Procore Agent Playbook
BuildFlows · Field guide for general contractorsPublic edition · Nov 2026

Governed AI agents on Procore data, for GCs building on Google Cloud

Where general contractors lose time and margin, what agents with governed Procore access can take off their plates, how the pieces fit with Gemini Enterprise and the agent platform, and a 90-day path from one pilot to production.

Written for GC operations, project and IT leaders, and the teams building agents with them. Download the PDF.

JOBSITE · PROCORE PROJECT RFI-014 CE-003 BUDGET PROCORE MCP GOVERNED CHECKPOINT validate · policy · confirm · audit AGENT SURFACES RFI radarOverdue RFIs, ranked by who has the ball Change exposurePending items rolled up for the OAC Morning briefIn the super's inbox at 6:00 AM
Illustration. Project records leave Procore, pass one governed checkpoint, and reach people as answers they can act on.Live sandbox results: sheet S-300
G-001General · Summary

The short version

The leak

GC teams spend their week hunting for information

Field and office staff report about 5.5 hours a week just looking for project data, and bad data drives an estimated 14% of all rework.31 At typical GC net margins, every dollar of avoided waste is worth many dollars of new revenue.

The opening

A Gemini-shaped gap into Procore

Procore's new first-party MCP connects only to enterprise Claude today. Support for other AI providers is "coming in 2027."12 A GC standardizing on Gemini Enterprise has no first-party route to Procore right now.

The pattern

One governed layer between agents and Procore

An MCP server that keeps credentials on the server, shows the model a small set of tools instead of 2,755 endpoints, and sends every call through one checkpoint for validation, policy, approval, redaction and audit. It fits Gemini Enterprise's custom MCP connector limits.16

The ask

One GC, one workflow, 90 days

Pick one account and one painful workflow (RFI aging or change exposure are the strongest starts). Run read-only first, measure hours saved, then add approved writes. BuildFlows brings the Procore depth; your cloud team or agent-build partner brings the platform.

A-100Architecture of the problem

Where GC time and margin leak

These are industry numbers. Some are old, so the year is shown on each. In a pilot we replace them with the GC's own figures, pulled straight out of Procore.

5.5 hrsper person, per week, spent looking for project dataFMI / PlanGrid, 20183
14%of all rework is caused by bad data, about $88.7B globallyAutodesk / FMI, 20211
9.7 daysmedian RFI response time; about $1,080 to process each RFI; 21.9% never answeredNavigant study, 20135
6.3%average pre-tax net income across contractors; GC-only margins usually run lowerCFMA Benchmarker, 202410
$165Mmodeled annual cost of bad data for a $1B contractor, including $7.1M of avoidable reworkFMI, 20212
92%of firms struggle to hire; 45% name worker shortages as the top cause of project delaysAGC / NCCER, 20256
29.3%of planned activities start on time; projects deliver 63% of planned weekly workBuildots benchmark13
26%of contractors rate their data quality as high, while 87% expect AI to matter to their businessDodge / CMiC, 20259

A project engineer's 40-hour week

Today
Engineering, coordination, field time · 26 hOther non-optimal · 8.5 hSearching · 5.5 h
With agents
Engineering, coordination, field time · 26 h+2 hOther non-optimal · 8.5 h3.5 h
Productive workRework, waiting, other non-optimal (FMI: 14+ h total incl. searching)Looking for project data (FMI: 5.5 h)Hours given back (illustrative: 2 h)

The leak map

WorkflowWhere it leaks todayWhat an agent with governed Procore access changesProcore data
RFIsAging RFIs sit with the wrong person. Nobody sees the ones blocking work until a super calls.Daily ranked list of overdue RFIs by days open, ball-in-court and the trade or activity they block. Chase drafts written and queued for a human to send.rfis, users, schedule
Change managementExposure lives across change events, PCOs, commitments and spreadsheets. Owners and PMs get different numbers.One rollup of open exposure by status and age, with what's still unpriced and what's sitting un-submitted to the owner.change events, PCOs, CCOs, budget mods
Budget varianceVariance gets found at month-end close, weeks after the cost hit.Weekly variance narrative by cost code, with the lines that moved and the commitments or direct costs behind them.budget views, direct costs, commitments
SubmittalsLong-lead items slip because a submittal sits in review while the procurement clock runs.A list of submittals in review against required-on-site dates, flagging which ones now threaten procurement.submittals, specs, schedule
Field/office gapSupers spend the first hour of the day pulling yesterday's log, open RFIs and inspections into their heads.A morning brief in Chat or email: weather, manpower, open items, inspections due, delays logged.daily logs, inspections, RFIs, photos
CloseoutPunch, warranties and retainage drag on for months after substantial completion.Punch items open by trade and ball-in-court, plus the documents still missing for closeout.punch, inspections, documents
A-110Storyboard

A day on the job, with agents

The same project, the same people, the same Procore. What changes is that the right information finds each person at the moment they need it, and nobody has to go looking.

