contract payment terms (section [__]) and our state's prompt payment law (e.g., in Texas, Tex. Prop. Code ch. 28) in one neutral sentence, ask for a date.
    Email 3 (at [30] days): formal, from [owner name], state the amount and days outstanding, note our rights under the contract (including any right to suspend work after notice per section [__]), request payment or a call by [date].
    
    Each under 120 words. No threats beyond what the contract allows.

    Attach: Pay app, contract payment section.

    Check before use: Confirm the pay app wasn't rejected or held for missing documents before sending, and have an owner approve email 3.

  34. 34. Accounting

    Job cost variance explanation

    When: Month-end, when a cost code is over budget or a job's margin moved.

    Show the prompt
    Explain the job cost variance on [job number] for [month]. Data (attached): budget by cost code, cost to date from QuickBooks (job cost accounts: [list yours, e.g., subcontract, materials, labor, equipment]), committed costs from Procore, and approved change orders.
    
    For each cost code over budget by more than [$X or X%]: show budget, committed, actual, variance (from the data; if you calculate, show the formula), and the likely reason category: unbought scope, approved CO not yet in budget, card spend coded to the wrong job/code, timing (cost posted before billing), true overrun. List the specific transactions that drive it.
    
    End with a 3-sentence explanation for the owners and the questions to ask the PM.

    Attach: Budget vs. actual export, QuickBooks transaction detail by job, Procore commitments and CO log.

    Check before use: Tie the variance totals back to QuickBooks and Procore reports; reason categories are hypotheses until the PM confirms.

  35. 35. Accounting

    W-9 and COI chase

    When: Onboarding a new sub or vendor, and when certificates expire.

    Show the prompt
    Draft an email to [vendor/sub name, contact] requesting [a signed W-9 / an updated certificate of insurance] for work on [job number].
    
    COI requirements per our subcontract: CGL [$ per occurrence / $ aggregate], auto [$], workers' comp statutory and employer's liability [$], umbrella [$]; [Company] [and owner: name] as additional insured on a primary and non-contributory basis with waiver of subrogation, ongoing and completed operations (endorsement forms required: [CG 20 10 / CG 20 37 or equivalent]); 30-day notice of cancellation.
    
    Also: review the attached COI they sent and list what's missing or doesn't meet these requirements (limits, endorsements, named insured matching the W-9, expiration dates).
    
    Email under 120 words with a checklist, and a line saying we cannot release payment until compliant documents are received [if that's our policy].

    Attach: Current COI and endorsements (if received), subcontract insurance exhibit.

    Check before use: A COI is not the policy: confirm endorsements are attached, and never accept a bank or payment change request by email.

  36. 36. Accounting

    Month-end close checklist

    When: Last 3 business days of each month.

    Show the prompt
    Create a month-end close checklist for a small commercial GC using QuickBooks Online, Ramp cards and Procore. Our setup: job costs by job (Class or Customer:Job = job number like 26-001), G&A in separate accounts, sub invoices processed in Procore, card spend synced from Ramp.
    
    Include: Ramp receipts and coding complete (no uncoded card spend over [$X]); Procore sub invoices approved and synced to QuickBooks; owner billings entered; AR aging review; AP aging review; retainage receivable and payable reconciled to Procore; bank and card reconciliation; payroll and burden allocated to jobs; accruals for received-not-invoiced materials; WIP schedule updated and over/under billing entry; job cost report reviewed with PMs; close the period in QuickBooks.
    
    Columns: Task | Owner | Due (business day -3 to +5) | System | Done.

    Attach: None.

    Check before use: Adjust owners and timing to who actually does each task at your company; closing the QuickBooks period is a human step only.

  37. 37. Accounting

    Sub invoice vs. commitment check

    When: When a sub or supplier invoice arrives outside the pay app process.

    Show the prompt
    Check this invoice from [vendor] for [job number] against the commitment (PO/subcontract) [attached/paste]: amount, billed to date, remaining, approved COs.
    
    Tell me: does the invoice exceed the remaining commitment; are prices or quantities different from the PO; is it billing for change work not approved; is sales tax handled correctly for [new construction lump-sum / separated contract / exempt owner] (just flag it for the accountant, don't decide); and which cost code it belongs to.
    
    Output: Approve / Hold / Question, with the reason and the email to the vendor if Hold.

    Attach: Invoice, PO or subcontract, CO log.

    Check before use: Sales-tax treatment depends on your state and the contract type; the accountant decides, Grok only flags.

  38. 38. Safety

    Toolbox talk (English / Spanish)

    When: Weekly safety meeting with crews.

    Show the prompt
    Write a 10-minute toolbox talk on [topic, e.g., ladder safety / heat illness / struck-by / trenching / silica / fall protection at leading edges / electrical cords] for a [project type, e.g., tenant improvement / ground-up tilt-wall] crew in [your state].
    
    Format, first fully in English and then fully in Spanish (plain field Spanish):
    - Why it matters (one real-world style example, no names)
    - 5 key rules, short and specific, tied to the OSHA standard [cite the 29 CFR 1926 subpart if you know it; say "verify" if unsure]
    - What to do on this site today: [site-specific hazards I'll add]
    - 3 discussion questions
    - Sign-in sheet block: date, job number, topic, presenter, name/firma, company/compañía.

    Attach: Optional: site photos or hazards for this week.

    Check before use: Check the content against the company safety program and OSHA; Grok doesn't replace a competent person.

  39. 39. Safety

    Job hazard analysis (JHA)

    When: Before any new or high-risk activity starts.

    Show the prompt
    Create a job hazard analysis for [task, e.g., setting RTUs with a crane / demolition of existing ceiling with asbestos survey clear / cutting concrete / working from a scissor lift] on [job number].
    
    Table: Step | Hazards | Controls (in hierarchy order: eliminate, substitute, engineering, administrative, PPE) | Responsible | Permit or competent person required (e.g., lift plan, hot work, confined space, excavation).
    
    Include required training/certifications, equipment inspections and an emergency response section (nearest hospital [I'll fill in], rescue plan for falls). Provide a Spanish version of the step list and controls for crew review.

    Attach: Task description, equipment, site conditions.

    Check before use: The super or competent person reviews it with the crew on site; site conditions decide the final controls.

  40. 40. Safety

    Incident report

    When: Within 24 hours of any injury, near miss or property damage.

    Show the prompt
    Help me write an incident report for [job number]. Facts: [date/time, location, who (role and company only, no medical details beyond what's needed), what they were doing, what happened, injury/damage, first aid or treatment, witnesses (roles), photos available, immediate actions taken].
    
    Format: Incident summary; Timeline; Immediate cause; Contributing factors (ask me questions if I haven't given enough to identify these, rather than guessing); Corrective actions with owners and dates; Whether it may be OSHA recordable or reportable (list the criteria to check: in-patient hospitalization, amputation, eye loss within 24 hours; fatality within 8 hours), and notifications needed (insurance carrier, owner per contract, sub's employer).
    
    Factual, no blame language, no speculation.

    Attach: Witness statements, photos, notes.

    Check before use: an owner decides OSHA recordability and reporting; keep medical information confidential and out of shared channels.

  41. 41. Safety

    Site-specific safety plan outline

    When: At mobilization on a new job.

    Show the prompt
    Draft a site-specific safety plan outline for [job number, project type, address, scope highlights, duration] using our company safety program as the base [attach].
    
    Sections: Project info and emergency contacts (hospital, police, fire, utility locate 811); Site logistics and access; Orientation process (bilingual); Key hazards for this project and controls (fall protection, excavation, cranes and rigging, electrical, silica, heat, traffic/public protection); Required permits (hot work, excavation, lift plans); PPE requirements; Sub safety requirements (JHAs, competent persons, toolbox talks); Inspections and audits schedule; Incident reporting; Emergency action plan and muster point.
    
    Mark the items I need to fill in with [TBD].

    Attach: Company safety program, site logistics plan.

    Check before use: The plan must match the company program and the owner's contract safety requirements.

  42. 42. Safety

    Heat illness prevention plan for summer work

    When: Before May each year, and on jobs with exterior work.

    Show the prompt
    Write a heat illness prevention plan for our crews in [your region], aligned with OSHA's heat guidance (check whether our state has its own heat standard and whether any federal heat rule is in effect; say "verify" if unsure).
    
    Include: water, rest, shade requirements; acclimatization schedule for new and returning workers; how the super monitors heat index (with trigger levels and actions); signs of heat exhaustion vs. heat stroke and first aid; emergency procedure; buddy system; a 1-page crew handout in English and Spanish.

    Attach: None.

    Check before use: Confirm current federal heat rule status and any owner contract requirements before adopting.

  43. 43. Business development

    Proposal / statement of qualifications

    When: Responding to an RFQ or RFP.

    Show the prompt
    Draft a statement of qualifications for [Company] responding to [RFQ/RFP name] for [owner], [project type, size, location].
    
