Worksheet · Gate B · before any build

Three-bill proof test

Re-code three paid Ramp bills by hand in QuickBooks Online, from Category details to the Procore-created service item. Sync Procore. If the full amounts land on the right budget codes and the payments stay linked, the job-cost fix is proven on your data.

Company
Tested by
Date
1

Before you start

  • QuickBooks Online Plus or Advanced, with rights to edit bills
  • A Procore admin who can run an on-demand job cost sync
  • Read access in Ramp to see each bill's line coding
  • Bookkeeper agrees to the three bills you'll edit
  • Projects were created after Procore's QuickBooks Online connector was connected
  • Each target service item exists in Products and Services, e.g. 2401-03-300.M
2

Pick three bills

  • Paid through Ramp
  • Three different cost types (e.g. .M .S .O)
  • At least one bill with two or more lines
  • Dated in an open period, after the closing date
  • Not edited in Ramp since it synced. Leave it alone in Ramp during the test
3

Capture "before"

Category details: filled · Item details: empty · Procore: $0
  • Screenshot in Ramp: bill, line coding, payment
  • Screenshot in QuickBooks: bill view, both sections, payment
  • Screenshot in Procore: budget line (ERP direct costs) and Direct Costs list
  • Note any yellow banner on the Procore budget
  • Note the service item's expense account; bookkeeper OKs where the cost will post
4

Re-code in QuickBooks

  • Add one Item details line per category line
  • Product/Service: the Procore item for this project
  • Same amount (qty 1, rate = amount), same description
  • Keep customer/project as it was
  • Remove only the moved Category lines; leave tax/freight
  • Total matches to the cent. Vendor, date, bill no., AP account unchanged
  • Add a memo: "Re-coded by hand, three-bill test, date, initials"
5

Check the payment

Bill: Paid · Payment: still applied · Total: unchanged
  • Reopen the bill: still shows Paid
  • Bill payment still lists this bill, same amount
  • Vendor balance unchanged
  • Unlinked? Stop, restore from screenshot, ask bookkeeper
6

Sync Procore and read

  • Run the on-demand job cost sync, or wait for the daily import
  • Budget: full amount on the right budget code
  • Direct Costs: one record per bill, lines on the right code
  • Second record for the same bill? Write it down
  • Banner cleared?
Edit in placeNever delete and re-enter. Procore can't see deletes; voids go to $0.
Move lines onlyAmounts, vendor, dates, bill number and total never change.
Three of threeOne failure stops the build until it's explained.
Record your results

Before and after, bill by bill

The grey column is a worked sample (made-up data). Fill in your three bills.

FieldSampleBill 1Bill 2Bill 3
The bill
Bill number10482
VendorExample Concrete Supply
ProjectProcore project number and name2401 Sample Clinic TI
Ramp codingcost code per line03-300 Concrete
Cost typeand the rule you usedM (materials acct)
Target service item2401-03-300.M
Item's expense accountbookkeeper OK?5000 Job Costs · OK
Number of lines moved2
QuickBooks Online
Total before$7,150.00
Total after$7,150.00
Open period (after closing date)YY / NY / NY / N
Still Paid, payment linkedYY / NY / NY / N
Memo addedYY / NY / NY / N
Procore
Budget code amount before$0.00
Sync runon-demand or daily, date/timeon-demand, 11/20 2pm
Budget code amount after$7,150.00
Direct cost records for this bill1
Banner cleared (if shown)n/aY / N / n/aY / N / n/aY / N / n/a
Result
Pass?PASSPass / FailPass / FailPass / Fail
Gate BPasses only if all three bills show the full amount on the right budget code and every payment is still linked with an unchanged total. Passed Failed, re-diagnose
If you seeCheck
Still $0 or missingItem belongs to this project? Project created after the connector? Budget code synced, cost codes 2+ tiers? Sync again.
Different amountA line left on Category details (tax, freight)? An amount changed? Compare line by line.
Two direct costs for one billRecord it. It shows whether Procore updates or duplicates an edited bill, which sets the cleanup rule for older bills.
Payment unlinkedRestore the bill from your "before" screenshot. Don't continue until it's understood.
Tested by
Bookkeeper / controller
Owner sign-off