6:00 AMSuperintendentThe morning brief is waiting: yesterday's manpower, today's inspections, and the RFI that has the curtain wall crew on hold.
9:15 AMProject engineerRFI radar flags the RFIs more than a week late and who holds them. Chase notes are drafted; the PE edits and sends.
11:30 AMProcurementA long-lead submittal is still in review. The agent works back from the required-on-site date and flags that it now threatens the install.
2:30 PMProject managerBefore the OAC meeting, open change exposure is rolled up: what's priced, what's pending, and what hasn't gone to the owner.
Fri 4:00 PMProject executiveThe weekly owner report drafts itself from live Procore data. The PX reviews it, adjusts the tone, and sends it.

Scenario drawn from the demo project seeded in the Procore sandbox (sheet S-300): RFIs #18–#23, the curtain wall submittal and three change events.

A-200Market context

What changed in 2026

Procore

Procore now ships its own agents

  • Datagrid acquisition (Jan 2026), then agents built into Procore: Deep Search, Submittal Reviewer, RFI, Daily Log and Contract Review.14
  • Paid packages generally available since July 2026, with Agent Studio for custom agents and usage-based pricing.15
  • Groundbreak, Oct 2026: Procore AI MCP connects an enterprise Claude environment to Procore AI, with other providers "coming in 2027."12
Google Cloud

The agent platform now takes outside MCP servers

  • Gemini Enterprise's custom MCP server connector became generally available in Aug 2026. It requires Streamable HTTP and OAuth 2.0, and allows at most 100 enabled actions.16
  • Vertex AI is now Gemini Enterprise Agent Platform. ADK agents run on Agent Runtime; Agent Registry catalogs MCP servers; Agent Gateway governs what agents can reach outside.17
  • Google offers managed MCP servers for BigQuery and Looker, so Procore history can sit next to ERP and schedule data.18
Positioning: complement, don't compete

Leave the single-task, inside-Procore work to Procore. Its agents will keep getting better at drafting an RFI or reviewing one submittal. The open ground is work that crosses systems: joining Procore with ERP cost, the schedule, BigQuery history and Workspace, inside the GC's own Google Cloud project, under the GC's own permissions, audit and approval rules. It also works today for Gemini-first GCs, without waiting for 2027.

S-100Structure

How it works

The model never sees Procore credentials and never sees all 2,755 endpoints. It sees a small set of tools, and every action passes through one checkpoint that the GC controls.

Layer 1

People & surfaces

Gemini EnterprisePMs, PEs, execsGoogle Chat / Gmail / Sheetsbriefs and alerts land hereClaude Desktop / Codeanalysts, buildersField mobilesupers, foremen
Layer 2

Agents

ADK agents on Agent RuntimeRFI radar, change rollup, varianceWorkflow Builder agentsno-code, built by the GCA2A agentsdata and ERP agentsScheduled jobsmorning brief, weekly owner report
Layer 3

Governance edge

Agent GatewayIAM-governed egressAgent Registrycatalog of MCP servers and toolsModel Armorprompt-injection screeningCloud Loggingone audit trail
Layer 4 · BuildFlows

Procore MCP server

Cloud Run, in the GC's own project
Router mode27 meta-tools: search, describe, call, plan, run workflow 2,755 generated toolsfull Procore REST surface, regenerated from the API spec 12 personas · 22 policies · 70 capability bundles
1validate args2rate limit3policy4confirm writes5idempotency6call Procore7audit8shape + redact PII
Layer 5

Systems of record

Procoreservice account, permissions set per tool by the GC adminERPVista / Sage / CMiC / AcumaticaScheduleP6 / MS ProjectBigQuery + Lookerhistory, portfolio analytics
Why router mode matters

Small tool surface, same reach

ModeTools the model seesFits Gemini Enterprise?
Expanded2,755No · 100-tool cap
HybridPersona subset + meta-toolsIf kept under 100
Router27 meta-toolsYes
The questions a GC security team will ask

Answered by design

  • Where do credentials live? On the server, never in the prompt or the client.
  • What can it touch? Only what the GC admin grants the Procore service account, narrowed again by persona and policy.
  • Can it write? Read-only by default. Writes need a signed, single-use confirmation, with two-person approval available.
  • Is it auditable? Every call writes an audit record, to a file, OTLP or a webhook (Cloud Logging, SIEM).
  • What about API drift? Tools are regenerated from Procore's API spec, not hand-written.
S-110Detail

Inside the checkpoint

Every tool call, from any agent, takes the same eight steps. Two requests are shown below: a read that passes every check, and a delete that policy stops at step 3. Both leave an audit record.