    Use only these facts about us: [paste: founding year, founders' experience, relevant projects with permission to share, team resumes, safety record, bonding capacity, services offered].
    
    Follow the RFQ's required section order and page limits: [paste evaluation criteria]. For each criterion, write a section that answers it directly in the first sentence, then supports it with a specific project or fact.
    
    Also produce: a compliance matrix (RFQ requirement | where we answer it | page), and a list of facts I still need to provide. Don't invent projects, numbers or certifications.

    Attach: RFQ/RFP, resumes, project sheets, safety stats.

    Check before use: Every project, number and credential must be real and approved for use; check the compliance matrix against the RFQ before submitting.

  44. 44. Business development

    Project case study

    When: After a project completes, for the website and proposals.

    Show the prompt
    Write a project case study for [project, with owner permission to name: yes/no]. Facts: [type, size, location, delivery method, schedule, challenges, how we solved them, results such as finished X days early or under budget (only if true)].
    
    Format: Title; 2-sentence summary; The challenge; Our approach (3-4 specific points); Results; Project facts sidebar (owner, architect, size, duration, delivery method). 250-350 words, plain language, no superlatives. Also give a 2-sentence version for LinkedIn.

    Attach: Project facts, photos.

    Check before use: Get owner approval before publishing names, photos or results.

  45. 45. Business development

    Meeting follow-up to a developer or owner

    When: Same day after a BD meeting or site visit.

    Show the prompt
    Write a follow-up email from [owner name] to [contact, company] after our meeting on [date] about [project/opportunity].
    
    Points discussed: [paste]. Next steps we agreed: [paste]. What I want: [e.g., get the drawings by Friday / schedule a site walk / introduce our design-build approach].
    
    Under 150 words, specific to the conversation, one clear next step with a date. No generic "great to meet you" opening.

    Attach: Meeting notes.

    Check before use: Only include commitments actually made in the meeting.

  46. 46. Business development

    LinkedIn post from a project milestone

    When: When a job hits a milestone worth sharing.

    Show the prompt
    Write a LinkedIn post for [Company] about [milestone, e.g., topping out / slab pour / turnover] on [project, if owner approved naming]. Facts: [details, crew shout-out (first names only if approved), what made it hard].
    
    80-150 words, first person plural, plain language, one specific detail that only someone on the job would know, no hashtag spam (max 3), no emojis unless I ask. Give 2 options.

    Attach: 1-3 photos.

    Check before use: Confirm owner approval to post and that photos show proper PPE.

  47. 47. Business development

    Interview prep: owner/developer shortlist presentation

    When: When shortlisted for a project interview.

    Show the prompt
    We're shortlisted for [project] with [owner]. Evaluation criteria: [paste]. Our team: [names and roles]. The owner's likely concerns: [schedule, budget, local labor, design-build experience].
    
    Build: a 20-minute presentation outline with who presents each part; 3 specific things about this project we should show we understand (from the RFP: [paste key details]); 15 likely owner questions with strong, honest answers using only our facts; and 3 questions we should ask them.

    Attach: RFP, our proposal, team resumes.

    Check before use: Rehearse answers with real numbers; delete any answer that overstates our experience.

  48. 48. Hiring

    Job posting: project manager

    When: When hiring a PM.

    Show the prompt
    Write a job posting for a Project Manager at [Company], [City, State] (commercial GC, founded [year], small team). Projects: [types and size range]. Systems: Procore, Microsoft 365, QuickBooks Online.
    
    We want people who own outcomes: emphasize ownership of the job from buyout to closeout (budget, schedule, owner relationship, subs, change orders, pay apps), not paperwork. Include: about us (3 sentences), what you'll own, what you bring ([X]+ years commercial PM, ground-up and TI experience, Procore, contract and change-order management, Spanish a plus), compensation range [$__-$__] plus [vehicle/bonus/benefits], how to apply.
    
    Under 350 words, specific, no clichés like "rockstar" or "fast-paced environment."

    Attach: None.

    Check before use: Have the owners confirm the compensation range and requirements; keep requirements to what's actually needed.

  49. 49. Hiring

    Job posting: superintendent

    When: When hiring a superintendent.

    Show the prompt
    Write a job posting for a Superintendent at [Company], [City, State]. Projects: [types, sizes, ground-up and TI]. Requirements: [X]+ years running commercial jobs as the super, OSHA 30, ability to run subs and schedule, daily reports and lookaheads in Procore, bilingual English/Spanish strongly preferred, valid driver's license.
    
    Include: what a good week looks like for this role, what you'll own, what you bring, compensation [$__-$__] plus [truck/allowance/bonus/benefits], travel within [your region]. Under 300 words. Also provide a Spanish version of the posting.

    Attach: None.

    Check before use: Make sure the Spanish posting matches the English requirements and compensation.

  50. 50. Hiring

    Structured interview questions and scorecard (PM or super)

    When: Before interviews, so each candidate gets the same questions.

    Show the prompt
    Create a structured interview for a [Project Manager / Superintendent] at a small commercial GC.
    
    Give 12 questions: 8 behavioral/situational using real construction scenarios (e.g., a sub is two weeks behind and won't add manpower; the owner directs extra work verbally; a pay app is rejected the day before it's due; a near miss on a scissor lift; a change order the owner disputes; the architect is slow on RFIs and the schedule is slipping; a WIP review shows your job fading 4 points), 2 technical (e.g., walk me through how you'd review a sub's pay app against the SOV; how you build a 3-week lookahead), 2 about how they use Procore/technology.
    
    For each: what a strong answer includes, red flags, and a 1-5 scoring rubric. End with a one-page scorecard template. Questions must be job-related only; nothing about age, family, religion, national origin, disability or other protected characteristics.

    Attach: Job description.

    Check before use: Have the interviewers agree on the rubric beforehand and score independently before discussing.

  51. 51. Owners · needs connectors

    Connected: jobs where committed cost exceeds budget

    When: Weekly, or before a PM meeting.

    Show the prompt
    Using the Procore connector (budget, commitments, change orders) and the QuickBooks connector (job cost actuals), list every active job where committed cost plus uncommitted actual cost exceeds the current budget for any cost code.
    
    For each: Job number | Job name | Cost code | Revised budget | Committed (Procore) | Actual not covered by a commitment (QuickBooks) | Projected over/under | Pending change orders that might cover it.
    
    Sort by largest overrun. Then give me a 3-bullet summary and the questions to ask each PM. Limit to jobs with status [active]. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing; the connectors supply the data.

    Check before use: Open the top two overruns in Procore and confirm the budget and commitment amounts before talking to the PM.

  52. 52. Accounting · needs connectors

    Connected: uncoded Ramp spend by cardholder and job

    When: Weekly (Monday) to chase coding.

    Show the prompt
    Using the Ramp connector, list all card transactions from [start date] to [end date] that are missing a job number or Procore cost code (not yet coded in Ramp).
    
    Group by cardholder: transaction date | merchant | amount | memo | job (if any) | days since purchase. Show a subtotal per cardholder only if the connector returns one, otherwise list the transactions and mark "subtotal: compute in Ramp."
    
    Then draft a short, friendly Teams message to each cardholder listing their items and asking them to code them in Ramp by [day]. Do not send the messages. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: Confirm the list against Ramp's own view before sending reminders; coding itself happens in Ramp, not in chat.

  53. 53. Owners · needs connectors

    Connected: billed to date and margin snapshot for a job

    When: Any time an owner asks "where are we on 26-0XX?"

    Show the prompt
    For job [26-0XX], using the QuickBooks and Procore connectors, give me: contract value plus approved change orders (Procore), billed to date and retainage held (QuickBooks), cost to date by major cost category (as your job cost accounts group them, e.g., subcontract, materials, labor, equipment), committed but not yet invoiced (Procore), pending change orders, and gross margin to date as reported by the system.
    
    Present as a one-screen summary with the source next to each line. If the Procore and QuickBooks figures disagree (e.g., cost in QuickBooks not in Procore), list the differences as a separate section. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: If margin looks off, check for uncoded card spend and unposted sub invoices before drawing conclusions.

  54. 54. Owners · needs connectors

    Connected: over/under billing (WIP) watch

    When: Monthly before close, or mid-month as an early warning.

    Show the prompt
    Using the WIP data from the connectors (QuickBooks billings and costs, Procore budgets and estimated cost at completion), list jobs where over- or under-billing exceeds [$25,000 or 10% of billed to date].
    
    For each: Job number | % complete by cost | % billed | Over/(under) billing as reported | Estimated cost at completion last updated (date) | Likely reason (pay app timing, cost not billed, EAC stale, unapproved COs in revenue). Mark reasons as "possible" since you can't confirm them.
    
    End with which PMs to talk to and the specific question for each. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: WIP depends on the PM's estimated cost at completion; confirm it's been updated this month before acting on the flag.

