Step zero · check before you build

Ramp → QuickBooks → Procore: settings to check first

Ramp writes bill coding to Category details. Procore's QuickBooks Online connector only retrieves job costs from lines on the service items Procore created (like 2401-03-300.M). Settings cost nothing: rule these out in week 1.

0

Connector basics

Procore admin
  • QuickBooks Online Plus or Advanced (Projects needed)
  • One QuickBooks company per Procore site
  • Jobs are QuickBooks Projects, not sub-customers
  • Each active project created after the connector was connected, and linked
1

Ramp Bill Pay line type

Ramp support
If yes: no rewrite needed, build only the nightly check
  • Ask in writing: can bill lines use our Procore Service items (Item details)?
  • Test 1 bill: switch a line to an item, sync, open it in QuickBooks
  • Card spend: no item field documented. Ask separately
  • On Ramp for Construction? Ask where job and cost code land in QuickBooks
2

Cost codes and service items

Procore admin
  • Cost codes are 2+ tiers (03-300, not 300)
  • Project number set before budget lines were added
  • Products & Services: search 2401-, one Service item per budget code
  • Missing item? Add the budget code in Procore. Never create it in QuickBooks
3

Budget view

Procore admin
  • Budget view includes Direct Costs / Job to Date Costs
  • One known imported cost is visible on one project
  • Note any yellow mis-coded job cost banner
4

Where the cost code lives in Ramp

AP
  • Line-level field: each line coded on its own (best case)
  • Class: per line only with "one to each row in transaction"
  • Custom field (Ramp Plus): transaction level, one code per bill
5

Item expense accounts

Bookkeeper / CPA
Item details line → posts to the item's expense account
  • Open 3 Procore service items, note the expense account
  • Agree it with your CPA before any re-coding
  • Decide which GL accounts count as job cost (tax, freight stay Category)
6

Closing date

Controller
  • Closing date: ________ · Owner: ______________
  • API writes inside a closed period are rejected: plan a review queue
  • Ramp moves closed-period bills to the next open period
  • Re-code history back to: fiscal year start / open projects only
7

Sync timing and rules

Procore admin
  • Job costs import once a day; on-demand sync is available
  • Imported direct costs can't be edited in Procore
  • Edit bills in place. Never delete and re-enter (deletes aren't detected)
8

Owner decisions

Owner
  • Keep Ramp as where invoices are entered, or enter them in Procore first and pay in Ramp
  • Cost type rule: AP picks it in Ramp, or default it from the GL category (Materials → M)
  • Who reviews low-confidence bills, and by email or Teams
  • How far back to re-code past bills
Cheapest fix firstIf check 1 is a yes, skip the rewriter entirely.
Fix Procore, not QuickBooksMissing items come from unsynced budget codes.
Read-only firstWrite access only after a hand test on 3 bills.