✓ read: answer returned · audit record written 1ValidateJSON schema 2Rate limitper tenant 3Policydeny · scope · hours 4Confirmsigned token (writes) 5Idempotency24 h replay 6Call Procoreservice account 7Auditwho · what · when 8Redact + shapePII out, tokens down list_project_rfi_rfis delete_project_rfi ✕ blocked by policy readonly-by-default / deny-deletes Denied before Procore is ever called · audit record written · verified live in the sandbox

One request, end to end on Google Cloud

The production path, as a sequence. Numbers match the order of events. Return paths are dashed.

Project managerGemini Enterprise RFI agentADK · Agent Runtime Agent GatewayIAM egress policy Procore MCPCloud Run · GC project Procore APIservice account Audit storeCloud Logging · BigQuery 1"Which RFIs are late?" 2tools/call procore_call_tool 3identity checked · forwarded 4GET …/rfis (after checks 1–5) 523 open RFIs (JSON) 6audit record: user, agent, tool, project, outcome, correlation ID 7shaped, redacted result (checks 7–8) 8ranked list +drafted chase notes
S-200Schedule of use cases

Use-case catalog

Twelve use cases, scored 1–5 on value (hours and dollars at stake) and feasibility (data readiness, how much writing they need, integration effort). The scores are BuildFlows' judgment, to be re-scored with each GC.

START HERE 12345 12345 FEASIBILITY → VALUE → 1 2 3 4 5 6 7 8 9 10 11 12
Show
1

RFI aging and ball-in-court radar

Value 5Feasibility 5Read-only
Persona
Project engineer, PM
Data
RFIs, assignees, due dates, linked drawings and specs
Workflow
Each morning, rank open RFIs by days overdue and ball-in-court, flag the ones tied to near-term activities, and draft chase notes for the PE to send.
ROI logic
Shorter RFI cycle time means fewer idle crews and fewer delay claims. Measure the change in median days-to-answer against the GC's own baseline.
2

Change exposure rollup

Value 5Feasibility 3.5Read-only
Persona
PM, project executive
Data
Change events, potential and commitment change orders, budget modifications
Workflow
Weekly rollup of open exposure by status and age, what's unpriced, and what hasn't been submitted to the owner, with a narrative for the OAC meeting.
ROI logic
Unbilled or late-submitted change work is margin given away. Recovering one missed change order often pays for the pilot.
3

Budget variance and forecast narrative

Value 5Feasibility 3Read-only
Persona
PM, project accountant, CFO
Data
Budget views and detail rows, direct costs, commitments, ERP job cost
Workflow
Weekly: which cost codes moved, why, and what's projected over. Procore and ERP reconciled before month-end rather than after.
ROI logic
Variance caught weeks earlier means time to buy out, re-sequence or price a change. Measure the time from cost hit to flag.
4

Submittal-to-procurement risk

Value 4Feasibility 3.5Read-only
Persona
Project engineer, procurement
Data
Submittals, status, reviewers, required-on-site dates, schedule
Workflow
Flag submittals still in review whose lead time no longer clears the activity's start date, and route the list to the right reviewer.
ROI logic
One avoided long-lead slip (switchgear, curtain wall, elevators) can be worth weeks of general conditions.
5

Superintendent morning brief

Value 3.5Feasibility 4.5Read-only
Persona
Superintendent, foreman
Data
Daily logs, manpower, delays, inspections, open RFIs, weather
Workflow
A brief at 6:00 AM in Google Chat or email: yesterday's manpower and delays, inspections due, RFIs blocking today's work.
ROI logic
Gives back part of the hours spent searching for data. Track how many supers open it and their self-reported minutes saved.
6

Weekly owner and executive report

Value 4Feasibility 4Read-only
Persona
Project executive, operations VP
Data
RFIs, submittals, change, budget, safety, schedule milestones
Workflow
Assemble a draft of the weekly owner report in Docs or Slides from live Procore data. The PM edits and sends it.
ROI logic
PMs often spend half a day a week on reporting. Measure drafting hours before and after.
7

Subcontractor compliance watch

Value 3Feasibility 5Read-only
Persona
Vendor admin, risk manager
Data
Directory vendors, insurance certificates, expiration dates
Workflow
List subs whose COIs expire in the next 30 days or who are working on site without current coverage.
ROI logic
Lowers uninsured-loss risk. It's a cheap, fast win that builds trust in the system.
8

Punch and closeout tracker

Value 3Feasibility 4Read-only
Persona
Superintendent, PM
Data
Punch items, ball-in-court, trades, inspections, closeout documents
Workflow
Punch items open by trade and age, plus a list of closeout documents still missing, sent weekly to each sub's contact.
ROI logic
Faster closeout means earlier retainage release and a quicker move of the team to the next job.
9