  55. 55. Accounting · needs connectors

    Connected: AR over 30 days with draft follow-ups

    When: Weekly collections run.

    Show the prompt
    Using the QuickBooks connector, list open customer invoices more than [30] days past due as of today: Job number | Customer | Invoice/pay app # | Amount | Due date | Days past due | Retainage portion (if shown).
    
    For each, draft a polite follow-up email (under 100 words) appropriate to the age: 30-45 days friendly, 46-60 firmer with the contract payment terms, 60+ flagged for an owner to call instead of email. Present drafts only; do not send and do not change any invoice. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: Check with the PM that the pay app wasn't rejected or on hold before any email goes out; a person sends each one.

  56. 56. Accounting · needs connectors

    Connected: QuickBooks vs. Procore cost reconciliation

    When: Month-end, before WIP.

    Show the prompt
    For each active job, compare cost to date in QuickBooks (job cost accounts, by job) with cost to date in Procore (direct costs + approved sub invoices). List every job where they differ by more than [$1,000].
    
    For each difference, list the transactions that appear in one system but not the other (date, vendor, amount, account/cost code). Common causes to check: Ramp card spend posted as category lines without an item (doesn't reach Procore), sub invoices approved in Procore but not synced, costs posted to the wrong job number. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: Fix differences at the source (Ramp coding or the Procore sync); never adjust QuickBooks from this list without the accountant.

  57. 57. Owners · needs connectors

    Connected: 13-week cash outlook with a what-if

    When: Weekly owners' check-in, or before a large commitment.

    Show the prompt
    Using the cash forecast and AR/AP data from the connectors, show the next 13 weeks: starting cash, expected receipts by job, expected payments (subs, payroll, card spend, G&A), and ending cash per week. Highlight the low week.
    
    Then run this scenario as a clearly labelled what-if: [e.g., pay app #__ on 26-0XX slips 2 weeks / we pay sub X early / a $__ retainage release arrives in week __]. Show only the weeks that change, before vs. after. Do the scenario arithmetic step by step so I can check it. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: The scenario is arithmetic on the forecast, not a prediction; check the low-week figure against the forecast in your cash forecast.

  58. 58. Field · needs connectors

    Connected: my job's card spend this week

    When: Friday afternoon, for the super on their own job.

    Show the prompt
    Using the Ramp connector, show card purchases on job [26-0XX] from [Monday date] to today: date | cardholder | merchant | amount | cost code (or "uncoded"). Only show my job. Then list which purchases still need a receipt or cost code, and suggest the likely cost code for each from this job's code list, labeled as a suggestion. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing (the job's cost code list if the connector doesn't provide it).

    Check before use: Pick the final cost code in Ramp; suggestions can be wrong.

  59. 59. PMs · needs connectors

    Connected: commitments status and remaining to bill

    When: Monthly before sub pay apps, or during buyout.

    Show the prompt
    For job [26-0XX], using the Procore connector, list every commitment (subcontracts and POs): Vendor | Cost code | Original amount | Approved change orders | Revised amount | Invoiced to date | Remaining | Retainage held | % invoiced. Also list budget lines with no commitment yet (unbought scope) and their budget amount.
    
    Flag commitments over [90]% invoiced while the schedule shows their work less than complete [I'll paste % complete if needed], and any commitment invoiced over its revised amount. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Optional: super's % complete by trade.

    Check before use: Confirm flagged commitments in Procore and with the super before holding a sub payment.

  60. 60. Owners · needs connectors

    Connected: Monday executive digest (on demand)

    When: Monday morning, or before a partner meeting.

    Show the prompt
    Using the Procore, QuickBooks and Ramp connectors, summarize last week across all active jobs for the owners in one page:
    1. Per job: billed vs. cost to date, change in projected margin from last week (if available).
    2. Uncoded card spend total by job (from Ramp).
    3. Jobs over/under billed beyond [threshold].
    4. AR over 30 days.
    5. Cash: next 4 weeks low point.
    6. Top 3 risks with the job number and the number that caused each flag.
    
    Bullets, numbers with sources, no adjectives. Internal only. Read-only. Use only numbers returned by the connector tools; never calculate a figure from memory or estimate a missing value. Cite the job number and data source for every number. If a tool returns no data or errors, say which tool and stop rather than guessing. Do not write, post, approve or change anything in any system.

    Attach: Nothing.

    Check before use: Internal use; anything forwarded to an owner, lender or partner gets edited and approved by an owner.

12 Grok Bot routines

Scheduled jobs for a Grok Bot. Replace the [channel] names with your own Teams channels, and get each one working in chat before you schedule it. Every run uses your usage pool.

  1. Routine 1 · Every Monday 6:30 AM local time

    Monday executive digest

    Using the Procore, QuickBooks and Ramp connectors (read-only), build a one-page digest of last week for the owners. For each active job (job numbers like 26-001): billed to date, cost to date, projected margin and change vs. last week if available. Then: uncoded Ramp card spend by job and cardholder, jobs over/under billed by more than $25,000 or 10%, customer invoices more than 30 days past due, the lowest cash week in the next 4 weeks, and the top 3 risks with the job number and the exact figure that triggered each. Use only numbers returned by the tools and cite the source for each; if a tool fails or returns nothing, say so in a 'Data gaps' line instead of estimating. Do not send email or change any record.

    Tools:
    Procore connector (read), QuickBooks connector (read), Ramp connector (read), Microsoft Teams
    Output:
    Post to Teams channel '[Leadership channel]' (private to the owners)
    Approval:
    No approval needed to post to the private channel. Never email it outside the company; never write to QuickBooks, Procore or Ramp.
  2. Routine 2 · Monday and Thursday 8:00 AM local time

    Uncoded card spend nudge

    Using the Ramp connector, find card transactions older than 2 days that have no job number or Procore cost code in Ramp. Group them by cardholder. Post one message to the [Accounting channel] listing each cardholder's count of uncoded items and the oldest date, and @mention each cardholder with a link to Ramp. Do not list amounts for anyone in the shared channel except the count. Do not suggest final codes and do not change anything in Ramp or QuickBooks.

    Tools:
    Ramp connector (read), Microsoft Teams
    Output:
    Teams channel '[Accounting channel]' with @mentions
    Approval:
    Posting in the internal channel is allowed. Any direct email to a cardholder: ask first. Never write to Ramp or QuickBooks.
  3. Routine 3 · Every Tuesday 9:00 AM local time

    Weekly AR follow-up drafts

    Using the QuickBooks connector, list open customer invoices and pay apps more than 30 days past due: job number, customer, invoice/pay app number, amount, due date, days past due. For each 30-60 days past due, prepare a draft follow-up email in Outlook drafts (polite, under 100 words, referencing the pay app number and contract payment terms). For anything over 60 days, do not draft an email; add it to a 'Call list for the owners'. Post the table and list of drafts to the [Accounting channel]. Do not send any email and do not change invoice status.

    Tools:
    QuickBooks connector (read), Outlook (drafts only), Microsoft Teams
    Output:
    Table to Teams '[Accounting channel]'; email drafts saved in the billing mailbox Drafts folder
    Approval:
    Ask first before sending any email; a person reviews and sends each draft. Never write to QuickBooks.
  4. Routine 4 · Every Wednesday 7:00 AM local time

    Budget overrun watch

    Using the Procore connector (budget, commitments, change orders) and the QuickBooks connector (job costs), list active jobs where any cost code's committed cost plus uncommitted actual cost exceeds the revised budget by more than $5,000 or 5%. For each: job number, cost code, revised budget, committed, uncommitted actual, projected overrun, and pending change orders. Sort by overrun. Post to each affected job's Teams channel tagged to the PM, and a summary to the [Leadership channel]. Use only tool data; flag data gaps.

    Tools:
    Procore connector (read), QuickBooks connector (read), Microsoft Teams
    Output:
    Teams: each job channel (e.g., '[Jobs > 26-001]') plus summary to '[Leadership channel]'
    Approval:
    Internal posts allowed. No changes to budgets or commitments; PMs make changes in Procore.
  5. Routine 5 · Monthly, 3rd business day before month-end, 7:00 AM local time

    Month-end WIP prep pack

    Using the QuickBooks and Procore connectors, prepare the WIP review pack: for each active job, contract value with approved COs, billed to date, cost to date, estimated cost at completion and the date it was last updated, percent complete by cost, over/under billing as reported, and margin vs. bid margin. Flag jobs where the estimated cost at completion has not changed in 60 days, over/under billing exceeds $25,000 or 10%, or margin faded more than 2 points. For each flagged job, write 3 questions for the PM. List any jobs where QuickBooks and Procore cost to date differ by more than $1,000. Save as a Word document in the SharePoint folder 'Accounting/WIP/[YYYY-MM]' and post the link.

