Sign-off sheet · page 1 of 2

Rollout gates: proof of concept to live

One card per stage. Write the gate before the stage starts, attach evidence, and have the owner sign. Dates are targets. A missed date moves the date, never the gate.

00

Proof of concept

Gate: Owner has seen it work. Nothing to sign yet.
  • Full app on sample data, hosted at a real address
  • Owner signs in with their own login and tries every role
  • No real client data in the app
  • 0 writes to the accounting system
01

Agree and sign

Contractor: review, sign · Builder: agreement, walkthrough
Gate: Signed agreement. No live system touched before this.
  • Owner (and partners) click through with own logins
  • Optional 20-minute walkthrough
  • Agreement signed; kickoff date set
  • Pass thresholds for later gates agreed in writing
Owner signatureDateEvidence
02

Access and secure setup

Contractor: 3 admins × 15 min, user list · Builder: apps, users, self-tests
Gate: Every connection shows green and passes its self-test.
  • Builder registers its apps; keys only in the hosting vault
  • Admins click Connect in QuickBooks, Procore, Ramp
  • Real users invited; everyone sets own password
  • Two-step sign-in on for admins; sample data removed
Owner signatureDateEvidence
03

Live data and mapping

Contractor: lists, PM assignments, workshop time
Gate: Projects and cost codes match Procore; data health is clean.
  • First sync, read only: projects, cost codes, budgets, commitments, COs, P&L, AR/AP, card spend
  • Customers, cardholders and projects matched
  • 60–90 min mapping workshop: categories → cost codes
  • Re-code cut-off date agreed; data health checks on
Owner signatureDateEvidence
04

Tie out the numbers

Contractor: owner + whoever closes the books
Gate: Owner agrees numbers match within tolerance: ________
  • 2–3 known jobs: contract, billed, cost to date, committed, margin
  • WIP and over/under billing vs last month-end
  • Cash, AR aging, 13-week forecast
  • Every mismatch fixed at its source and logged
Owner signatureDateEvidence
05

Approver go-live

Step-by-step detail on page 2
Gate: 20+ live expenses on the right cost code; totals, vendors, payment accounts unchanged; every write logged.
  • Step 1 Preview only: proposed lines reviewed
  • Step 2 Shadow week: match rate ____ % (target ≥ 95%)
  • Step 3 Sandbox: writes and deliberate refusals checked
  • Step 4 Live: 1 expense → small batch → all
Owner signatureDateEvidence
Sign-off sheet · page 2 of 2

Go-live steps and the last stages

Nothing moves up a step without the owner's say-so. Practice the rollback during the sandbox test.

5.1

Preview only

Gate: Pass: every line explained. Fail: fix mapping or item, re-run.
  • Every proposed line explained by the bookkeeper
  • Every needed QuickBooks item exists (app never creates items)
  • Linked, closed-period and overhead lines excluded
Owner signatureDateEvidence
5.2

Shadow week (5 working days)

Gate: Pass: ≥ ____ % match, all misses explained, no money fields changed.
  • Field users code; owner approves; accounting codes the same by hand
  • Compare item, project, amount, vendor, payment account, date
  • Every mismatch has a written cause and a fix at its source
Owner signatureDateEvidence
5.3

Sandbox test

Gate: Pass: all writes and refusals as expected, all in the audit log.
  • Full write path against a test company
  • Try a closed-period date, a changed total, a missing item: each refused
  • Write mode back to preview stops writes at once (rollback drill)
Owner signatureDateEvidence
5.4

Live, with sign-off

Gate: Pass: 20+ live expenses right; nothing else changed.
  • Owner signs off in the app (recorded)
  • 1 low-value expense → check QuickBooks and Procore
  • Small batch (about 10) across projects → check → open up
Owner signatureDateEvidence
06

Tailor and roll out

Gate: Field users code without help; owner runs the weekly review from the dashboard.
  • Grade weights and KPI tolerances set by owner
  • Each page walked with its real users: keep, cut, change
  • Digest, scheduled reports, approval emails on
  • 15-min field training + one-page guide
Owner signatureDateEvidence
07

Folders and Convert to won

Gate: Proven on three real projects.
  • Microsoft 365 admin consent granted
  • Template folder and numbering confirmed
  • Create project + Convert to won run end to end
Owner signatureDateEvidence
08

Connect the AI vendor

Gate: Vendor reads with a scoped, revocable, read-only key.
  • Embedding allowed only from the vendor's site; sign-in kept
  • One read-only key per vendor; MCP off until enabled
  • No write tools without owner's written approval
Owner signatureDateEvidence
!

Rollback plan

  • Stop: write mode back to preview
  • Preserve: export audit log, back up database
  • Assess: list every write, before and after
  • Correct: fix lines in QuickBooks with accounting
  • Re-enter: pass the failed gate again