Portfolio analytics in BigQuery

Value 4.5Feasibility 2.5Read-only
Persona
Operations VP, CFO, preconstruction
Data
Procore history across projects, plus ERP and schedule
Workflow
Land Procore data in BigQuery and ask cross-project questions in Gemini or Looker, such as which subs drive the most RFIs or which project types run over on change.
ROI logic
Better bids and sub selection. This is a longer build that depends on a solid data foundation.
10

Pay app and retainage reconciliation

Value 4.5Feasibility 2Read, then approved writes
Persona
Project accountant, AR/AP
Data
Commitments, invoices, requisitions, ERP AP/AR
Workflow
Match Procore requisitions to ERP entries, flag mismatches and retainage held past terms, and prepare corrections for approval.
ROI logic
Cash flow. Retainage often waits more than 60 days to collect. Needs ERP access and careful controls on writes.
11

Safety observation trends

Value 2.5Feasibility 4Read-only
Persona
Safety manager
Data
Observations, incidents, near misses, safety violation logs
Workflow
Weekly roll-up of observations by trade, area and type, with repeat issues flagged for the next toolbox talk.
ROI logic
A leading indicator. The value is in incidents that don't happen, which is hard to price but important to owners.
12

Meeting actions into Procore

Value 3Feasibility 2.5Writes, confirmed
Persona
PM, PE
Data
Meeting transcripts (Meet), RFIs, punch, meeting minutes
Workflow
Turn an OAC meeting transcript into draft RFIs, punch items and minutes. A human confirms each write.
ROI logic
Removes double entry. This is a good first use of the write controls once the read-only pilot has earned trust.

What's it worth? A quick estimator

An illustrative estimate, not a forecast. Default values are conservative. The sourced figure is 5.5 hours a week spent searching for data; the default here assumes agents give back only 2 of those hours.

Hours given back per year3,84048 working weeks
Value of that time$364,800
Revenue needed to earn the same profit$9.1M= value ÷ net margin
S-300Proof · captured live Nov 16, 2026

Live sandbox demo

The open-source BuildFlows Procore MCP server running against a Procore developer sandbox, signed in with a server-to-server service account and limited to read-only. We seeded a realistic mid-rise project with RFIs, change events, submittals, a budget, subcontracts and daily logs, then asked the questions a GC team asks every week. Every number on this sheet came back from the live Procore API.

Open RFIs2322 past due
Change exposure$114,0215 open or pending events
Projected over budget$261,0503 cost codes
Smoke test11 / 11checks passed

RFI radar: days past due (seeded RFIs)

#22 Elevator pit depth vs. waterproofing17 d
#23 L2 storefront head height (A-201 vs A-401)14 d
#18 Curtain wall embeds vs. PT anchors, L410 d
#19 Duct vs. sprinkler main, L3 corridor6 d
#20 Firestopping at 2-hr corridor walls4 d
Tool: list_project_rfi_rfis · ball-in-court: architect (4), sub (1)

Change exposure by event (ROM)

CE-003 Curtain wall embed relocation · Pending$48,500
CE-005 Unforeseen rock at elevator pit · Pending$27,800
CE-004 L3 ceiling reroute (duct/sprinkler) · Open$18,500
CE-002 Sandbox test event · Open$12,221
CE-001 Sandbox test event · Open$7,000
Tools: list_change_events, list_potential_change_orders · total $114,021

Over budget: committed vs. budget

08-900 Glazed curtain wall · budget $3,150,000+$168,400
15-700 HVAC · budget $2,780,000+$81,250
07-800 Fire & smoke protection · budget $185,000+$11,400
Tools: list_budget_views, list_budget_view_detail_rows, list_work_order_contracts · project budget $12,104,900 → estimate at completion $12,365,950

Daily log, Fri Nov 13: manpower by sub

Summit Concrete Constructors16
Allegheny Mechanical7
Tri-State Fire Protection5
Keystone Curtainwall & Glazing4
32 workers · 224 hours · rain 0.6 in. · crane down 7–11 AM for wind · weather, manpower and notes log tools

The conversations

Abridged transcripts. The model saw a filtered set of 42 tools (a GC persona with read-only and sandbox-only policies) and chose the calls shown.