    Tools:
    QuickBooks connector (read), Procore connector (read), SharePoint (write to WIP folder only), Microsoft Teams
    Output:
    Word doc in SharePoint 'Accounting/WIP/[YYYY-MM]'; link posted to '[Leadership channel]'
    Approval:
    Creating the document in the WIP folder is allowed. Never post WIP entries or journal entries to QuickBooks; the over/under billing entry is made by accounting.
  6. Routine 6 · First Monday of each month, 8:00 AM local time

    COI and W-9 expiry chase

    Read the vendor compliance list in SharePoint ('[Vendor Compliance list]') and the active commitments from the Procore connector. List subs and suppliers with active commitments whose certificate of insurance expires within 30 days or has expired, or who have no W-9 on file. For each, prepare a draft request email in Outlook drafts listing the specific missing items (limits, additional insured and waiver of subrogation endorsements, updated expiration, W-9). Post the list to the [Accounting channel] with a flag on any vendor with a pending payment.

    Tools:
    SharePoint (read), Procore connector (read), Outlook (drafts only), Microsoft Teams
    Output:
    Teams '[Accounting channel]'; drafts in the accounting mailbox
    Approval:
    Ask first before sending any email. Never request or accept bank account changes; route any such reply to a person for phone verification.
  7. Routine 7 · Weekdays 4:30 PM local time

    Daily report draft from field notes

    For each active job channel, read today's posts, voice note transcripts and photos the superintendent added under the 'Daily notes' thread (English or Spanish). Draft a daily report with: weather, manpower by company and trade, work completed by area, deliveries, inspections and results, delays/issues with cause, safety observations, tomorrow's plan. Write 'None reported' for empty sections and list uncertain headcounts or quantities under 'Confirm'. Reply in the thread with the draft and @mention the superintendent. Do not file anything in Procore.

    Tools:
    Microsoft Teams (read/reply in job channels)
    Output:
    Reply in each job channel's 'Daily notes' thread
    Approval:
    Draft only; the superintendent confirms and files the final daily log in Procore.
  8. Routine 8 · Every Friday 11:00 AM local time

    Friday 3-week lookahead draft

    For each active job, read this week's daily notes thread and the latest lookahead file in the job's SharePoint folder 'Schedule/Lookaheads'. Draft next week's 3-week lookahead table (activity, area, trade, start, finish, constraints, constraint cleared Y/N, responsible). List constraints not cleared that could stop work in the next 2 weeks and inspections to schedule. Save as a new dated Excel file in the same folder and post the link to the job channel for the superintendent.

    Tools:
    Microsoft Teams (read), SharePoint (read; write to the job's Lookaheads folder only)
    Output:
    Excel file in the job's SharePoint 'Schedule/Lookaheads' folder; link in the job's Teams channel
    Approval:
    Saving a new draft file is allowed; never overwrite or delete existing files. The super edits before sending to subs; any email to subs: ask first.
  9. Routine 9 · Every Thursday 7:00 AM local time

    Open RFI and submittal aging

    Using the Procore connector, list for each active job: open RFIs older than 7 days and submittals past their required-by date or with the architect longer than the contract review period ([10] working days by default). For each: number, subject, ball-in-court, days open, and the schedule activity it affects if noted. Draft (do not send) a polite reminder for each item with the architect more than 10 working days. Post per job channel and tag the PM. If the connector does not expose RFIs or submittals, post 'RFI/submittal data not available from connector' and stop.

    Tools:
    Procore connector (read), Outlook (drafts only), Microsoft Teams
    Output:
    Each job's Teams channel; reminder drafts in the PM's Drafts folder
    Approval:
    Ask first before sending any reminder to the architect or owner. No changes in Procore.
  10. Routine 10 · Monthly on the 20th, 8:00 AM local time (adjust to the pay app cycle)

    Pay app week lien waiver check

    Using the Procore connector (commitments, sub invoices, payments) and the lien waiver folder in each job's SharePoint ('Financial/Lien Waivers'), list for each job: subs and suppliers paid last cycle without an unconditional waiver for that payment, subs invoicing this cycle without a conditional waiver, and retainage held by sub. Note any waiver file that does not appear to be on your state's statutory form, if it has one (name only; a person reviews). Post the missing-waiver list per job and prepare draft request emails.

    Tools:
    Procore connector (read), SharePoint (read), Outlook (drafts only), Microsoft Teams
    Output:
    Teams '[Accounting channel]' plus each job channel; drafts in the accounting mailbox
    Approval:
    Ask first before sending any email. Payment holds are decided by the PM and accounting, not the bot.
  11. Routine 11 · Every Friday 2:00 PM local time (for Monday use)

    Weekly bilingual toolbox talk

    Pick next week's toolbox talk topic from the safety calendar in SharePoint ('Safety/Toolbox Talk Calendar'); if none is listed, choose based on this week's safety observations in the job channels and the season (heat May-September). Write a 10-minute talk in English then Spanish: why it matters, 5 key rules with the OSHA 1926 reference, 3 discussion questions, and a sign-in block with job number, date, topic, presenter, name/firma, company/compañía. Save to 'Safety/Toolbox Talks/[YYYY-MM-DD]-[topic]' and post the link to the [Safety channel].

    Tools:
    SharePoint (read calendar; write to Toolbox Talks folder only), Microsoft Teams
    Output:
    Word doc in SharePoint 'Safety/Toolbox Talks'; link in Teams '[Safety channel]'
    Approval:
    The safety lead or a super reviews before it's used on site. No outbound email.
  12. Routine 12 · Every Monday 7:30 AM local time

    Job number consistency check

    Compare the active job list across the Procore connector (projects), the QuickBooks connector (customers/jobs or classes) and the Ramp connector (job/department field), plus the top-level project folders in SharePoint. List any job that exists in one system but not another, or where the job number (format YY-NNN, e.g., 26-001) or name differs. Also list QuickBooks or Ramp costs from the last 7 days posted to inactive or closed jobs. Post the list to the [Accounting channel]. Do not rename or create anything.

    Tools:
    Procore connector (read), QuickBooks connector (read), Ramp connector (read), SharePoint (read), Microsoft Teams
    Output:
    Teams '[Accounting channel]'
    Approval:
    Report only. Any fix is made by a person in the source system; never write to QuickBooks.

Company context template: About [Your Company]

Paste this into Grok's custom instructions or a Project's instructions so every answer starts from how your company works. Fill in the brackets, delete what doesn't apply, and keep the rules for numbers.

About [Your Company]

ABOUT [YOUR COMPANY] (paste into Grok custom instructions or a Project's instructions)

WHO WE ARE
- [Company name], [City, State]. Founded [year]. [Commercial general contractor / design-build / CM / owner's rep: keep what applies].
- Project types: [e.g., commercial, industrial, retail, office, hospitality, mixed-use]. Mostly in [region].
- Owners: [names and titles]. Team: [project managers, superintendents, estimator, office/accounting].
- How we like to work: [one or two lines, e.g., "big-GC reporting and discipline without big-GC overhead"].

HOW WE NUMBER AND ORGANIZE WORK
- Job numbers look like [YY-NNN, e.g., 26-001 is the first job of 2026]. Always give the job number first, then the job name (e.g., "26-001 Main St Retail").
- The same job number is used in [Procore (project), QuickBooks Online (customer:job or class), Ramp (job field), SharePoint (project folder)]. If you see a mismatch, point it out.
- Lifecycle: [RFP or opportunity -> project folder -> estimate -> if won, project set up in PM system -> buyout -> construction -> closeout -> warranty].

SYSTEMS
- [Procore]: budgets, commitments (subcontracts and POs), change orders, RFIs, submittals, daily logs, punch, sub invoices. Cost codes follow [CSI divisions; paste your cost code list or the top-level divisions].
- [QuickBooks Online]: accounting. Job cost accounts: [list, e.g., subcontract, materials, labor, equipment]. Overhead / G&A accounts: [list].
- [Ramp]: company cards. Every card purchase needs a job number and a cost code.
- [Microsoft 365]: Outlook, Teams ([e.g., one channel per job]), SharePoint/OneDrive for files.
- Connectors to [Procore, QuickBooks and Ramp] are READ-ONLY. You may read and summarize. You never create, edit, approve, post or delete anything in those systems.

RULES FOR NUMBERS
- Only use dollar amounts, dates, quantities and percentages that come from a connector, an attached file or my message. Never estimate, recall or invent a figure.
- When you calculate something, show the formula and inputs so I can check it.
- Cite the source for each number (connector name, report, file and page).
- If data is missing, say "not in the data" and tell me where to find it. Do not fill gaps.
- Money in US dollars with commas ($1,250,000). Dates as MM/DD/YYYY in letters. Units: [imperial (SF, LF, CY, tons)]. Time zone: [your time zone].