Q1 · Project engineer
Which RFIs on Skyrise are overdue, and who has the ball?
list_project_rfi_rfisstatus=open
23 open RFIs, 22 past due. The oldest ones are leftover sandbox test records. These are the live ones that matter most:
RFISubjectLateBall
#22Elevator pit depth vs. waterproofing17 dArchitect
#23L2 storefront head height14 dArchitect
#18CW embeds vs. PT anchors, L410 dArchitect
#19Duct vs. sprinkler main, L36 dSubcontractor
#18 is holding the L4 curtain wall crew (see the 11/13 daily log). Want me to draft chase notes?
Q2 · Project manager
What change exposure haven't we resolved yet?
list_change_eventslist_potential_change_orders
$114,021 across 5 open or pending change events. The three real drivers: • CE-003 curtain wall embed relocation: $48,500, pending. It traces to RFI #18.
• CE-005 unforeseen rock at the elevator pit: $27,800, pending.
• CE-004 L3 ceiling reroute: $18,500, open, and not yet priced to the owner.
All five are still at the rough-estimate (ROM) stage, and none is tied to a subcontractor or owner change order yet. $76,300 is out of scope and should be recoverable: price and submit those PCOs. The two oldest events look like leftover sandbox test data.
Q3 · PM / project accountant
Where are we trending over budget?
list_budget_viewslist_budget_view_detail_rows
Three cost codes are projected over, $261,050 in total. Curtain wall is committed at $3,318,400 against $3,150,000 (+$168,400). HVAC is at $2,861,250 against $2,780,000 (+$81,250). Fire and smoke protection is +$11,400. In each case the subcontract was awarded above the budget line, and no budget modification has been posted yet.
Q5 · Superintendent
Summarize Friday's daily log (11/13).
…weather_logs…manpower_logs…notes_logs
Fri 11/13: 32 workers, 224 hours. 0.6 in. of rain with gusts to 30 mph; the crane was down 7–11 AM. The L5 deck pour moved to Mon 11/16 at 6 AM, with the pump truck re-booked. L4 curtain wall install is waiting on the embed RFI (#18). There was a near miss at the L4 east stair from wind-lifted plywood, and a toolbox talk was held. The owner's rep asked for pricing on an L3 lobby finish upgrade.

Write attempt: blocked

We asked the agent to create an RFI. The readonly-by-default policy denied it inside the checkpoint before any request reached Procore. That is the behavior a pilot starts with.

Smoke test: 11 of 11

startup · auth · projects · RFIs · submittals · change events · budget · commitments · daily logs · write-denied · router meta-tools

Each check runs in under 2.1 seconds against the live sandbox.

Try it yourself. The server is open source at github.com/charley-forey/procore-mcp. The design is explained in Routing 2,755 Procore API Tools Through MCP Without Drowning the Model.

S-400Workflow blueprints

How the top workflows run, step by step

Each blueprint is a buildable spec: what starts it, which Procore tools it calls (the names used in the live demo), what the agent works out, what lands where, what the human does, and how we know it worked.

Agent stepHuman decisionOutput and measurement

1 · RFI radar

L0 read → L1 draftPersona: rfi_manager
Trigger

Weekdays 7:00 AM, plus on demand ("what's late?")

Gather

list_project_rfi_rfis · …_rfis_replies · daily-log notes

Reason

Rank by days late and cost/schedule impact. Match each RFI to work the daily log says is on hold.

Output

Ranked list in Google Chat, with a drafted chase note for each ball-in-court party

Human

The PE edits and sends the chase notes, or snoozes items

Measure

Median days-to-answer; count of RFIs over 7 days late

Demo proof#18 (10 days late) was matched to the L4 curtain wall crew on hold in the 11/13 log.
Data accessRFIs, replies and daily logs on the projects in scope. Read-only.
Build effortLow. The tools are verified; the work is ranking logic and the Chat card.

2 · Change exposure rollup

L0 read → L1 draftPersona: change_event_manager
Trigger

The day before the OAC meeting, and whenever a change event is created

Gather

list_change_events · list_potential_change_orders · list_work_order_contracts

Reason

Split recoverable (out of scope) from TBD. Age each event, flag missing markup, link the RFI that caused it.

Output

Exposure table plus an OAC narrative in Google Docs

Human

The PM prices the PCOs and decides the TBD scope calls

Measure

Days from change event to PCO submitted; dollars recovered

Demo proof$114,021 open. $76,300 out of scope and recoverable; no PCOs issued yet.
Data accessChange events, PCOs and commitments. Read-only.
Build effortMedium. There's no packaged workflow in the repo yet; this would be the first.

3 · Budget variance narrative

L0 read → L2 confirmed writePersona: budget_analyst
Trigger

Every Monday, and when a new commitment is approved

Gather

list_budget_views · list_budget_view_detail_rows · list_work_order_contracts · ERP job cost

Reason

Compare committed with revised budget by cost code. Find buyout overruns with no budget modification posted.

Output

Variance memo by cost code, with the commitment behind each line

Human

The PM approves a proposed budget modification (signed confirmation)

Measure

Days from cost hit to flag; month-end surprises

Demo proofCurtain wall +$168,400, HVAC +$81,250, firestopping +$11,400, all from awards above budget.
Data accessBudget views and commitments; ERP through your data layer.
Build effortMedium. Matching ERP cost codes to Procore is the main work.