WRITING STYLE
- Direct, professional, plain English. Short paragraphs and tables. No hype, no filler, no emojis in anything external.
- Letters and emails: signed "[Name], [Title], [Company], [City, State], [phone], [email]". Give the body text with a subject line and a job reference block (Project: / Job No.: / Re:).
- Contract correspondence (notices, RFIs, change orders): neutral and factual, cite contract sections and drawing or spec references, never admit fault or responsibility, and reserve rights where cost or time may be affected.
- Field communication: when asked for Spanish, use plain construction Spanish the way our crews speak it. English first, then Spanish.

WHAT NOT TO DO
- Never commit [Company] to a cost, price, date, schedule or scope. Drafts only; a person reviews and sends.
- Never send an email, post externally, or approve anything without asking first.
- Never write to [QuickBooks, Ramp or Procore].
- Never give legal, tax or insurance conclusions as fact. Flag the issue and say who should decide (counsel, CPA, insurance broker).
- Never handle bank account or payment-instruction changes. Tell me to verify by phone.
- Don't include personal information (SSNs, bank numbers, medical details) in outputs, and remind me if I paste any.
- Don't name owners, projects or people in anything public (LinkedIn, website) unless I confirm approval.
- State rules to keep in mind and flag for verification: [your state's prompt payment law, lien and retainage rules, statutory lien waiver forms, limits on broad-form indemnity. Example for Texas: Tex. Prop. Code ch. 28, Tex. Prop. Code ch. 53 and §53.284, Tex. Ins. Code ch. 151].

WHEN YOU'RE UNSURE
- Ask one clarifying question rather than guessing, or state your assumption at the top of the answer.

Worked examples

Five prompts run on sample data, with what came back and what a person had to check. The check column is the important one.

Example 1 · sample data

RFI from a field conflict

Input

PM prompt (RFI draft): 'Job 26-0XX Sample Retail Shell. Ceiling grid at 9'-0" AFF on A-301 conflicts with 24x14 supply duct on M-201 at grid C/4; duct bottom is at 8'-10". Framing for the soffit starts 12/08. Suggest dropping ceiling to 8'-8" in Corridor 104 only. Answer needed by 12/03.' Attached: photo of the duct in place.

What Grok returned

Subject: Ceiling height conflict at Corridor 104, grid C/4. Question: Sheet A-301 shows the acoustical ceiling in Corridor 104 at 9'-0" AFF. Sheet M-201 shows a 24x14 supply duct along grid C between 3 and 5; as installed per the approved duct shop drawing, the bottom of duct is 8'-10" AFF, which conflicts with the ceiling grid. Please confirm whether the ceiling in Corridor 104 may be lowered to 8'-8" AFF, or provide an alternate direction. Suggested resolution: Lower the Corridor 104 ceiling to 8'-8" AFF; no change to other rooms. Required by: 12/03/2026, as soffit framing in this area begins 12/08/2026. Impact: Potential cost and/or schedule impact; [Company] reserves the right to request an adjustment.

What a person checked

PM confirms 'as installed per the approved shop drawing' is true (Grok inferred it; the prompt didn't say so, so delete it if unsure), the sheet and grid references, and the dates. Then enters it in Procore RFIs.

Example 2 · sample data

Leveling three drywall bids

Input

Estimator prompt (bid leveling) with three sample bids: Sample Drywall A $412,800, Sample Drywall B $389,500, Sample Drywall C $455,000, plus our 18-item Division 09 scope sheet.

What Grok returned

A table with 18 scope rows x 3 bidders. Gaps found: B excludes fire caulking at head of wall and deflection track ('by others'); A qualifies shaft wall as 'per unit price $14.50/SF'; all three are silent on patching after MEP trades. Amounts copied exactly; one line on C's bid marked 'unclear in scan: alternate 2 reads $18,?00'. Questions: ask B to price firestopping and deflection track; ask all three to confirm patching; ask C to restate alternate 2. No totals adjusted, plug column left blank.

What a person checked

Estimator re-reads each amount against the PDFs (especially the flagged one), prices the plugs for B's exclusions from our own costs, and decides whether B is still low once leveled. The award is a person's decision.

Example 3 · sample data

Super's Spanglish voice note to daily report

Input

Voice note pasted: 'Sunny, like 48 in the morning, 61 afternoon. Framing crew 6 guys, los de electric 4, plumbing 2. Terminamos top track en el area B, started layout area C. Delivery de drywall llegó 10:30, 2 bundles dañados, se los mandé de regreso. City did above ceiling on area A, pasó. Lift battery died, perdimos como una hora. Mañana: board area B, electric rough area C.'

What Grok returned

Weather: Sunny, approx. 48°F AM / 61°F PM; no work stopped. Manpower: Framing 6, Electrical 4, Plumbing 2 (companies not stated). Work completed: Top track complete in Area B; layout started in Area C. Deliveries: Drywall delivered 10:30 AM; 2 bundles damaged and returned to supplier. Inspections: City above-ceiling inspection, Area A: passed. Delays: Scissor lift battery failure, approx. 1 hour lost (framing). Safety: None reported. Tomorrow: Hang board in Area B; electrical rough-in in Area C. Confirm: company names for each trade; hours worked; whether the 1-hour loss affected one crew or more.

What a person checked

Super adds company names and hours, confirms the inspection result and the delay description (it matters for any future delay claim), then files it in Procore Daily Log.

Example 4 · sample data

Connected query for over-budget cost codes

Input

Owner asks Grok (connected prompt): 'Using the Procore and QuickBooks tools, list jobs where committed cost exceeds budget.'

What Grok returned

Source: Procore budget/commitments, QuickBooks job cost, pulled 11/24/2026 (sample data). 26-0XA, 09-2900 Gypsum Board: revised budget $380,000; committed $389,500; uncommitted actual $0; over $9,500; pending CO #4 (corridor soffits) $12,300 not yet approved. 26-0XB, 01-5000 Temporary Facilities: budget $18,000; committed $6,200; uncommitted actual (QuickBooks materials account, card spend) $14,950; over $3,150. Note: $4,100 of that card spend is uncoded in Ramp, so the cost code is assumed from the GL category. Data gap: 26-0XC returned no Procore budget. Questions: 26-0XA: will CO #4 be approved, and does it cover the full buyout gap? 26-0XB: is the temp fencing rental a job cost or should part of it be G&A?

What a person checked

Owner opens 26-0XA's budget in Procore to confirm the $389,500 commitment, has accounting confirm the $4,100 uncoded card spend in Ramp, and asks the PM why 26-0XC has no budget loaded. No numbers are changed from chat.

Example 5 · sample data

Sub pay app review against the SOV

Input

PM prompt (sub pay app review): Sample Electric pay app #3, period ending 11/25/2026, subcontract $520,000 with approved CO #1 $8,400; super's percent complete: rough-in 70%, gear 0% installed, lighting 10%. Pay app bills rough-in 85%, switchgear stored material $46,000, lighting 10%, retainage 10%.

What Grok returned

Line table: Rough-in billed 85% vs. super 70%, reduce to 70%. Switchgear stored materials $46,000: no invoice, bill of lading or proof of insurance attached, hold until backup is received (or confirm it's stored on site/in a bonded warehouse per subcontract). Lighting 10% matches. Retainage: 10% calculated on the current-period line only, not on stored materials; check whether the subcontract withholds on stored materials. Math: column G total doesn't equal the sum of lines 1-9 (difference shown with the line values). Attachments: conditional waiver for this payment present; unconditional waiver for pay app #2 missing. Recommended amount and reasons listed, plus a short note to the sub.

What a person checked

PM recalculates the approved amount in Procore (not from Grok's figure), confirms the stored material terms in the subcontract, and requests the missing unconditional waiver for pay app #2 before releasing payment.

AI use policy template

A starting policy for a small commercial GC using Grok and Grok Bot. Copy it into Word, fill in the [DECIDE] blanks, and have everyone sign the acknowledgment. It loosely follows the NIST AI Risk Management Framework: Govern (this policy), Map (data classes and approved uses), Measure (the ROI tracker) and Manage (the checklist and risks).

[Company] AI Use Policy. Version 1.0. Effective [DECIDE: date]. Policy owner: [DECIDE: owner name]. Backup: [DECIDE: name].

1. Purpose

We use AI to spend less time on paperwork and more time building. This policy covers how we use Grok and Grok Bot safely: our clients' information stays protected, our numbers stay correct, and a person stays responsible for everything that leaves the company or changes our books. It applies to every employee and to any contractor who uses AI on our work.