4 · Superintendent morning brief

L0 readPersona: field_super
Trigger

5:45 AM on workdays

Gather

Weather, manpower and notes logs · open RFIs · submittals due · inspections

Reason

What changed since yesterday, what blocks today's work, what's due this week

Output

One Chat card or email, readable in 60 seconds on a phone

Human

The super reviews it and uses it for the 7 AM huddle

Measure

Open rate; minutes saved (weekly pulse survey)

Demo proof11/13: 32 workers, crane down 7–11 AM, pour moved to 11/16, one near miss.
Data accessDaily logs, RFIs, submittals and inspections. Read-only.
Build effortLow. It's the quickest visible win for field adoption.
M-100Means & methods

Pilot to production

What's ready today, and what a pilot hardens

An honest read of the open-source server, from a code audit done for this document. The foundation is solid; the items marked "harden" are the pilot's engineering work.

AreaTodayStatusPilot work
Procore coverage2,755 tools generated from Procore's API spec, covering reads and writesReadyValidate the endpoints the chosen workflow uses against the GC's real data
Dispatch checkpointValidation, rate limits, policy, idempotency, audit, PII redaction and tracing on one pathReadySend audit records to Cloud Logging and BigQuery
Write safetySigned single-use confirmations, two-person approval, sandbox-only and read-only policiesReadyTurn them on by default for the GC's personas
Tool routing accuracyKeyword + semantic search over the catalogHardenTune for the pilot's workflows; pin known-good tools per use case; build an evaluation set from the GC's real questions
Workflows196 workflow definitions, mostly single read stepsHardenBuild 2–3 real multi-step workflows for the chosen use case (e.g. RFI radar, change rollup)
Change events, commitmentsTools exist; no packaged workflow yetBuildChange-exposure workflow over change events, PCOs and commitments
Data scoping policiesTemplates for PII export, financial export and project allow-listsConfigureFill in the GC's project, company and field rules
Hosting and auth for GeminiDocker image, Streamable HTTP, per-request credentialsDeployDeploy to Cloud Run in the GC's project, front it with OAuth 2.0, register in Agent Registry, route through Agent Gateway

Write governance ladder

L0

Read and answer

Questions, briefs, reports. No changes to Procore. Where every pilot starts.

L1

Draft

The agent drafts RFIs, chase emails, owner reports and change narratives. A human sends or enters them.

L2

Confirmed write

The agent writes to Procore after a one-click human confirmation (signed, single-use, expires in 60 seconds).

L3

Two-person write

Financial or contractual changes need two different approvers. Deletes stay blocked.

Security and auth model

Procore side

A Procore service account (server-to-server OAuth). The GC's Procore admin installs the app and grants permissions tool by tool, only on the projects in scope. Sandbox first, then a production install.

Agent side

The MCP server runs in the GC's Google Cloud project. Gemini Enterprise connects over OAuth 2.0. Agent Gateway enforces which agents can reach it; Model Armor screens prompts.

Evidence

Every tool call writes an audit record: who, which agent, which tool, which project, the outcome and a correlation ID. Records land in Cloud Logging and BigQuery for the GC's security team.

A 90-day pilot with one GC

Weeks 0–2

Discover

  • Pick one workflow and 2–3 projects
  • Interview PEs, PMs and supers; capture their 25 real questions
  • Baseline metrics from Procore (RFI cycle time, exposure age)
  • Procore sandbox and app install
Gate: workflow, metrics and data access signed off
Days 15–30

Build read-only

  • Deploy MCP server to Cloud Run (GC project)
  • Build the workflow agent with ADK; connect it to Gemini Enterprise
  • Evaluation set from the 25 questions
  • Audit records to BigQuery
Gate: 90%+ correct answers on the evaluation set
Days 31–60

Run with users

  • 10–20 users on live projects
  • Daily or weekly briefs in Chat and email
  • Weekly tuning from feedback
  • Add drafts (L1)
Gate: measured hours saved, active weekly use
Days 61–90

Prove and expand

  • Turn on confirmed writes (L2) where users ask for them
  • ROI readout against the baseline
  • Security review package
  • Roadmap: next 2 workflows, ERP or BigQuery
Gate: go/no-go for production and rollout

Success metrics to agree up front

MetricHow measuredTarget to agree
RFI median days-to-answerProcore RFI timestamps, before and aftere.g. −20%
Change exposure ageDays from change event to owner submissione.g. −25%
Hours saved per userWeekly two-question pulse survey, plus usage logse.g. 2+ hrs/week
Answer accuracyEvaluation set plus thumbs up/down in usee.g. 90%+
AdoptionWeekly active users / invited userse.g. 60%+
SafetyUnapproved writes and policy violations in the audit logZero

Who does what

A starting split for a first pilot, to agree with your teams. R = does the work · A = accountable · C = consulted · I = informed.