2. Approved tools

ToolPlanWho gets itUse it for
Grok (chat)Company-paid business seat on a company email[DECIDE: owners, PMs, estimator, office; supers yes or no]Drafting, reading documents, research, and questions answered from company data through approved connectors
Grok BotSigned in with the company seat[DECIDE: owners only at first, or add one PM]Scheduled routines, meeting recaps, and drafts that wait for approval
Custom connectors (MCP)One read-only key per connectionBy role (section 3)Job cost, WIP, card spend and KPI questions
xAI APICompany developer accountNo staff useBehind-the-scenes automations only

Not approved for company work: personal or free Grok accounts, the X app's Grok, or any other AI tool (ChatGPT, Gemini, Copilot, browser extensions) unless it is added to this table. If you use more than one AI vendor, decide which tool covers what. [DECIDE: list other approved AI tools]

3. Who can use what

RoleGrok chatGrok BotConnected data they can ask about
OwnersYesYesEverything: all jobs, WIP, cash, KPIs, card spend
PMs and estimatorYes[DECIDE: yes or no]Their own jobs: budget, cost, billed to date, uncoded spend. No company-wide margin or cash.
Superintendents[DECIDE: yes or no]NoTheir own uncoded card expenses and their job's cost-code list
Office and accountingYesNoCard spend, AR aging, coding status. No owner contracts unless assigned.

Nobody shares a login or a key, and nobody gets more access without an owner's approval.

4. Data classes: what may go into Grok

ClassExamplesGrok chat (business seat)Grok Bot
PublicOur website, published specs, OSHA rules, product data sheetsYesYes
InternalDaily reports, meeting notes, schedules, RFIs, toolbox talks, sub correspondenceYesYes
ConfidentialBids and estimates, sub pricing, job cost and margin, WIP, owner contracts not under NDA, employee names and rolesYes, on the company seat only. Use a connector for numbers rather than pasting spreadsheets.Only through approved connectors. Not as uploaded files on the shared Bot computer.
RestrictedBank and routing numbers, card numbers, SSNs and personal tax IDs, payroll and pay rates, I-9 and medical information, passwords and API keys, owner contracts or drawings under NDANeverNever

If you're not sure, treat it as one class higher. If information is under NDA and the NDA limits sharing with “third parties” or “service providers”, it stays out of Grok unless an owner gets written OK. [DECIDE: confirm whether any current owner agreements restrict AI tools]

5. Human review

  • AI drafts, people send. A person reads every letter, email, RFI, change-order request, pay-app note or owner report before it goes out, and is responsible for it as if they wrote it.
  • AI never commits us to cost, time or scope. Only an owner or the assigned PM does that, in their own words.
  • Contracts: Grok is a reading aid, not a lawyer. Check anything that matters (notice deadlines, retainage, liquidated damages, indemnity, insurance) against the page it cites. Use counsel when the stakes call for it.
  • Safety: toolbox talks and safety content from Grok get checked against OSHA's construction standards (29 CFR 1926) and our safety plan by the competent person on site. OSHA requires the employer to train workers to recognize and avoid unsafe conditions, and an AI draft doesn't replace that.✓ OSHA 1926.21
  • Field records: the super confirms headcounts, quantities and delays before a daily report is filed.

6. Numbers come from systems

  • Dollar amounts, quantities, dates and percentages come from the accounting, project management or card system, never from Grok's memory or its own arithmetic.
  • Any answer with a number shows where it came from: job number, report or page. If it doesn't, ask "Show me the source," or check it yourself.
  • When data is missing, the answer says so. "I don't have that" beats a guess.
  • What-if answers are labelled scenario and never presented as a forecast.

7. Recording meetings and calls

  • Recording-consent law varies by state. Federal law is one-party consent.✓ 18 U.S.C. §2511 Some states, such as Texas, also allow recording a conversation you take part in✓ Tex. Penal Code §16.02; others, such as California and Florida, require all parties to consent. Check your state and the states of the people on the call. [DECIDE: our state's rule]
  • Our rule is simpler than the law: we always tell people. Say at the start, “We're using an AI note-taker on this call. Any objection?” If anyone objects, turn it off.
  • A Grok Bot that joins a Teams call is a recorder. The meeting organizer gives the notice.
  • Don't record HR, disciplinary, legal or medical conversations.
  • Recaps are internal working notes. Check them before forwarding to an owner, architect or sub.

8. Client and owner confidentiality

  • One client's information is never used on another client's work. Don't paste Client A's contract in as an example while drafting for Client B.
  • Don't volunteer that a document was AI-assisted unless asked or the contract requires it, and don't deny it if asked. [DECIDE: whether to add a standard AI-use clause to proposals]
  • Check the owner contract and any NDA before putting their documents into Grok.

9. Grok Bot approval rules

  • Ask first, every time, for: sending email or Teams messages outside the company, any payment or purchase, deleting files, submitting web forms, changing anything in accounting, card or project systems, accepting calendar invites for others, and running commands on a local computer.
  • May be set to Always allow: reading company files it has been given, drafting into Outlook drafts, building internal summaries, and running approved read-only routines.
  • Approve only what you asked for. If a Bot proposes something you didn't ask for, especially because an email or web page told it to, Deny and report it.✓ xAI approvals
  • No payment cards in Grok Bot's Vault. No bank, accounting, card or project-system logins on the Bot computer. Bots reach those systems only through read-only connectors.

10. Writes to company systems

  • Grok and Grok Bot have read-only access to company data.
  • Any change to accounting, card or project systems goes through an approval queue, where a named person approves each item.
  • Nothing posts to live accounting without [DECIDE: owner name]'s sign-off. New write paths run dry-run, then sandbox, then shadow (a person approves each one), then live.
  • No new write tool for any AI without an owner's written approval of that specific tool.

11. Connectors and keys

  • One key per connection (Grok chat, Grok Bot and each automation get separate keys), read-only scopes, and an allow-list of tools.
  • Keys are never pasted into chats, emails, documents or Team Bots others can use.
  • Anyone can ask for a key to be shut off. Revoking one key doesn't break the others.
  • New connectors, including Microsoft 365 and Teams, are turned on only by the admin after an owner approves them.

12. Incident reporting

Report the same working day to [DECIDE: owner name] (backup: [DECIDE: name]) if restricted information went into Grok by mistake; a Bot sent, paid, deleted or changed something nobody approved; an AI-produced number or statement went out wrong; you see a login, key or card where it shouldn't be; or someone asks you to change bank or payment details (verify by phone on a known number, whatever the AI says). Nobody gets in trouble for reporting a mistake quickly. Hiding one is the problem.

13. Review and acknowledgment

Monthly, the admin runs the security checklist. Quarterly, the owners review this policy, the approved tool list, xAI's terms and the ROI scorecard.

I have read the [Company] AI Use Policy, version 1.0. I will follow it, and I will ask before I use AI in a way it doesn't cover.

Name: ______________ Role: ______________ Signature: ______________ Date: ________

Security and settings checklist

Tick each item at setup. Recheck the ones marked (M) every month.

A. Grok Business admin

  • Buy seats on company emails only. Confirm the price and no-training terms at checkout.✓ source
  • Ask xAI for the Trust Center (NDA required) and the DPA, and file them with the policy.✓ source
  • Multi-factor sign-in for every seat. Remove leavers on their last day; without SSO (Enterprise), removal is manual. (M)
  • Set retention to the shortest setting that works, if your plan offers custom retention. [DECIDE: days]
  • Turn on only the connectors in the policy.✓ source

B. Grok Bot

  • Decide who gets Grok Bot. On a Teams-type plan there is no switch to turn it off, so control access through who holds a seat.✓ source
  • Privacy Mode on for each Bot account.✓ source
  • Treat the Bot computer as shared. No bank, accounting, card or project logins on it, no cards in the Vault. (M)
  • Ask-first rules for external sends, payments, purchases, deletes, form submits and local commands. Review Always-allow rules and remove any that cover sending, paying or deleting. (M)
  • Team Bots: add no keys, secrets or files you wouldn't give every teammate on that Bot.
  • Set an account-level spending cap. [DECIDE: $/month] There is no separate Grok Bot cap. Check usage weekly for the first month.
  • Bot email addresses leave messages as drafts for a person to send.

C. xAI API (if you build automations)

  • One API key per automation, in a secrets manager, never in code, chat or email. Rotate every 90 days or on staff change.
  • Set a monthly spend limit. [DECIDE: $/month]
  • Decide on Zero Data Retention. xAI recommends against it for most customers. [DECIDE: ZDR on or off]✓ source
  • Consider the US regional endpoint so processing stays in the US (grok-4.7 and 4.6 only, about 10% more).✓ source
  • Use allowed_tools on every MCP connection. Remote MCP has no built-in approval step, so approvals live in your own queue.✓ source

D. Microsoft 365 and Teams

  • The M365 admin approves the Grok and Grok Bot apps in Entra ID after reviewing the permission list.
  • Use delegated permissions (act as the signed-in user), not tenant-wide app permissions.✓ source
  • Limit SharePoint access to the sites each role needs. Keep HR, payroll and NDA folders out of reach.
  • Decide which Teams channels a Bot may join. Check Entra Enterprise applications for unknown AI apps users have consented to. (M)

E. Custom connectors (MCP)

  • One key per connection (Grok chat, Grok Bot, each automation), named after its user and purpose.
  • Read-only scopes. MCP off by default and turned on per key.
  • Tool allow-list and rate limit per key. Start with project list and job cost tools; add WIP and KPI tools later. Field keys can't see company-wide margin, cash or WIP.
  • Every call logged with key, tool, job and time. Test revocation: kill one key and confirm the others still work.
  • No write tools without an owner's written approval per tool, and then only through the approval queue.

F. Monthly review (about 30 minutes)

  • Seat list matches current staff. Grok Bot rules, Vault and connected apps are still clean.
  • Connector audit log: unusual volume, off-hours calls, denied calls, unknown keys.
  • Spend (seats, overage, API), incidents and near-misses closed, and any xAI plan or terms changes since last month.

Training plan

Four short, hands-on sessions, one per role, each on the person's own seat with sample data or their own non-restricted work. An owner opens each session with why you're doing this.

Owners, 45 minutes

The policy in five rules (10 min with the admin view: seats, connectors, key list, how to revoke). Then 25 minutes of exercises and 5 minutes to settle the [DECIDE] items.

Exercises

  1. Upload a sample owner contract (not under NDA) and ask for payment terms, retainage, notice deadlines, LDs and insurance, each with a page reference. Check two citations.
  2. Through a connector: "Which jobs have uncoded card spend over $1,000, and what's billed to date on 26-001?" Then ask "Show me the source."
  3. Set up a read-only Monday summary routine. Add an Ask-first rule for sending outside the company and watch the approval card.

PMs and estimator, 60 minutes

Policy with a focus on human review, confidentiality and accuracy (10 min), prompt basics (10 min), exercises (35 min), add favorite prompts to the shared library (5 min).

Exercises

  1. Draft an RFI from rough notes (ceiling grid on A-301 conflicts with the duct on M-201 at grid C/4). Iterate twice, then check it against the drawings.
  2. Level three sample drywall bids against the scope sheet. Spot-check every total against the PDFs.
  3. Ask a connector "Which cost codes on my job are over budget?" Then ask for company-wide margin to see the role limit work.

Superintendents, 30 minutes on their phones

Three rules: don't photograph or paste restricted info, check your numbers, and you file the final report yourself. Then exercises in the mobile app and Q&A.

Exercises

  1. Dictate rough site notes and turn them into a daily report. Correct the headcount.
  2. Photograph a sample receipt and ask for vendor, total, tax and likely cost code from the pasted job list. Then code it yourself.
  3. Generate a 10-minute ladder-safety toolbox talk in English and Spanish. Compare it with OSHA's ladder rules and the site safety plan.

Office and accounting, 45 minutes

Policy with a focus on restricted data (bank, payroll, SSNs), read-only connectors and the approval queue. Payment-fraud rule: bank-change requests are verified by phone, never through AI.

Exercises

  1. List card transactions over 7 days old and still uncoded, by cardholder, and draft a friendly nudge for each. Drafts only.
  2. Ask which invoices are more than 30 days past due and draft follow-ups. Check two amounts against QuickBooks.
  3. Read a sample sub pay application and list missing backup (lien waiver, COI, schedule of values match).

First-week checklist (each person)

  • Signed the policy acknowledgment.
  • Signed in to the company seat (not a personal account) with multi-factor on.
  • Attended the role session and saved the one-page cheat sheet.
  • Used Grok on at least three real tasks, with review before anything left the company.
  • Tried one connector question (if your role has one) and checked the source.
  • Added one useful prompt to the shared library.
  • Noted how long a task took before and with Grok, for the ROI tracker.
  • Sent one piece of feedback to the admin: worked, didn't, or wish it could.

Prompt-writing tip sheet

Build prompts from five parts:

  1. Role: “You're a commercial GC project manager in [state].”
  2. Context: the job, the parties, what has happened. Attach the document rather than describing it.
  3. Task: one clear ask. “Draft an RFI to the architect.”
  4. Format: “One page, numbered questions, a response-needed-by date, a schedule-impact line.”
  5. Constraints: “Don't state costs. Mark anything you're unsure of with [CHECK]. Cite the page or sheet for each point.”

Then: ask for sources, treat the first answer as a draft, ask it to list what it's unsure of, save prompts that work, and start a fresh chat when you switch jobs so details don't leak between them.

ROI and adoption tracker

Baseline before rollout, then measure monthly. Saved hours only become dollars if they go to billable or growth work, or let you avoid a hire.

#MetricBaseline (before rollout)Measure monthly from
1Hours per week on RFIs, letters and change-order correspondenceEach PM logs two normal weeksSame log, one sample week a month
2Daily report completion (% of site days filed by next morning)Daily log, last 30 daysDaily log
3Contract or spec review turnaround (days)Last 3 to 5 contractsEach new contract
4% of card spend coded within 7 daysCard data, last 60 daysCard coding report
5Uncoded card $ at month endLast month endEach month end
6Days to produce WIP and owner summary after month endLast 2 to 3 month endsEach month end
7Collections (DSO)AR aging, last 3 monthsAccounting at month end
8Bid leveling time per trade packageEstimator log, 2 to 3 bidsPer bid
9Rework from AI errors (caught internally vs. sent out)Starts at 0Incident log plus reviewer tally. Target: zero sent out.
10Active users per week (used Grok 3+ days)0Grok usage analytics
11Connector questions per week and % answered with a source0Connector audit log
12AI spend per month (seats, overage, API)Planned budgetxAI and Grok billing

Monthly scorecard

One row per metric with columns: Baseline, Last month, This month, Trend, Note or action. End each month with a line for the decision: keep, cut or expand.

Worked example (made-up numbers)

  • 3 PMs save 2.5 hours a week each on RFIs and letters: 32.5 h × $75 = $2,436
  • 1 estimator saves 3 hours per bid, 2 bids a month: 6 h × $70 = $420
  • Office saves 4 hours a month chasing coding and AR: 4 h × $45 = $180
  • Owners save 3 hours a month on WIP and the owner summary: 3 h × $150 = $450
  • Gross time value about $3,486 a month, less about $230 of AI cost (6 seats × $30 + $50 overage)
  • Net about $3,256 a month, roughly 14 to 1 on tool cost (loaded rates, 4.33 weeks a month, savings net of review time)

Count hard savings (an avoided hire, fewer write-offs, faster collections) separately from soft time savings. Use your own baseline, not these numbers.

FAQ for owners

Is our data used to train Grok?

For Grok Business chat, xAI says no: "no training on it, ever." For the xAI API, not without your explicit permission. Grok Bot runs on Cursor's systems and follows your Cursor privacy settings; with Privacy Mode on, data is not used for training. Make sure every Grok Bot account is on Privacy Mode (not the legacy one).

How long does xAI keep our data?

The xAI API keeps requests and responses for 30 days, then deletes them. Grok Bot's cloud computer keeps files and browser sessions until you delete them, and data is deleted within 30 days of a written request after service ends. Configurable retention periods are an Enterprise feature for both Grok Bot and Grok Business chat. The docs set no retention period for Business chat below Enterprise.

Can Grok post entries to QuickBooks?

Not out of the box. Grok and Grok Bot have no built-in QuickBooks connector. Intuit publishes an official QuickBooks Online MCP server, but it runs locally (stdio), so it fits Grok Bot's "Command" option rather than Grok chat. Start read-only, keep any posting behind an "Ask first" rule, and have a person review in QuickBooks.

Does Grok work with Procore?

There is no native Procore connector and no official Procore MCP server as of November 2026. Options are a hosted third-party MCP such as Zapier's, or a custom read-only MCP or API bridge built on Procore's REST API. Grok Bot can log into the Procore web app with computer use, but that is brittle and puts a login on the shared Bot computer, so keep it to viewing at most.

Does Grok work with Ramp?

There is no native Ramp connector. Ramp's open-source MCP server used read-only scopes but was archived in July 2026. A Ramp-hosted MCP endpoint appears only in third-party listings and is unconfirmed. Plan on the Ramp Developer API (read-only), Zapier, or a custom connector.

What if Grok is wrong?

It can be. Grok Bot's Auto Review is on by default, you can add up to 20 "Ask first" rules, and Ask first wins when both kinds of rule match. xAI says its safeguards reduce, but do not eliminate, the risk from bad instructions hidden in emails or web pages. A good house rule: Grok drafts and a person sends, and numbers come from QuickBooks and Procore reports, never from the AI's memory.

Can Grok send emails or Teams messages on its own?

Yes, if you allow it. The Outlook connector includes the Mail.Send permission and the Teams connector can post messages. Grok Bot prepares drafts and asks before risky actions. Add an "Ask first" rule for anything sent outside the company.

Can field staff use Grok Bot on their phones?