ActivityGCCloud / ITAgent build partnerBuildFlows
Executive sponsor and success metricsA/RCCC
Workflow discovery and designCICA/R
Procore app install and permissionsA/RIIC
MCP server hardening and Procore integrationIICA/R
Agent build (ADK) and Gemini Enterprise setupCCA/RC
Google Cloud project, IAM, Agent GatewayACRC
ERP and BigQuery data foundationCCA/RC
Security review packageACRR
Training, champions and adoptionAIRR
Commercials and cloud programsCA/RCC

Risk register

RiskLikelihoodImpactMitigation
Procore rate limitsMediumMediumProcore enforces hourly and 10-second spike limits, and we hit the spike limit in the sandbox today. Throttle centrally in the checkpoint, retry 429s with backoff, cache reads, and serve history from BigQuery.
Wrong tool pickedMediumMediumGive each workflow a filtered tool set (as in the demo persona), pin known-good tools, and gate releases on a 90% evaluation-set score.
Messy Procore dataHighMediumAgents surface hygiene problems (stale RFIs, test records) instead of hiding them. Start on well-kept projects.
Overlap with Procore AIMediumLowFocus on cross-system and Google-native workflows. Reassess at each Procore release; the Agent Marketplace is a possible channel.
Agent does too muchLowHighRead-only by default, signed confirmations for writes, deletes blocked, Agent Gateway egress policy, Model Armor, and a full audit trail.
Low adoptionMediumHighDeliver into Chat and email rather than a new app. Recruit a field champion per project, tune weekly, and publish the wins.
Procore API changesMediumLowRegenerate tools from Procore's API spec and run contract tests in CI before each release.
Model usage costLowLowRouter and hybrid modes keep tool definitions small. Large outputs are summarized and paginated, and usage is metered per tenant.
E-100Engagement

Where BuildFlows plugs in

BuildFlows brings Procore and construction-workflow depth. We work alongside your IT team, your cloud platform and any agent-build partner you already use.

Option A · about 2 weeks

Workflow discovery and architecture sprint

  • On-site or remote interviews with one GC's PMs, PEs and supers
  • Ranked use cases with baseline numbers from their own Procore
  • Target architecture on their Google Cloud project
  • Pilot plan, metrics and security brief
Option B · 90 days

One-GC pilot, built and run

  • Everything in Option A
  • Procore MCP server hardened and deployed in the GC's project
  • One workflow agent live in Gemini Enterprise for 10–20 users
  • ROI readout and production go/no-go
Option C · ongoing

Embedded Procore specialist on your agent builds

  • Procore and construction ERP integration on partner-led builds
  • Workflow design reviews with GC operations staff
  • MCP server maintenance as Procore's API changes
  • Repeatable playbook for the next GC
E-200Next steps

Next steps

  1. Name the first projects and the first workflow

    Pick the business unit with the most Procore usage and an executive sponsor. BuildFlows suggests RFI aging or change exposure as the first workflow.

  2. Hold a 60-minute working session with that GC's operations lead

    Walk through their week, capture their real questions, and agree the baseline metrics.

  3. Get Procore access

    The GC's Procore admin installs a sandbox app with read-only permissions on 2–3 projects. No production writes during the pilot's first phase.

  4. Agree the split of work

    Who owns the agent build, the Procore layer and workflow design (BuildFlows), and the cloud platform. Pick option A, B or C.

  5. Set the readout date

    Put a 30-day checkpoint and a 90-day ROI readout on the calendar now.

Z-100Questions

Questions GC teams ask

Why not wait for Procore AI MCP to support Gemini?

Procore says support for other providers is "coming in 2027" but hasn't given a date. Even when it arrives, Procore AI MCP answers questions about Procore. The bigger value is in workflows that join Procore with ERP, the schedule and BigQuery, run in the GC's own cloud and follow the GC's own rules. A governed MCP layer does that today and still fits alongside Procore AI later.

Does this replace Procore's own agents?

No. Use Procore's agents for in-app tasks like drafting an RFI or reviewing a submittal. This layer covers the work that spans systems and teams, and the surfaces where people already spend their day: Gemini, Google Chat, Gmail and Docs.

Does Procore data leave our cloud?

The MCP server runs in the GC's own Google Cloud project. Procore data passes through it to the model the GC has chosen, under the GC's Google Cloud agreements. Audit records stay in the GC's Cloud Logging and BigQuery. Credentials never reach the model.

Can the agent change or delete data in Procore?

Not by default. The pilot starts read-only; the demo shows a create request blocked by policy. Writes are turned on per workflow and need a signed one-time confirmation, with two-person approval available for financial changes. Deletes stay blocked.

What does the GC need to provide?

An executive sponsor, a Procore admin to install the app on 2–3 projects, a Google Cloud project, 10–20 willing users, and about 2 hours a week from an operations lead during the pilot.