Yes. Grok Bot has iPhone and Android apps (iOS 18+, Android 9+). On the phone you can attach photos, dictate, use live voice chat, approve or deny actions, and watch the Bot's screen. Once a Team Bot is set up in Microsoft Teams, field staff can also @mention it there. Each phone user needs an eligible seat, or their usage is charged elsewhere.

Does Grok speak Spanish?

The Grok Bot app interface comes in 38 languages, set under Settings, General, Language. xAI describes its voice features as multilingual, but no official page we read named Spanish voice support specifically. Test it with a crew member before promising it.

Does Grok work inside Microsoft Teams?

Two ways: the Grok chat Teams connector, which reads and posts as the signed-in user, and a Grok Bot Team Bot added to Teams channels and chats. The Team Bot needs a Teams admin to approve it in the Teams admin center, and setup can take up to an hour.

Do we need IT to approve anything?

Probably, once. Most Microsoft 365 tenants need an admin to grant consent for Grok's access in Microsoft Entra, and a Teams admin to approve the Grok Bot Teams app. If one of the owners holds Global Admin, they can do both.

What does Grok cost for a small contractor, and can the bill run away?

Seats are $30 per user per month for Grok Business or X Subscription Premium, $100 for Super and $200 for Ultra (prices checked November 24, 2026). Extra usage is only charged if you allow it: set a monthly additional-usage limit and leave Auto Top-up off. A task already running can go slightly over the cap. A 5-person example with light API use comes to about $145 to $165 a month.

What happens if we cancel?

A cancelled seat stays active until the end of the billing period. Deleting the Grok Bot account removes the account and its data within 30 days. Files saved to your own SharePoint or OneDrive stay. Removing a Grok Business connector deletes Grok's indexed copy, not your files. App Store, Google Play and X subscriptions are cancelled separately, and prepaid API credits are generally non-refundable.

Can Grok Bot buy things with our company card?

Only if you give it one. A card saved in the Bot's Vault fills in at checkout without asking each time. The safer rule: don't save cards. Leave "Securely save to Bot's vault" unchecked, so the Bot must get your approval on the exact total every time.

Who is behind Grok, and is it stable?

Grok is made by xAI. Press reports say xAI merged into SpaceX in 2026 and that Grok Bot runs on Cursor, which SpaceX also bought. Grok Bot 1.0 shipped November 11, 2026. Plan names, usage pools and model IDs changed several times in 2026, so keep integrations portable (MCP and APIs) and review the terms each quarter.

Glossary

Plain meanings for the words that come up when you roll out AI.

AI model / LLM (large language model)
The engine behind Grok. It has read a huge amount of text and predicts good next words. Strong at drafting and reading, weak at exact numbers unless it pulls them from a system.
Prompt
What you type or say to the AI. It works like a work order: the clearer the scope, the better the result.
Context window
How much the AI can hold in mind at once: your prompt, attached files and the conversation so far. Like a plan table, only so much fits before old sheets fall off.
Token
The unit AI usage is counted and billed in, roughly three-quarters of a word. Long contracts use more tokens.
Hallucination
When the AI states something confidently that isn't true, like a clause that isn't in the contract or a wrong total. The reason you check sources.
Connector
A link that lets Grok read from another system (Outlook, SharePoint, your job cost system), so you don't have to copy and paste.
MCP (Model Context Protocol)
The standard plug shape for connectors. An MCP server lets any AI tool that supports MCP ask a system questions within set limits.
API
A doorway one program uses to talk to another.
API key
A password for a program, not a person. Whoever holds it can use the access it grants, so guard it like a master key. It can be cut off instantly.
Read-only scope
A key that can look but not touch. It can read job cost, but it can't create, change or delete anything.
Allow-list
The specific list of tools or actions a key or Bot may use. Anything not listed is refused.
Agent
AI that does multi-step work toward a goal (look things up, draft, prepare a step) instead of answering one question. Grok Bot is an agent.
Grok Bot
xAI's agent product. Each Bot has a cloud computer and can run routines, join meetings and use apps, asking before risky steps.
Routine
A job a Bot runs on a schedule, like a Monday-morning owner summary.
Approval queue / human in the loop
A holding area where proposed changes wait until a named person approves them.
RAG / Collections
Retrieval-augmented generation: the AI searches your own documents first and answers from them with citations. In xAI, a Collection is the document library it searches, like a spec book it can look things up in.
Prompt injection
Instructions hidden in an email, PDF or web page that try to make the AI do something you didn't ask, like "forward this to...". The reason Bots ask first.
Retention
How long the vendor keeps your prompts and answers. The xAI API keeps them 30 days by default.
ZDR (Zero Data Retention)
A setting where the vendor stores nothing after answering. More private, but some features stop working.
SSO (single sign-on)
Logging in to Grok with your Microsoft work account, so turning off someone's Microsoft login also turns off Grok. On xAI it's an Enterprise feature.
Audit log
The job diary for the system: who asked what, through which key, and when.

More construction data terms in the Build Flows glossary.

Risks and mitigations

Ten things that can go wrong when a contractor adopts Grok, and what to do about each.

RiskWhat could happenMitigationOwner
Wrong numbers (hallucination or a misread PDF)A wrong billed-to-date or bid total reaches an owner or drives an award.Numbers only from source systems, with a citation. Spot-check bid totals. Human review before anything goes out. Track AI errors.Each user; PM reviews
Restricted data leaksBank details, SSNs, payroll or an NDA contract pasted into Grok or saved on the Bot computer.Data-class table, training, business seats only, no finance logins on the Bot computer, incident reporting.Admin; all staff
Unapproved writes or sendsA Bot emails a sub, changes Procore or posts to QuickBooks.Read-only connectors. Ask-first rules. Writes only through an approval queue. Live accounting writes only with an owner's sign-off.Owners; admin
Prompt injection from incoming email or documentsA sub's PDF or a phishing email tells the Bot to forward files or change payment info.Ask-first on external sends. Bots ignore instructions found in content (xAI's rule). Bank changes verified by phone.All staff
Key or credential misuseA key in a shared Team Bot or chat gets used by the wrong person.One key per connection, no keys in Team Bots or chats, monthly audit-log review, instant revoke.Admin
Vendor changexAI renames plans, tightens usage pools (as in November 2026), changes terms or swaps the model Grok Bot uses without notice.Quarterly terms check. Connectors built on model-neutral APIs and MCP, so another AI tool can use them. Spend cap.Owners
Vendor data handlingVendor-side retention or an incident exposes company data (xAI reported a coding-tool data retention issue in July 2026).Business seats with no-training terms. DPA and Trust Center on file. Minimum data through connectors, no bulk uploads of restricted files. Consider the US API endpoint.Admin
Cost overrunBot routines burn through the usage pool and overage.Spend cap, weekly usage check in month one, routines reviewed monthly.Admin
Recording without noticeAn out-of-state participant objects to an AI note-taker, or a sensitive conversation gets recorded.Always-announce rule. No recording of HR, legal or medical conversations.Meeting organizer
Two AI systems overlappingGrok and another AI tool both connect to Outlook and SharePoint, with duplicate keys and conflicting answers.Decide which tool covers what. Each gets its own scoped key. One approved-tools list.Owners

What we couldn't verify

Open questions as of November 24, 2026. Ask xAI or check the linked pages before you rely on any of these.

  1. Grok Business vs X Subscription team plan: which one a small company should buy, whether Business seats still sell at $30 (the x.ai/grok/business page was blocked to us), and whether a Premium team seat gets the OneDrive and SharePoint connectors. Ask xAI.
  2. Weekly usage pool sizes for every tier. Not published anywhere.
  3. Super and Ultra multipliers. x.ai/bot (3.5x and 12x Premium) conflicts with the xAI docs and Cursor's pricing page (3.75x and 12.5x).
  4. A Stop button for running Grok Bot tasks. The docs only say to message "Stop now".
  5. Custom auth-header fields for the Grok chat custom MCP connector. The docs mention only OAuth and API-key flows. Grok Bot and the API do document headers.
  6. The xAI API spend-limit screen. Taken from official search snippets of docs.x.ai/console/billing; the page itself was not opened.
  7. Data retention period for Grok Business chat below Enterprise.
  8. status.x.ai, the xAI terms pages and the Trust Center contents (blocked or title only).
  9. A hosted Ramp MCP endpoint (third-party listings only), and any official Procore MCP (none found).
  10. Spanish named explicitly for Grok voice. Only the general "dozens of languages" claim was found.
  11. Exact Microsoft Entra app names for the Grok chat connectors and for Grok Bot. Confirm in Enterprise apps after the first sign-in attempt.
  12. Ownership details (xAI and SpaceX, Cursor) come from press reports, not official pages.

This kit is practical guidance, not legal, tax or insurance advice. Have counsel review the recording and confidentiality sections if a contract or dispute depends on them, and check your own state's rules where we give Texas as an example.

Next step