How soon is there something useful?

A read-only workflow like the RFI radar or morning brief can be in users' hands within the first 30 days. The demo on sheet S-300 was built and seeded in a single day.

What does it cost to run?

Running costs are Cloud Run hosting plus model usage, which depends on how many users and workflows are live. Router and hybrid modes keep each call's tool definitions small. The discovery sprint produces a cost estimate based on the GC's own volumes.

Who owns the code?

The Procore MCP server is open source. Workflow definitions, personas and policies are plain YAML files that the GC can read, review and keep. Ownership of custom agent code is agreed in the engagement.

What about Autodesk, our ERP, or the schedule?

The same pattern applies: one governed MCP layer per system behind the same checkpoint and audit. ERP and schedule data usually come in through your data foundation and BigQuery.

Z-200Terms

Glossary

RFI
Request for Information: a formal question from the contractor to the design team.
Ball-in-court
Who currently owes the next action on an item.
Submittal
Shop drawings, product data or samples sent for design-team approval before buying or building.
Change event
Procore's record of a potential change in cost or scope, before it becomes a change order.
PCO / CCO
Potential change order (to the owner) / commitment change order (to a subcontractor).
ROM
Rough order of magnitude: an early estimate of a change's cost.
Commitment
A subcontract or purchase order. Buyout above the budget line shows up as variance.
Budget view
Procore's configurable budget report: original, revised, committed, projected.
OAC meeting
Owner-architect-contractor meeting, usually weekly or biweekly.
Daily log
The field's daily record: weather, manpower, notes, delays, safety.
Retainage
Payment held back until completion, often 5–10%.
MCP
Model Context Protocol: the open standard for connecting AI models to tools and data.
Router mode
The model sees about 27 meta-tools that find and call the right one of 2,755 Procore tools.
Hybrid mode / persona
A role-specific set of exact tools plus meta-tools. The demo used a 42-tool GC persona.
Policy
A YAML rule enforced at the checkpoint: read-only, deny deletes, two-person approval, scoping.
Service account (DMSA)
Procore's server-to-server login. The GC admin grants its permissions tool by tool.
Gemini Enterprise
Google's employee-facing agent hub (formerly Agentspace).
ADK
Agent Development Kit: Google's open-source framework for building agents in code.
Agent Runtime
Managed hosting for ADK agents (formerly Vertex AI Agent Engine).
Agent Gateway
Enforces which agents can call which outside tools and MCP servers.
Agent Registry
Catalog of an organization's agents, MCP servers and tools.
A2A
Agent2Agent: an open protocol for agents to call each other across vendors.
Model Armor
Google's screening for prompt injection and unsafe content.
Idempotency
Safe retries: the same request twice has the effect of one.
Z-900References

Sources

Older studies are cited with their year. Procore customer results are self-reported by Procore. The use-case scores and the estimator are BuildFlows estimates, labeled as such.

  1. Autodesk / FMI, "Harnessing the Data Advantage in Construction" (2021). investors.autodesk.com/node/32031/pdf
  2. FMI, "Harnessing the Data Advantage in Engineering and Construction" (2021). fmicorp.com
  3. FMI / PlanGrid, "Construction Disconnected" (2018). autodesk.com/blogs/construction/survey-plangrid-fmi
  4. FMI / PlanGrid press release on $177B in avoidable cost (2018). prnewswire.com
  5. Navigant Construction Forum RFI study (2013), via Procore. procore.com/library/rfi-construction
  6. AGC / NCCER 2025 Workforce Survey. nccer.org
  7. ABC, workforce demand for 2026. ecmweb.com
  8. McKinsey, "How AI is reshaping the future of the AEC industry" (2026). mckinsey.com
  9. Dodge Construction Network / CMiC, "AI for Contractors" (2025). businesswire.com
  10. CFMA Construction Financial Benchmarker executive summary (2024). cfma.org
  11. Procore Q4 / FY2025 results. businesswire.com
  12. Procore, Groundbreak 2026 announcements (Procore AI MCP). procore.com/blog
  13. Buildots schedule benchmark, via For Construction Pros. forconstructionpros.com
  14. Procore, "New Procore AI experience embeds Datagrid into Procore" (2026). procore.com/press
  15. Procore, "Your digital coworkers are ready to work" (2026). procore.com/blog
  16. Google Cloud, Gemini Enterprise custom MCP server setup. docs.cloud.google.com
  17. Google Cloud, Gemini Enterprise Agent Platform overview. docs.cloud.google.com
  18. Google Cloud, official MCP support for Google services. cloud.google.com/blog
  19. Procore developer docs: service accounts (DMSA) and rate limiting. procore.github.io
  20. BuildFlows, "Routing 2,755 Procore API Tools Through MCP Without Drowning the Model" (2026). buildflows.ai